Atmos Lab (@AtmosLab) header
Atmos Lab (@AtmosLab) profile picture

Atmos Lab produces the Finest Greek Products.Quality Control, Pure raw materials. Perfection. Made in Greece.

Athens, Greece
Joined May 2012
Photo by Atmos Lab (@AtmosLab)Photo by Atmos Lab (@AtmosLab)Photo by Atmos Lab (@AtmosLab)Photo by Atmos Lab (@AtmosLab)Photo by Atmos Lab (@AtmosLab)Photo by Atmos Lab (@AtmosLab)Photo by Atmos Lab (@AtmosLab)Photo by Atmos Lab (@AtmosLab)Photo by Atmos Lab (@AtmosLab)Photo by Atmos Lab (@AtmosLab)
Replying to @ElMonoVapeador
🤖 Made with AI
1
2
1
9
1,000
Replying to @tottaway22
If I make a calculation: 40 BBs * $35mil = $1.4Bn and 5 launches 5* 85 mil (avg Glenn/Falcon) = $425mil. Total ~$1.8Bn I hope this to have happened but it seems huge. Imagine that even chips' tariffs have gone a few weeks before (supply cost secured).
2
1
132
This is actually very bullish: ✔️ Launch cost is not a permanent margin drag ✔️ Unit economics improve automatically with scale ✔️ Incremental satellites after break-even are extremely profitable ✔️ Depreciation understates future cash generation
7
The confusion comes from mixing two different perspectives: 1️⃣ Accounting definition (GAAP / balance sheet) vs 2️⃣ Cash deployment / near-term build-out economics The 10-K has how costs are capitalized on the balance sheet, not how cash flows behave in early vs late deployment.
16
Why this distinction is critical 1️⃣ “Average” ≠ “Marginal” In capital-intensive infrastructure, CFOs often quote: Average cost at full scale, not cash cost per unit today Average cost=Total satellitesTotal/constellation capex
38
❌ It is NOT: The near-term cost for the first 45–60 satellites The marginal cost per satellite on early launches The cash cost per satellite if deployment stops at 45–60
1
100
What the CFO actually means (correct interpretation) ✅ The $21–23M figure is: A fully averaged, steady-state, at-scale capital cost per satellite, amortized across a ~90+ satellite constellation, including launch.
11
$21–23M per Block-2 satellite, this figure refers to: Satellite hardware & materials Assembly & integration Testing and quality control Factory overhead allocated per unit Yield improvements at scale (“mature production”) It is not an all-in deployed cost.
6
The $22M does NOT include: 🚀 Launch services (Falcon 9, New Glenn, etc.) Insurance Launch integration fees Ground segment / network capex Spectrum / regulatory costs Launch is always disclosed and modeled separately.
11