SolidBoosters2 🇮🇳 (@SolidBoosters2) header
SolidBoosters2 🇮🇳 (@SolidBoosters2) profile picture

Founder & Admin of https://nitter.cf/t.co/1XIHA4Mor4. Building the ultimate home for Indian space nerds.

INDIA
Joined September 2025
SolidBoosters2 🇮🇳 retweeted
ISRO's URSC wants industry to build an X-ray shielded room inside a satellite clean room U R Rao Satellite Centre, Bengaluru has issued an Expression of Interest (11 Nov 2026) asking Indian companies to design and build a turnkey X-ray shielding system at AIT-1 Extension, ISITE. The enclosure will be used for radiographic inspection of spacecraft plumb line welds and electrical connectors with portable X-ray machines (Teledyne ICM 160 and PEXRAY PXR 160, both 160 keV). Key specs: 🔹 14 m × 24 m area, 6 m tall walls 🔹 Open top with no roof, so the clean room's laminar airflow isn't disturbed 🔹 Main wall: 12 mm lead. Other walls, maze and doors: 6 mm lead (layout approved by AERB) 🔹 99.9% pure lead, fully sealed so none of it is exposed to the clean room 🔹 No wood allowed. Door interlocks, warning lights, 4 zone monitors and 2 survey meters 💰 Cost: no estimate published. Prices will be quoted at the tender stage. Payment terms: 70% after all material is supplied, the rest after commissioning. An optional 30% advance is available against a Bank Guarantee. ⏱️ The whole system must be commissioned within 24 months of the order, with a 12-month warranty. Key dates: 📅 Pre-EOI meeting: 1 Dec 📅 EOI due: 17 Dec, 1 PM 📅 Opening: 18 Dec Only Indian companies can apply. Firms shortlisted from the EOI will then get the actual tender. #ISRO #URSC #SpaceIndustry #IndianSpace
1
8
34
1,056
SolidBoosters2 🇮🇳 retweeted
BREAKING: The ground static test of the PSLV third stage (PS3) was carried out successfully at the Static Test Facility in Satish Dhawan Space Centre, Sriharikota on November 12, 2026. Subsequent to the anomalies observed in the third stage of PSLV during the PSLV-C61/EOS-09 & PSLV-C62 / EOS-N1 missions, the configuration of the PS3 stage was revisited comprehensively w.r.t the design margins, raw material acceptance criteria, assembly procedures, and the quality checks that were followed so far. The configuration has been strengthened and essential improvements have been carried out in the nozzle configuration to improve design margins along with updated procedures in the acceptance of raw materials, assembly procedures and quality checks. The mechanical interfaces have been strengthened with redundancy in the sealing systems and adequacy of the design margins have been verified. The updates in assembly procedures and Non-Destructive Tests (NDT) during the various phases of integration & transportation have been implemented and the new version of the PS3 Solid motor stage is realized and tested successfully. Based on the detailed analysis & reviews of the test data, further tests are planned. Source: isro.gov.in/Ground_test_of_t…
7
35
6
225
7,820
SolidBoosters2 🇮🇳 retweeted
ISRO's LPSC has issued two Expressions of Interest (EoIs) to build human-rated life support hardware for the Bharatiya Antariksh Station (BAS-01). Systems: > THCS: Thermal & Humidity Control System with Ventilation > CPMS: Cabin Pressure Control & Maintenance System Mode: End-to-end design, development, realisation, qualification, testing and delivery by Indian industry Why it matters: Both systems are part of the ECLSS (Environmental Control & Life Support System), which LPSC calls one of the most critical subsystems in BAS. The BAS module is designed for 2 crew on 15-day stays and is the next step after Gaganyaan towards continuous human presence in orbit. Scope (each system): > 7 sets: 1 prototype, 2 qualification units, 4 flight units > Includes sensors, controller & EDAQ, software, harness and connectors > Software source code to be handed over to LPSC > Delivery to Valiamala or Bengaluru Timeline (from purchase order): > Design