Floridian Development (@FloridianDev) header
Floridian Development (@FloridianDev) profile picture

An overview of Floridian development. Covering major metropolitan areas such as Miami, Tampa, West Palm Beach, etc.

Joined July 2022
Photo by Floridian Development (@FloridianDev)Photo by Floridian Development (@FloridianDev)Photo by Floridian Development (@FloridianDev)Photo by Floridian Development (@FloridianDev)Photo by Floridian Development (@FloridianDev)Photo by Floridian Development (@FloridianDev)Photo by Floridian Development (@FloridianDev)Photo by Floridian Development (@FloridianDev)Photo by Floridian Development (@FloridianDev)Photo by Floridian Development (@FloridianDev)
🧵I've started a website! 🌐 As long as I can remember, sharing development updates on X felt limiting. Word/image limits and other quirks held me back. Although X premium could solve some issues, it can't match the freedom of a blog (in bio). Q&A below for transparency! ⬇️
6
2
1
48
32,275
Dining will be above the lobby, featuring 6,391 of space. Read more on the Floridian Development website. 📜Foster+Partners/ODP
1
162
🧵1771 West Avenue: Miami Beach Another Live Local Act project has been submitted in Miami Beach, this one rising 325 feet or 18 floors. The developer is planning 44 units, 18 of which are workforce units and the remaining are condos. There will be 117 parking spots & dining.
3
5
3
61
2,557
🧵115 NE 2nd Street: Fort Lauderdale The tallest tower in Fort Lauderdale has just been proposed, rising 56 floors or 649 FT. The development, proposed by a NY-based developer, would feature 696 units, 696 parking spots, and 7,400 SF of retail. Read more on the FD site 📜FSMY
9
7
1
108
4,381
This is just my opinion, but I think the MARTA stations in Atlanta are way better than Miami Metrorail stations. Each station seems to have more personality and art to them. Miami's stations have aged quite badly. Five Points Station in Downtown ATL has changed a lot too.
3
1
13
1,143
However the experience on Miami's Metrorail is better, at least safety wise which is the most important thing. I've had multiple times where I was harassed on Marta, either verbally or physically, and on Miami-Dade transit it happens but it isn't as frequent.
1
1
290
🧵Fouquet's Miami: Fouquet's Miami, a mixed-use development featuring 143 units, 20 condo-hotel units, and 85 hotel rooms, is inching towards a groundbreaking. The project, in Miami's Design District, will rise 12 and 24 floors respectively, with interior designs by RDAI. 1/2
4
32
1,848
The development team has already filed a master construction permit, site prep permit, phased vertical permit, and multiple demolition permits. "Mobius Construction INC" is the GC Construction is estimated to complete in 2030. Read more on the Floridian Development website.
1
3
316
Architect:David Chipperfield Architects and CUBE 3.
2
129
Very big news from Transit Alliance Miami
🚨Breaking news🚨 The Northeast Corridor is fully funded!
4
9
1
207
13,959
🧵25 & 275 NE 60th St: Miami Magic City Innovation District is planning its next act: two new rental towers. They are the third highrise proposal for the site, which hasn't broken ground yet. Plans call for two towers: 20 & 25 floors, with 553 units and 24,387 SF of retail.
1
2
46
1,888
The towers, which will rise 259 and 313 FT respectively, will include podium and basement parking, totaling 718 spaces. The development will head to the UDRB soon, where approval is likely. Read more on the Floridian Development website. 📜Arch: Arquitectonica
1
233
Website is back up. Thank you for your patience.
4
446
ℹ️Website Status (5:30 PM): Down Reason: DDOS Attack. I am working to bring the website up, articles will resume tomorrow presumably when the website is back up. I won't comment on much, but clearly somebody did this on purpose.
2
6
878
With the map updates you should see significant performance improvements, like serious improvements. I have been behind on also updating points. My plan is to automate some processes but its all a work in progress.
1
6
620
Apologies. This is not a joint venture anymore. Arden is the sole developer.
🧵1836 Biscayne Blvd: Miami A joint venture is revising their approved 2022 proposal for a highrise over First Church of Christ, Scientist. The development now features a new design/scale. There will be 406 units, 480 parking spots, & 14,803 SF of retail. 📜Arquitectonica 1/2
1
1
9
813
🧵1836 Biscayne Blvd: Miami A joint venture is revising their approved 2022 proposal for a highrise over First Church of Christ, Scientist. The development now features a new design/scale. There will be 406 units, 480 parking spots, & 14,803 SF of retail. 📜Arquitectonica 1/2
9
6
4
61
10,100
The tower will rise 43 floors or 464 feet. The tower is going before the UDRB (urban development review board) soon. Read more on the Floridian Development website.
1
605
Mr. C Residences: Boca Raton Plans for Mr. C Residences Boca Raton are advancing to the city's 'Planning and Zoning Board'. The development will include 133 units, 5,977 SF of dining space, and 322 parking spaces in a 12-story/150 FT structure. 🗺️41 SE 4th St 📜Arquitectonica
1
2
42
1,971