Michael Mielke (@MichaelLeoM) header
Michael Mielke (@MichaelLeoM) profile picture

From Ottawa; defined by transit, transportation, LRT, cycling, mixed ancestor heritage including aboriginal: Kwakwaka’wakw, Halq’emeylem, German.

Canada
Joined January 2013
Photo by Michael Mielke (@MichaelLeoM)Photo by Michael Mielke (@MichaelLeoM)Photo by Michael Mielke (@MichaelLeoM)Photo by Michael Mielke (@MichaelLeoM)Photo by Michael Mielke (@MichaelLeoM)Photo by Michael Mielke (@MichaelLeoM)Photo by Michael Mielke (@MichaelLeoM)Photo by Michael Mielke (@MichaelLeoM)Photo by Michael Mielke (@MichaelLeoM)Photo by Michael Mielke (@MichaelLeoM)
"Would" ≈ conditional clause, even the report acknowledges so.
We need to be vocal about the humongous benefits having downtown-to-downtown high speed rail between Montreal, Ottawa and Toronto will have. God knows the people fighting it are.
28
Even the report says it's all conditional.
High speed rail: -faster than flying, factoring in airport travel/process time -less time/stress, greener, better for our economy, more convenient & cheaper -frees up tracks for other economic activity -will bring airfares down due to competition -$24.5B annually for our economy
1
17
The OP policy directive was to reuse transportation corridors where ca.. and that's what the city did on all its lines. Activism however tried to make transit go the long way in West Ottawa, where this didn't (C L).. but the choice: a reuse of former abondoned railway corridors.
Replying to @noahcites
I'd be a lot happier with this and LRT construction if governments looked first at existing underused or abandoned railway corridors, the way Ottawa used an old CPR track for its first new trains. That would save a lot of money. APTO translates into "apt to go. way over budget".
36
Replying to @LindsayJS
Nah, some of those are only things ppl say they want. But don't actually as much as they say they do. In many cases, simply because they mimetically believe they're supposed to.
1
12
PS: you still didn't define reliable
9
You'd surprise to know that Council has had Service Standards particularly published since 2005. These were also particularly mentioned in the Auditor General's report.
Re-elected councillor Rawlson King is demanding binding, published service standards for OC Transpo, so riders know what they’re entitled to. Back in May I wrote about the numbers behind that demand: after $7 billion, transit got faster in only 16 of 97 neighbourhoods, and the penalty from Barrhaven is 50 minutes: randomactsofurbanism.substac…
1
60
Curiously, after Moscow moving into GoA3/4 tram operations, Europe seeks doing same for its many trams, also seeking higher capacity versions ≈ Ottawa. Of note, also, it seems even European developments are taking longer to realize to fruition due to added commissioning steps.
1
1
70
This higher capacity move is definitely more flexible with tram setups than metro branches.
1
54
As a side.. Transport Fever 3, also has moved to longer length coupling similarly, applying the same ATO-like spacing mechanisms that more agencies are applying even to street networks, with terminal hold abilities.
39
Alternative headline: NCC exploring how to increase mode satisfaction by seeking input on a redundant 3S Gondola model that has guaranteed no waits (outside peak saturation queues) because of ensured spacing that delivers >99.4% of trips without waits.
1
61
The 3S, allowing upwards of 5500 capacity in tighter headway cables... What I can find, similar rope lengths are 4km to 7 km, some going 9km.. La Paz splits the same 17 km into 5 rope sections. This, would most likely be 3 rope sections, starting here. nitter.cf/SocTransitLover/status…
Replying to @SocTransitLover
Also the thing I'm most concerned about is the capacity between Bayview and UQO. It'll be the only higher-order transit mode between Ottawa and Gatineau so I'm worried that it'll get swamped especially since it likely won't have a super high capacity.
31
If your entire argument is ATO, I can't agree.
2
29
And TBC, that was your entire argument, "grade separates and automate." But GoA3 going GoA4 is already challenging your argument. GoA3 on non geade separation already even disproves your argument.
15
I think you meant wider tunnel bores. Plus there is a difference in vertical depth need. Sheppard is, after all, approx the same length.
If Line 5 had been built with subway technology it would have had larger+longer stations & it's unlikely that the tunnels would have run east of Don Mills. Metrolinx also did look into extending the Scarborough RT west along Eglinton & couldn't find the financial justification.🤷🏻‍♂️
1
160
TBC, courts have disagreed on extra classifications in Eglinton's project. It is not assured that courts will agree with the city calling the extra Smart Bugs req't a maintenance issue. You can claim as a stance, but does it actually hold up in Law.
More "Now That The Election Is Over" news: "'If there is a latent defect, a construction-related defect, that is their cost to bear to fix.' But it turns out that RTG didn't bear the cost of a key part of that plan. Taxpayers did." cbc.ca/news/canada/ottawa/th…
1
1
72
Just know enough to know that while Contract Law is different, a similar dispute among private citizens, would be seen as a gift.
1
34
That's a decision that .. is .. tolerated. Knowing this fact.
1
49
Unlike other headlines, this is just something well versed, knowing it would happen often.
1
27
Revisionist opinions... Ottawa's BRT was specifically envisioned to become LRT once the capacity no longer supports BRT, since the 1974 OP and 1984 BRT start. In fact, because of this, Hurdman to Trim is also a cheap cost per km build alignment, despite Montréal better alignment
It's a mystery why anyone ever thought we needed LRT | Letters to the Editor ottawacitizen.com/opinion/lr…
1
4
181
A meander created because of trying to force everything to traverse downtown.
1
47
This meander balance effort is also seen recently introduced, 24/526, 82/582, 565/566/66
30
Michael Mielke retweeted
Ottawa - every scheduled light rail and bus moving between 07:56 and 08:42 on 20261029, 46 minutes of timetable. 428 vehicles are moving at once at the busiest instant inside this frame, drawn from 873 scheduled runs over 281 distinct paths. Those counts describe what you can see in this view - not the whole feed. Colour is the mode: red light rail and muted purple bus. Positions are interpolated between scheduled stop times. This is the timetable, not GPS and not live traffic. Data: Ottawa-Carleton Regional Transit Commission (OC Transpo) GTFS, published under the operator's own open-data terms. 𝐓𝐡𝐞 𝐍𝐞𝐰 𝐒𝐜𝐢𝐞𝐧𝐜𝐞 𝐨𝐟 𝐌𝐚𝐩𝐬 #transit #datavisualization #maps #gtfs #urbanism
1
12
526