Pinned Tweet
🚨 CONSOLIDATED EDU:
Wanted to give you guys a one stop shop to the best educational content I’ve put out here. Will be updating as I go along. If you missed anything, give it a read below ⬇️
Cerebras $CBRS expects manufacturing capacity to increase more than 10x during 2026, with CS-5 production targeted for early summer 2027.
1
552
Twist Bioscience $TWST is expanding its DNA manufacturing infra to support AI drug discovery demand.
- DNA synthesis writers: 10 operating, expanding toward 16
- FY2027 planned CapEx: ~$75M
- FY2027-2028 investment: ~$150M
- Expansion includes GeneLab automation, protein production & characterization equipment
1
1
643
Micron $MU physical AI.
- Level 4+ autonomous vehicles typically require over 200GB of memory
- Storage capacity can reach multiple terabytes
- Memory & storage requirements exceed today's Level 2+/3 vehicles by more than 10x
2
2
789
Northrop Grumman $NOC $1.6B PAC-3 contract.
They've significantly expanded its US solid rocket motor manufacturing capacity since 2021:
• Utah: 2x capacity
• West Virginia: Nearly 3x capacity
• Elkton, Maryland: +25% capacity
2
3
805
$ONDS strategic acquisitions.
Gate Technologies & Bron Technologies add electronic safe and arm devices & advanced fuzing for precision weapons, missiles & unmanned systems.
- ~$65M expected 2026 revenue
- ~$180M projected 2028 revenue
- 90+ weapon systems integrating GATE components
$ONDS reports an $835M order backlog, with US & Canada accounting for $405M, or ~49%.
By segment:
- Precision Strike: $358M
- Aerial Security: $191M
- ISR & Persistent Intelligence: $166M
- Autonomous Ground Systems: $120M
21
2,214
Cerebras $CBRS Q3 core hardware gross margin of 31%, versus 46.9% for cloud & services.
They expect consolidated core gross margin to reach 47%-49% in Q4 as older, discounted hardware contracts roll off.
Long term target of 60%.
$CBRS disclosed key engineering techniques behind its wafer scale processor yields.
- ~1M compute tiles with spare-tile redundancy
- Defective tiles bypassed through hardware routing
- Independent voltage tuning across 84 wafer sections
- Wafer edges removed to reduce variation
$CBRS disclosed key engineering techniques behind its wafer scale processor yields.
- ~1M compute tiles with spare-tile redundancy
- Defective tiles bypassed through hardware routing
- Independent voltage tuning across 84 wafer sections
- Wafer edges removed to reduce variation
$TWST scaling its DNA manufacturing infra from 10 active DNA writers to 16.
At full deployment, they expect capacity to exceed 50M DNA sequences daily. Twist also introduced ~30 automated systems & workflows during FY26.
1
4
816
$NOC CEO Kathy Warden's remarks at Baird's Aerospace & Defense Conference.
They expects 5%-7% revenue growth in 2027, supported by record backlog & accelerating defense demand.
1
5
899
$ONDS reports an $835M order backlog, with US & Canada accounting for $405M, or ~49%.
By segment:
- Precision Strike: $358M
- Aerial Security: $191M
- ISR & Persistent Intelligence: $166M
- Autonomous Ground Systems: $120M
$CIFR is targeting ~130% growth in Barber Lake lease revenue through a major expansion.
- Base contracted revenue: $3.90B
- Lease expansion: +$5.19B
- Potential total with additional rentalization: ~$9.6B
- Expansion cost: ~$13M per IT MW
- Projected yield on cost: 15.2%
6
899
Rocket Lab $RKLB has increased its Electron & HASTE rocket production rate by 37.5% over the past 12 months.
They now build 1 rocket every 8 days, showing growing manufacturing capacity across its small launch platforms.
$OKLO secured a manufacturing capacity agreement with US Forged Rings to support its Aurora reactor fleet.
- 27 module equivalents reserved for 2030-2035
- Capacity for reactor vessels, lids & support structures
- Additional capacity options & first offer rights
- Planned US manufacturing campus
5
855
$WULF completed the sale of its Abernathy JV interest for ~$530M in aggregate consideration.
- Justified Data: 401 MW leased to Anthropic, with phased delivery through Q2 2028
- Muskie: 1 GW contracted power capacity, with the first 500 MW targeted for Q4 2028
Lucid $LCID reported Q3 2026 revenue of $350.3M, up 4% YoY, despite a 41% contraction in the U.S. BEV market.
Gross margin improved to -73.7% from -99.1% a year earlier.
$LCID secured a $1.75B increase to its delayed draw financing facility with Saudi Arabia's Public Investment Fund.
Q3 liquidity stood at $2B, rising to $3.75B pro forma.
Management expects the additional funding to support operations & key investments into Q4 2027, including the start of Midsize production.
15
1,120
BlackSky $BKSY reported record Q3 revenue of $33M from Space Based Intelligence & AI Services, up 107% YoY & 34% QoQ.
Growth was driven by increased Gen 3 satellite utilization, expanding high margin Gen 2/Gen 3 subscriptions & conversion of pilot programs into seven figure contracts.
3
933
$IREN completed construction & commissioning of its Horizon 1 data center in just 14 months, including deployment of a 19,000 GPU $NVDA GB300 cluster.
The company compares this with an 18 month industry benchmark for data center construction alone, excluding GPUs.
$IREN integrated AI infra across 3 businesses:
- AI Cloud: >$4B contracted ARR target by year-end 2026
- Data Centers: $6B in owned assets with 20+ year useful lives
- Land & Power: >30,000 acres, >5 GW secured power & >35 GW development pipeline
3
927
$WULF is expanding its US AI infrastructure portfolio across 5 data center sites.
- 839 MW contracted critical IT capacity
- 102 MW operating
- 737 MW under construction
- ~2.1 GW future development pipeline
6
948
$IREN integrated AI infra across 3 businesses:
- AI Cloud: >$4B contracted ARR target by year-end 2026
- Data Centers: $6B in owned assets with 20+ year useful lives
- Land & Power: >30,000 acres, >5 GW secured power & >35 GW development pipeline