
Specialists in BMS Service, Design & Commissioning. Contact us via [email protected] https://nitter.cf/t.co/szoqPUmrBv
London, England
Joined May 2014
- Tweets287
- Following1.4K
- Followers1K
- Likes61
On site today at @30EustonSquare installing Mitsubishi AC Interface, a bespoke adapted Niagara 4 Jace
PPM Carried out on OSS controllers this week by one of our engineers, a first for Developed Controls working with OSS Controllers
2
Earlier this week we replaced a total of 18 poorly maintained and faulty actuators on a residential manifold installation
Our engineers have been busy working on this panel design for a residential block boiler room in Brixton
1
Out with the old, in with the new, @belimoholdingag actuator fitted in place of faulty Honeywell actuator earlier this week in Hammersmith
1
This week we have replaced a faulty Inverter with a new @abb_uk 32A inverter and fully recommissioned the unit
1
We have also been busy down at Vauxhall installing & commissioning 68 No. FCU's controlled by IQECO35's
Niagara 4 control panel fitted with iSMA IO module has been fitted at a residential property in Notting Hill Gate replacing obsolete TAC
2
We have also carried out many full re-commission projects as well as smaller installations recently #BMS
Several of our sites have now been fitted with 4G routers for remote access, cost effective access managed by Developed Controls
We have carried out an upgrade of this obsolete R2 Panel to a Niagara 4 control system, an iPad has been installed to view graphics
Happy Friday all, we have been installing some more Ontrol smart wall adjusters this week, connected back to a Jace 8000
Also one of our recently completed projects at a London apartment involved upgrading existing wall sensors to Ontrol Smart interfaces



























