Replying to @Lib_Development
Orange Line to Fair Oaks and Yellow Line to National Harbor would have the highest return on investment
207
Replying to @wmataGM
Need a Metrorail Extension to the job centers at Fair Oaks/FFX Government Center to increase non-peak direction ridership. Vienna is poor location for an end of the line station.
1
6
161
Replying to @AdamTuss @nbcwashington
$3.50+ per mile....The system is designed to maximize revenue. It is not designed to maximize throughput. The corridor needs to prioritize a Metrorail extension to Fair Oaks. Vienna is a poor location for an end of the line rail station.
2
13
1,091
Metro extension to Fair Oaks is the best transportation investment for this corridor. Vienna is a poor end of the line station location. The traffic can dissapate much more easily from Fair Oaks. Fair Oaks extension should cost less than $500M since the ROW is already in place.
1
1
25
Replying to @NoVaTransit @ffxconnector
What is the ridership for this route? The Wiehle Reston east Station parking is only 1/4 full. Maybe #wmata should lower the parking price. It appears we are paying for duplicative/competing transit services to save 10 min.
68
Replying to @TODNewsHub
It would be more viable with WWB light rail concept to connect to Alexandria and the National Harbor area.
1
4
225
Replying to @PotomacLocal
Need 4th lane on I-95 to extend to/from PWP. Current merge points are not acceptable.
9
Status quo... It appears this is what officials prefer...
BREAKING-DC officials release a long awaited report on congestion pricing, which would tax drivers who take vehicles into parts of the District. @MayorBowser has released a letter saying it is deeply flawed and is the wrong policy at the wrong time @nbcwashington #wmata
Replying to @bluevirginia
In theory, this is the main reason the casino legislation was proposed. @ssurovell
Replying to @arlvabikelanes @SpeakerDonScott
5+ story Single Stair apartments? It is difficult to get financing for large 5 over 1s and keep them affordable. @KennyBoddye
1
10
Replying to @andrewdefrank @arlvabikelanes
Amtrak station platform planned adjacent to the new Crystal City VRE station
2
242



















