
#TeamDPW proudly serves Indy residents by providing snow removal @IndySnowForce, trash collection, infrastructure improvements, resilience @SustainIndy, & more.
- Tweets10.6K
- Following387
- Followers11K
- Likes2.2K

ALT An informational graphic. At the top is white text on a blue-and-red background. It reads: “POGUE’S RUN GREENWAY: Construction Complete.” Below the background is a drone’s-eye view of the Pogue’s Run Greenway. There are two things superimposed on the image: (1) The logo for the Indianapolis Department of Public Works (Indy DPW), and (2) some more white text. This text reads: “The $7.2 million expansion to the Pogue’s Run Greenway is now complete! The greenway runs 5+ miles from Pogue’s Run Art and Nature Park to 10th Street near Arsenal Tech High School on Indy’s neat east side. The greenway, winner of the Merit Award in the 2025 ACEC Excellence Awards, is well known for its unique, glow stone-infused pavement that literally lights up in the dark.”

ALT An informational graphic. There is black text on a tan background. The text reads: “YOUR CHILD’S SAFETY IS OUR PRIORITY: Halloween is one of the most dangerous nights for pedestrians.” Below that is more black text next to a graphic of trick-or-treaters; That text reads: “Stay alert. Slow down. Be safe.” Below that is the logo for the Indianapolis Department of Public Works (Indy DPW). Scattered around the background are Halloween-themed images, such as spiders, bats, and pumpkins.

ALT An informational graphic. There is white text on a blue background. It reads: “DRIVE SAFEL. EVERY LIFE MATTERS. (1) Slow Down. (2) Stay Focused. (3) Yield to People Walking. (4) Watch for People Crossing. (5) Never Drive Impaired. Safe streets require shared responsibility. Every trip is an opportunity to make safer choices.” Below the text is the logo for the Indianapolis Department of Public Works (Indy DPW). Behind the blue background is an image of a red stoplight.

