and prototype: 12 months > Qualification units: 4 more months > Flight units: delivered in phases over the next 4 months > EoI responses due 6 weeks after issue, by post only Who can bid: > Indian entity under Indian management and control > 5+ years in operation and in aerospace or defence > Average annual turnover of at least ₹50 crore (FY23 to FY25), with no losses > Consortiums allowed, led by an Indian firm > AS9100D and ISO 9001:2015 desirable Technical scoring (100 marks): > Past ISRO or aerospace projects: 20 > Past human-rated THCS or CPMS work: 25 > In-house design team (at least 5 engineers): 25 > Fabrication, assembly and test facilities: 30 > Test facilities (vibration, thermovac, acoustic) must be in-house. Outsourced ones are not counted. Minimum past project value to score: > THCS: ₹10 crore (aerospace) and ₹25 crore (human-rated) > CPMS: ₹5 crore (aerospace) and ₹12.5 crore (human-rated) Terms: > Penalty for delay: 0.5% per week, capped at 5% (10% for long delays) > Security deposit: 3% of project value > Performance guarantee: 3% of project value > Warranty: 12 months #ISRO #LPSC #BAS #BharatiyaAntarikshStation #Gaganyaan #ECLSS
1
12
54
1,355
SolidBoosters2 🇮🇳 retweeted
Replying to @isro
@isro: ISRO successfully conducted the flight acceptance test on November 05, 2026 for the cryogenic engine identified for the next GSLV Mission (GSLV-F19) at the test facility at ISRO Propulsion Complex, Mahendragiri.The ignition of both the Main Engine (ME) and the Gas Generator (GG) occurred as expected. During steady-state operation, the engine performance is normal and consistent with nominal predictions. The test duration was 200 seconds and the performance of the engine was satisfactory and consistent with the pre-test predictions. The engine will be inducted in the Cryogenic stage for the GSLV-F19 mission that will launch the NVS-04 navigation satellite. #ISRO #GSLVF19 #NVS04 #NAVIC
3
16
1
89
2,062
SolidBoosters2 🇮🇳 retweeted
Good morning, folks! Now that we are back from the Diwali break though definitely still carrying a bit of that festive hangover it is time to plug back in. The Indian space ecosystem hasn’t slowed down one bit over the holiday week. 1/ Skyroot Aerospace | Raman-1 Flight 2 Qualification >@SkyrootA wrapped up the test firing for Raman-1, clearing the thruster for Vikram-1’s Flight 2. >Raman-1 handles Vikram-1’s roll control (rotation around the vehicle's long axis) to ensure precise attitude and orientation stability throughout ascent. 2/ Dhruva Space | ₹34.7 Cr DRDO Win 📡 >As reported by @alpha_defense, @dhruvaspace has emerged as the L1 bidder for DEAL, DRDO’s project to develop LEO and terrestrial IoT communication systems. >Reported bid value: ~₹34.7 crore, cementing private industry integration into critical defense-space communications. 3/ Cosmoserve Space | India’s First Debris Removal Hub >Inaugurated in Hyderabad, Base 1 becomes India’s first private space debris removal and in-orbit satellite servicing facility (and the world's 6th). >The hub includes an Orbital Rendezvous and Capture Lab, cleanrooms, and simulation units targeting satellite refuelling, repair, and de-orbiting missions ahead of Gaganyaan and the Bharatiya Antariksh Station. 4/ PierSight | Varuna 2.0 Clears Vibration Tests >PierSight Technologies announced that its Varuna 2.0 Structural Qualification Model cleared vibration testing at ISRO SAC. >The payload merges all-weather Synthetic Aperture Radar (SAR) with Automatic Identification System (AIS) tracking for persistent maritime surveillance and dark vessel tracking. 5/ L&T | Gaganyaan-2 Escape Shroud Handover >L&T Precision Engineering & Systems delivered the 4th Crew Escape Ogive Shroud (CEOS) assembly from its Coimbatore facility directly to ISRO. >Critical structural hardware protecting crew safety and ensuring swift separation during an emergency abort scenario. 