
@AkkermanInc manufactures #GuidedBoring, #Microtunneling, #PipeJacking, #Sliplining & #Tunneling systems for pipe installations of all kinds.
Brownsdale, Minnesota, USA
Joined April 2012
- Tweets1.9K
- Following310
- Followers1.3K
- Likes859
Pinned Tweet
Since 1973, our industry-leading equipment has enabled contractors worldwide to productively install infrastructure. We’ve been here since the #trenchless industry was established and we continue to pave the road of innovation with our superior equipment.
Boyer, Inc. completed approximately 2,700-LF. of pilot tube microtunneling for the Westridge Lift Station project, supporting Houston’s wastewater infrastructure improvements.
See how Boyer, Inc. applied the 3-pass pilot tube method in the case study: bit.ly/4ipgVdO
2
33
As Akkerman continues to invest in its people and strengthen the teams, we're pleased to announce two more promotions.
Congratulations to Tim Fay, Mechanical Engineering Manager and Weston Alberts, Systems Engineering & IT Manager. Join us in celebrating Tim and Weston!
1
3
60
Pilot Tube Guided Pipe Ramming combines accuracy of pilot tube with driving force of pneumatic pipe ramming, providing a method for installing steel casing through challenging ground conditions.
Follow the link to determine if it’s a fit for your project: bit.ly/4einhsZ
2
62
Engineers Construction, Inc. utilized Akkerman’s Series I TBM 48SC and 5000 Series Pump Unit system on a project in Lebanon, NH.
Explore Akkerman’s range of trenchless equipment and the solutions available for your next underground project: bit.ly/3FNPs1m
1
3
43
From all of us at Akkerman, thank you for your service and freedoms you help protect.
From left: Matt Kressin (Army National Guard), Dalton Hoover (Navy), Mark Heimer (Army), John Flink (Marines), Riley Wondra (Army National Guard). Not Pictured: Dan Kolar (Army National Guard).
5
140
In his latest article, Casey Ristau breaks down how protective measures influence cutterhead performance and why preparation before the bore begins matters.
Visit the link to read the article to explore the role of hardfacing in tunneling performance: bit.ly/4jRZnrW
3
39
Akkerman is pleased to announce Brad Wheeler’s promotion to Vice President & Chief Product and Technology Officer.
His promotion reflects Akkerman’s investment in innovation and the next generation of trenchless solutions. Join us in congratulating Brad on this promotion!
2
60
As the son of founder D.H. Akkerman, Maynard helped shape the company through his leadership, innovation, and dedication to the people behind the work.
His impact extended beyond equipment we build to the relationships he fostered with employees, customers, and the community.
3
74
Young Construction Co. Inc. is actively involved in the I-85 Sanitary Sewer System Improvements project, managed by the South Granville Water and Sewer Authority.
This project focuses on replacing aging sewer infrastructure to meet the region’s needs and future capacity demands.
2
2
78
Akkerman will be attending No-Dig North in Calgary, Canada from November 2-4, 2026!
Chris Sivesind and Jon Valin will be there representing Akkerman and connecting with others in the trenchless industry. We look forward to being part of the conversation: bit.ly/42fq9kq
2
2
66
Happy Halloween! We hope you have a Halloween filled with plenty of treats and a few good scares.
Even Tripp is getting into the Halloween spirit, showing off his very own Akkerman TBM costume! Have a safe and happy Halloween from all of us at Akkerman!
3
37
Thank you to Jeff and the Total Trenchless team for your continued trust in Akkerman and for sharing your experience with us.
Looking for equipment backed by experienced aftermarket support? Connect with the Akkerman team to discuss your next project: akkerman.com/
1
3
27
This summer, a production team spent some time at Akkerman headquarters capturing the people, projects, and personalities behind the work we do.
Take a look behind the scenes with a few special appearances from our favorite four-legged team members: bit.ly/4zDRH1h
1
2
39
Moffat Pipe, Inc. completed twin tunnel drives for the US-401 & Ligon Mill Road Improvements project in Wake Forest, NC, installing 880-LF. of 48-in. steel casing.
See how Moffat Pipe completed this critical roadway crossing in the case study: bit.ly/4AO8kZr
2
32
Highways, railroads, and airports rely on carefully engineered infrastructure, making underground utility crossings a critical part of transportation projects.
Follow the link to explore Akkerman’s trenchless methods for road, rail, and runway crossings: bit.ly/3yqH4zV
1
3
25
Dibco/CRS Joint Venture completed a 1,890-LF., DN1800, 72-in. RCP tunnel for Twinning of Etobicoke Creek Trunk Sanitary Sewer project at Lester B. Pearson International Airport in December 2015.
The project required careful coordination and compliance with airport regulations.
3
71
Akkerman offers flexible sales, rental, and rent-to-purchase options to help contractors access the equipment they need while aligning with project demands and business goals.
Follow the link to explore Akkerman’s sales and rental options: bit.ly/3neOsLq
1
13
The Austin Daily Herald spoke with Justin Akkerman about stepping into the role of CEO, carrying on a family legacy that spans three generations, and what the future holds.
Follow the link to read the story and hear Justin’s perspective on what’s next: bit.ly/4hLcGrh
1
35
FAQ Highlight at Akkerman! When is the AZ100 Total Guidance System most useful?
Visit the link to review the AZ100 TGS Operator’s Manual, and if you have questions about using the system for your next project, reach out to the Akkerman team: bit.ly/4rY89GY
109
From replacement parts to field support, Akkerman’s aftermarket services are built to keep your equipment operating and your projects moving.
Ready to discuss your equipment needs? Visit the link to fill out the form and get in touch with our sales team: bit.ly/3xRMzH6
1
16













