Photo by Jero Juujärvi (@InfraJero)Photo by Jero Juujärvi (@InfraJero)Photo by Jero Juujärvi (@InfraJero)Photo by Jero Juujärvi (@InfraJero)Photo by Jero Juujärvi (@InfraJero)Photo by Jero Juujärvi (@InfraJero)Photo by Jero Juujärvi (@InfraJero)Photo by Jero Juujärvi (@InfraJero)Photo by Jero Juujärvi (@InfraJero)Photo by Jero Juujärvi (@InfraJero)
There are lot of talk on BIM + AI. Non-technical people claim AI will do everything and experienced technical people give reasons left and right what are the concerns about AI. In the end it narrows down to two things: Quality and Responsability.
2
14
One important notice though: people who use & benefit from BIM models (Foremen, Site Engineers, Project Managers, Supervisors, Maintenance etc.) will get their life easier as now they can change property data and execute small operations to models with few clicks.
1
5
Progress update on the PDF → clean maps Every run places every PDF in real coordinates with a Helmert transformation. All the drawings are joined into one drawing by category (water management, plan, alignment, vegetaton etc.),
1
46
In the end, I want reliable and deterministic end-result: What you put in, you always get exactly same output. So can’t use AI too widely, only for OCR,XYZ operation, everything else is hardcoded algorithm decision makings.
1
9
More work on trench cut & fill layers. Turns out the real challenge is when different surfaces meet 😅 #BIM #CivilEngineering #MachineControl
1
1
39
In the picture: where a branch meets a deeper trench, the fill used to run straight across and fill the deep one up. Now it stops at the deep trench's wall.
1
8
Now working on: one trench engine for all five networks (water, cables, district heating & cooling, gas and suction waste), so a whole street comes out as one model. Check free automation bimautomate.ai Feedback is most welcome.
2
Did you know you can quickly convert pipe network breaklines into IFC/IM4 pipe network? This is the quick & dirty way to space out existing underground pipes to see possible clashes or what needs to be moved/removed during construction. #BIM #CivilEngineering
2
67
Maybe after I get final boss of trench modeling (initial fill), I will look into how to make make-shift manholes & equipment included (registry data into pipe network) bimautomate.ai (free civil BIM automations)
18