6/ IN-SPACe | ₹67.15 Cr Technology Adoption Tranche Four startups secured major non-dilutive backing under the Technology Adoption Fund: >Manastu Space: ₹22.08 Cr (green/iodine Hall-effect thrusters) >InspeCity: ₹21.18 Cr (in-orbit servicing/refuelling) >VyomIC: ₹12.55 Cr (precision space clocks) >MumbaiSemi: ₹11.34 Cr (NavIC/GPS semiconductor design) 7/ Akashalabdhi Space | Inflatable Habitat Near-Space Run >Bengaluru-based Akashalabdhi tested a 250-litre expandable habitat structure via a TIFR high-altitude balloon to ~30 km, gathering pressure and thermal data ahead of a planned orbital demo on Vikram-2. 8/ Inbound Aerospace | Reusable Re-entry Vehicle >Chennai-based startup Inbound Aerospace is reportedly in talks for a $10M seed round to develop its reusable space re-entry vehicle. >They recently completed a 1km drone drop test for their autonomous parachute landing system, targeting an orbital demo by 2028. #IndianSpace #NewSpaceIndia #ISRO #SkyrootAerospace #DhruvaSpace #Spacetech #Startups
3
14
73
2,244
SolidBoosters2 🇮🇳 retweeted
This is the day when every home turns into Sriharikota, and everyone becomes a mission director! 🚀🎇 We wish you a very happy and safe Diwali🪔
3
14
1
105
1,801
SolidBoosters2 🇮🇳 retweeted
Advance Happy Diwali to the 🇮🇳 Space community... here's the 40mins on-stage conversation I had with ISRO Chairman Dr. V. Narayanan in Mumbai... 🚀🚀🚀 Looking forward to more launches and travels to Sriharikota!
17
1
113
2,467
SolidBoosters2 🇮🇳 retweeted
🚨 ISRO at APRSAF-32: Award win, SAFE co-chair role and key bilaterals in Bangkok An @isro delegation led by Dr. Ch. V. N. Rao, Director, Space Applications Centre (SAC), Ahmedabad, took part in the 32nd session of the Asia-Pacific Regional Space Agency Forum (APRSAF-32) in Bangkok, Thailand, from 26 to 30 October 2026. The forum was organised by Thailand’s GISTDA jointly with Japan’s MEXT and @JAXA_en, under the theme “Bridging the Asia-Pacific: Advancing a Trusted and Inclusive Space Future”. 🏆 Award for ISRO Dr. Jayaprakash V. Thomas, Director, Earth Observation Applications & Disaster Management Support Programme Office (EDPO), ISRO HQ, received the Asia Pacific Region Excellence in Space Award-2026 for his contributions to Earth observation applications in disaster management, oceanography and meteorology, and to regional cooperation across the Asia-Pacific. 🛰️ ISRO’s key engagements ▪️ Dr. Rao presented “Indian Space Programme & Policy Updates” at the plenary session ▪️ ISRO officials co-chaired, along with JAXA, the SAFE Executive Board meeting and the SAFE session of the Satellite Applications for Societal Benefit Working Group (SAWG) ▪️ Dr. Bimal Kumar Bhattacharya, Group Director, SAC, presented ISRO’s updates on CH4Rice and NISAR S-band data for SAFE projects ▪️ ISRO presented updates at the Space Education for All (SE4AWG) and Space Frontier (SFWG) working groups ▪️ Dr. John Mathew, Associate Director, EDPO, took part in the panel discussion on “Strengthening Global Disaster Resilience” ▪️ The delegation joined the Space Sustainability Working Group (SSWG) round table and the joint SE4AWG–SFWG session 🤝 Bilateral meetings The delegation met officials from Japan, the Philippines, Thailand, Kazakhstan and the European Space Agency (@esa) to review ongoing cooperation and discuss future opportunities. 📌 Context ISRO is a founding member of APRSAF and has hosted the forum twice in Bengaluru, in 2007 and 2017. #ISRO #APRSAF32 #APRSAF #IndianSpace #SpaceNews #NISAR #EarthObservation #DisasterManagement #JAXA #SpaceCooperation
1
6
39
1,109
SolidBoosters2 🇮🇳 retweeted
The Structural Qualification Model of Varuna 2.0, our first commercial SAR + AIS satellite, has been successfully integrated and has cleared vibration testing at SAC, ISRO. A huge shoutout to our team for the countless days and nights they have put in to reach this milestone! 🚀
14
34
3
162
5,961
SolidBoosters2 🇮🇳 retweeted
EMBARASSING 2nd half!
