@Astro_Cabi
iAccount based inUnited States
About this account
- Account based in
- United States
- Connected via
- United States App Store
Account-level information from X, not a live location or the device used for a specific post.
Driven by Innovation. Powered by Autonomy. Delivering people, packages and data. 🤝 #AstroLogistics 📦 #EazyCharge 🔋#AstroFleet 🚛
Joined November 2025
- Tweets509
- Following468
- Followers92
- Likes6.3K
AstroCab 🚀 retweeted
French inventor Franky Zapata crosses the English Channel, riding on a jet-powered hoverboard that he designed. More here: reut.rs/2yCzip6
French 'Flying Man' crosses the English Channel on a hoverboard - News
AstroCab 🚀 retweeted
We are inviting exceptional engineers to an all expenses paid, behind the scenes tour of Vegas Loop on Sunday, Oct 18.
Apply by Oct 1
BoringDayInVegas.com
Privileged to be a major investor in @boringcompany Series D and to have helped scale the team for 5 years.
Vegas Loop proved what’s possible. With the $3B raise, TBC is expanding to many more cities in the US and abroad.
This is a rare moment to join the team and help bring Loop to the next 100 cities.
We are inviting a select group of exceptional engineers and operators to an all expenses paid, behind the scenes tour of the Vegas Loop on Sunday, Oct 18.
Years of experience is not a filter. New grads and dropouts should apply.
Apply by Oct 1
BoringDayInVegas.com
AstroCab 🚀 retweeted
Vegas Loop isn’t just tunnels! In Vegas, besides 14 tunnels, TBC has built 14 stations (28 by end of year), 12 emergency egresses, 6 cross-passages, and 9 "knockout shafts".
See below for the construction of a cross-passage connecting "Tunnel-1" and "Tunnel-2" (beneath Paradise Road) to provide access and egress; construction time is ~10 days.
Steps:
1. If necessary, treat the ground (typically with grout) between the two tunnels such that it is stable during excavation.
2. Brace the Tunnel-1 wall with a steel frame and open up the concrete Tunnel-1 wall within said frame.
3. Excavate the dirt between the tunnels, installing steel ribs and wood lagging to maintain a safe roof until Tunnel-2 is exposed. This is a slow process of 10 feet per day.
4. Install waterproofing and rebar, the latter which anchors into both Tunnels 1 and 2 (see pic)
5. Install solid steel liner plate (see pic)
6. Pour high-strength concrete around the liner plate, reinforced with the rebar from Step 4
7. Open up Tunnel-2, finalizing the connection
Finally, the cross-passage is built out with a walking surface, ventilation, fire suppression valves, fire-rated doors, safety equipment/sensors, lighting, and cameras.
Vegas Loop isn’t just tunnels! It is also stations, merge/exit ramps, cross-passages, ventilation chambers, and emergency egress shafts.
See pics for the construction of an egress shaft; construction time is ~8 days. Steps:
1. Excavate down to expose the tunnel exterior
2. Install waterproofing, conduit, and rebar, followed by pouring a concrete base slab adjacent to the tunnel
3. Add steel-reinforced concrete walls and backfill the perimeter
4. Pour a concrete roof (leaving an opening for egress) and pave over the structure with asphalt; final surface impact is ~120 square feet
Once the structure is complete, a doorway is cut into the tunnel to connect the tunnel to the shaft. Finally, the shaft is built out with stairs, ventilation, standpipe, safety equipment/sensors, access hatch, lighting, and cameras.
AstroCab 🚀 retweeted
Vegas Loop isn’t just tunnels! It is also stations, merge/exit ramps, cross-passages, ventilation chambers, and emergency egress shafts.
See pics for the construction of an egress shaft; construction time is ~8 days. Steps:
1. Excavate down to expose the tunnel exterior
2. Install waterproofing, conduit, and rebar, followed by pouring a concrete base slab adjacent to the tunnel
3. Add steel-reinforced concrete walls and backfill the perimeter
4. Pour a concrete roof (leaving an opening for egress) and pave over the structure with asphalt; final surface impact is ~120 square feet
Once the structure is complete, a doorway is cut into the tunnel to connect the tunnel to the shaft. Finally, the shaft is built out with stairs, ventilation, standpipe, safety equipment/sensors, access hatch, lighting, and cameras.
AstroCab 🚀 retweeted
Reliable backup protection and predictable electricity costs for $35/month in Texas.
Elon Musk said his Boring Co. venture is working on a tunnel project in Texas that would connect the cities of Austin and San Antonio. bloomberg.com/news/articles/…
Boring Company is working on a simple, precursor Hyperloop tunnel between Austin and San Antonio (>200 mph).
Due to traffic congestion, that journey can currently take up to 2.5 hours. @BoringCompany can reduce that to a consistent <30 mins.
AstroCab 🚀 retweeted
Welcome back to TechCrunch Mobility, your hub for the future of transportation and now, more than ever, the role AI is playing in it. To get this in your inbox, sign up here for free — just click TechCrunch Mobility!
spr.ly/6013BGw6Od
The @Tesla Roadster can now be reserved.
Roadster reservations require an initial $5,000 credit card payment, plus a $45,000 wire transfer payment due in 10 days. Reservations are not final until the wire transfer payment is received.
tesla.com/roadster
AstroCab 🚀 retweeted
Prufrock-5 finishing a test-tunnel in Bastrop, Texas.
The ~900,000 lb boring machine will re-launch in November.
As we look toward commercial expansion in Europe, we’re teaming up with @AllianzPartners to build the insurance, claims, and safety foundation needed to scale across the continent safely and responsibly.
Learn more: waymo.com/blog/2026/09/allia…
AstroCab 🚀 retweeted
Tesla Cybercab is now touring Asia 🚕
The best way to predict the future is to create it.⚡️
Replying to @IShowSpeedHQ
1) Download Robotaxi app
2) Select Cybercab when booking your ride
3) Experience the future
@ishowspeedsui