Pakistan scores another one Its 3 - 2 now with seconds left
5
6
1
97
2,359
SolidBoosters2 🇮🇳 retweeted
Defence Minister Rajnath Singh tweets, "DRDO successfully conducted the flight test of the indigenously developed Pralay Missile off the coast of Odisha today at 1110 hrs. The test was conducted as part of user evaluation trials and successfully met all the stipulated objectives, as validated by data captured through various range instruments" (Video Source: Rajnath Singh/X)
26
357
28
2,336
121,476
SolidBoosters2 🇮🇳 retweeted
🌞Full-disk solar observations on 24 October 2026 using SUIT MgII k 279.6nm. 🌞 Stay tuned to @suitadityal1 💫 for more updates !! suit.iucaa.in @IUCAAScipop @dktripathi @sree_padi @ydnad0 @dipu_iia @isro
1
8
24
874
SolidBoosters2 🇮🇳 retweeted
🚀 Astrobase has updated their website. And it has some of the best images and graphics of any Indian rocket engine ever! Overall the website is smooth and well designed ✨️ Everest looks really sick. The Indian rocket engine scene is on fire! Check out: astrobase.in/
10
90
14
748
31,214
SolidBoosters2 🇮🇳 retweeted
One interesting detail in the spec: it lists the LVM3 core variants as L110 / SC120 / SC200. SC120 is the semicryo stage ISRO is building right now. It carries ~120 t of LOX-kerosene and will replace the L110. SC200 is a bigger version of the same idea, with ~200 t of propellant on the same SE2000 engine. It showed up in an ISRO tender back in 2019 as a future upgrade, but ISRO hasn't talked about it recently. The drawings only have covers for the L110 and SC120 openings, so SC120 is what's actually designed for. But the spec still keeps SC200 on the table. (Not to be confused with SCE-200, which was just the old name of the SE2000 engine.) #ISRO #LVM3 #SC120 #SC200 #Semicryo #SE2000 #Sriharikota
ISRO's SDSC SHAR has issued a tender for a second LVM3 Mobile Launch Pedestal. Tender: SH202600152501 Vehicle: LVM3, with L110 / SC120 / SC200 core variants and two S200 strap-ons Project: Augmentation of Second Launch Pad (ASLP) Every LVM3 is stacked on a Mobile Launch Pedestal (MLP) inside an assembly building and then rolled ~1 km to the Second Launch Pad (SLP). PSLV/GSLV use their own pedestal. LVM3 has had just one, until now. Why two pedestals if there's only one pad? A rocket is at the pad for only a few days, but it sits on its pedestal for weeks while it's being stacked. With one pedestal, the next LVM3 can't start until the last one has launched and the pedestal has been refurbished. With two pedestals and two assembly buildings (VAB + SVAB): > One LVM3 can be stacked while another heads to the pad > If one pedestal is damaged in a launch, the other is a backup > That means more LVM3 launches a year from the same pad Specs: > 19.2 m × 19.2 m deck, 3.6 m deep, with a service walkway inside > Central opening with swappable covers for the L110 and SC120 cores, so it's semi-cryo ready > 2 Strap-on Support Rings, each rated for 500 t > Hydraulics shift each loaded ring ±50 mm, to ±0.1 mm accuracy, to align the S200s > Ring seating surfaces held to 30 arc seconds > Load test with 2 × 250 t dummy loads > Rolls on the existing bogie, plus a new parking spot on the SVAB–SLP track Steel: ~803 t Design: Tata Consulting Engineers, who also designed the existing LVM3 pedestal. The builder will be whoever wins the bid. Timeline: 12 months to supply + 4 months to erect Bids due: 30 Nov 2026 One pad, two pedestals, more LVM3 launches a year. #ISRO #LVM3 #Sriharikota
3
9
1
58
1,804
SolidBoosters2 🇮🇳 retweeted
Here's what the new LVM3 Mobile Launch Pedestal looks like, from the tender's technical specification > The red deck is built in modules. Module 1 is the central strip with openings for both S200 boosters and the core stage, with modules 2A to 2D and 3A, 3B around it > The two yellow rings are the Strap-on Support Rings. Each S200 booster stands on one, and hydraulics can shift them slightly to line the boosters up > The pink blocks at the corners are the anchor legs that lock the pedestal to the ground at the launch pad As per the spec, it will support LVM3 with L110, SC120 and SC200 core stages. The drawings have swappable covers for the L110 and SC120 openings, so it's ready for semicryo LVM3 It's fabricated in pieces and put together at Sriharikota, around 803 t of steel in total Image: SDSC SHAR tender document #ISRO #LVM3 #SC120 #SC200 #Semicryo #Sriharikota
ISRO's SDSC SHAR has issued a tender for a second LVM3 Mobile Launch Pedestal. Tender: SH202600152501 Vehicle: LVM3, with L110 / SC120 / SC200 core variants and two S200 strap-ons Project: Augmentation of Second Launch Pad (ASLP) Every LVM3 is stacked on a Mobile Launch Pedestal (MLP) inside an assembly building and then rolled ~1 km to the Second Launch Pad (SLP). PSLV/GSLV use their own pedestal. LVM3 has had just one, until now. Why two pedestals if there's only one pad? A rocket is at the pad for only a few days, but it sits on its pedestal for weeks while it's being stacked. With one pedestal, the next LVM3 can't start until the last one has launched and the pedestal has been refurbished. With two pedestals and two assembly buildings (VAB + SVAB): > One LVM3 can be stacked while another heads to the pad > If one pedestal is damaged in a launch, the other is a backup > That means more LVM3 launches a year from the same pad Specs: > 19.2 m × 19.2 m deck, 3.6 m deep, with a service walkway inside > Central opening with swappable covers for the L110 and SC120 cores, so it's semi-cryo ready > 2 Strap-on Support Rings, each rated for 500 t > Hydraulics shift each loaded ring ±50 mm, to ±0.1 mm accuracy, to align the S200s > Ring seating surfaces held to 30 arc seconds > Load test with 2 × 250 t dummy loads > Rolls on the existing bogie, plus a new parking spot on the SVAB–SLP track Steel: ~803 t Design: Tata Consulting Engineers, who also designed the existing LVM3 pedestal. The builder will be whoever wins the bid. Timeline: 12 months to supply + 4 months to erect Bids due: 30 Nov 2026 One pad, two pedestals, more LVM3 launches a year. #ISRO #LVM3 #Sriharikota
1
19
94
1,647
SolidBoosters2 🇮🇳 retweeted
ISRO's SDSC SHAR has issued a tender for a second LVM3 Mobile Launch Pedestal. Tender: SH202600152501 Vehicle: LVM3, with L110 / SC120 / SC200 core variants and two S200 strap-ons Project: Augmentation of Second Launch Pad (ASLP) Every LVM3 is stacked on a Mobile Launch Pedestal (MLP) inside an assembly building and then rolled ~1 km to the Second Launch Pad (SLP). PSLV/GSLV use their own pedestal. LVM3 has had just one, until now. Why two pedestals if there's only one pad? A rocket is at the pad for only a few days, but it sits on its pedestal for weeks while it's being stacked. With one pedestal, the next LVM3 can't start until the last one has launched and the pedestal has been refurbished. With two pedestals and two assembly buildings (VAB + SVAB): > One LVM3 can be stacked while another heads to the pad > If one pedestal is damaged in a launch, the other is a backup > That means more LVM3 launches a year from the same pad Specs: > 19.2 m × 19.2 m deck, 3.6 m deep, with a service walkway inside > Central opening with swappable covers for the L110 and SC120 cores, so it's semi-cryo ready > 2 Strap-on Support Rings, each rated for 500 t > Hydraulics shift each loaded ring ±50 mm, to ±0.1 mm accuracy, to align the S200s > Ring seating surfaces held to 30 arc seconds > Load test with 2 × 250 t dummy loads > Rolls on the existing bogie, plus a new parking spot on the SVAB–SLP track Steel: ~803 t Design: Tata Consulting Engineers, who also designed the existing LVM3 pedestal. The builder will be whoever wins the bid. Timeline: 12 months to supply + 4 months to erect Bids due: 30 Nov 2026 One pad, two pedestals, more LVM3 launches a year. #ISRO #LVM3 #Sriharikota
6
43
5
270
13,353
SolidBoosters2 🇮🇳 retweeted
ISRO's LPSC has issued a tender to build a Surface Treatment Facility for Semicryo at LPSC, Tumakuru (Karnataka). Notice: LPSC(B)/CMD/01/1005/EPC/MJ/002/2026-27 (02 Nov 2026) Work: Planning, design and construction (Civil, PH, Electrical and allied works) Mode: EPC Mode-1, so the contractor plans, designs and builds Why it matters: LPSC is developing the SE2000 semicryo (LOX-kerosene) engine and the SC120 stage, which will replace the L110 core stage of LVM3. This facility adds to the ground infrastructure for that programme. Value: > Amount put to tender: ₹351.13 lakh (~₹3.51 crore) > Civil & PH: ₹283.38 lakh > Electrical: ₹67.75 lakh > EMD: ₹7,02,260 > Performance guarantee: 5% of tendered value Timeline: > Completion: 12 months > Download: 04 Nov to 23 Nov 2026 > Bid clarifications: till 25 Nov 2026, 17:00 > Bids due: 27 Nov 2026, 11:00 > Techno-commercial bid opening: 27 Nov 2026, 11:30 Who can bid: > Similar work = RCC office/industrial building, minimum G+1, with civil and electrical works, completed in the last 7 years > 3 works of ₹140.45 lakh each, or 2 of ₹210.68 lakh, or 1 of ₹280.90 lakh > Average annual turnover of at least ₹105.34 lakh (last 3 years to 31 Mar 2026) > Solvency of at least ₹140.45 lakh > Design by a DOS-empanelled consultant or a qualified in-house/consultant team; designs proof-checked by IIT/NIT > Electrical agency needs a valid electrical contractor's licence #ISRO #LPSC #Semicryo #LVM3 #Tumakuru #Karnataka
6
39
1,012
SolidBoosters2 🇮🇳 retweeted
NVS-03 is now in Geosynchronous Orbit! @isro completed 4 orbit raising manoeuvres with a cumulative LAM burn of 6,164 s. Orbit: 35,765 × 36,196 km Inclination: 29.98° Health: Normal ✅ #NVS03 #NavIC #ISRO #GSLVF18 #IndianSpaceflight
1
30
199
2,281
SolidBoosters2 🇮🇳 retweeted
Since March 2026, NavIC has had only 3 working navigation satellites, one short of the 4 needed for a position fix. Once NVS-03 is operational, NavIC's base layer is back to 4, bringing back standalone 3D positioning over India. Since the launch, interest in NavIC has shot up. People want to know how it works, why it dropped to 3 satellites, and what its status is right now. We built a free NavIC hub on our platfor to answer exactly that 👇 📖 Overview: why India built NavIC, every launch, the failures and the fixes, Gen-1 vs Gen-2 🎓 Learn: interactive lessons on trilateration, pseudorange (d = c × t), L5 + S band and the ionosphere, skyplots and DOP, multipath, and clocks ⏱️ RAFS: the story of India's own rubidium atomic clock from SAC-ISRO, with stability charts and live broadcast clock data 🛰️ Constellation: every IRNSS/NVS satellite, whether operational, unhealthy, silent or retired 📊 Status dashboard, updated hourly from NASA CDDIS data: • Live health per satellite (health flag, URA, clock drift) • Daily clock drift from IGS data • Availability: are 4+ satellites up for a fix? • India coverage map • Orbits and ground tracks • NavIC vs GPS, Galileo, BeiDou, GLONASS, QZSS • Gen-1 vs Gen-2 clock trends • Events: clock jumps, health changes, new satellites When NVS-03 starts broadcasting, it should show up in our Events feed as a new satellite, automatically. Note: this is built on open broadcast navigation data from IGS and NASA CDDIS. It's not ISRO telemetry and not an official ISRO status page. Start here 👉 indianspaceflight.in/navic Live status 👉 indianspaceflight.in/navic/c… #NavIC #ISRO #NVS03 #GNSS #IndianSpace
1
12
1
47
6,565