Croma @cromaretail has missed key details in my invoice and not helping at all. All there customer care service is automated and waste of time. The requests are closed without any information. Also service request page shows blank.
33
Hi @CasioIndia ,
Your customer service including email and telephone are out of sorts.
Hope the watches work.
1
18
All this self praise, but can't fix the delays.
@WesternRly @drmbct day 1 and scope for improvement....revise again.
#WesternRailway
🚆 BIG BOOST FOR MUMBAI SUBURBAN COMMUTERS FROM 1st SEPTEMBER!
Western Railway’s new Suburban Timetable No. 79 is all about smarter deployment of the existing 1,414 services — improving connectivity where passengers need it most, while tackling congestion and operational bottlenecks.
🔹 SAME 1,414 TRAINS — BUT A MUCH SMARTER TIMETABLE!
The total number of suburban services remains unchanged at 1,414. Instead of simply adding trains, Western Railway has rationalised the timetable based on passenger demand, operating conditions and congestion points.
Six new services are being introduced, while six existing low-demand/mainly non-peak services are being withdrawn, allowing train paths and resources to be redeployed more effectively.
🔹 BORIVALI CONGESTION TO BE TACKLED — WITHOUT CUTTING OFF BORIVALI!
One of the most important changes is aimed at tackling the peak-hour congestion at Borivali, which can lead to heavy door crowding, prolonged boarding/alighting and detention of trains.
Two evening Churchgate–Virar services — the 18:22 AC service and 19:05 service — will skip their Borivali halt on a trial basis.
But importantly, passenger convenience is being ensured. For passengers travelling to Borivali on the 18:22 AC service, another AC local departs Churchgate just after 6 min at 18:28 hrs which halts at Borivali.
So the idea is simple: decongest the choke point while continuing to provide passengers with options.
🔹 DAHISAR CONTINUES TO GET PRIORITY — HALTS RETAINED!
A particularly significant aspect is that while selected peak-hour services will skip Borivali to ease congestion, their Dahisar halts are being retained.
This is an important indication of the growing operational importance of Dahisar as a passenger hub on the Western suburban corridor.
With Borivali already functioning as a major suburban hub, retaining the Dahisar halt provides passengers with another important access point and helps distribute passenger loads across the corridor rather than concentrating everything at Borivali.
In other words: decongest Borivali, while strengthening the importance of Dahisar.
🔹 2 MORE AC LOCALS — WITHOUT INCREASING THE TOTAL NUMBER OF TRAINS!
A major passenger benefit: weekday AC services increase from 145 to 147.
Two existing non-AC services are being converted into AC services:
➡️ Churchgate–Borivali: 17:28 hrs
➡️ Borivali–Churchgate: 18:24 hrs
Both retain their existing routes and timings.
This means more AC capacity without increasing the overall 1,414-service count.
🔹 DAHANU ROAD PASSENGERS GET A BOOST!
For passengers from the extended suburban belt, there is a major improvement.
The existing Dadar–Virar and Virar–Dahanu Road services are being integrated to provide direct Dadar–Dahanu Road connectivity.
The revised service will depart Dadar at 17:22 hrs and reach Dahanu Road at 19:30 hrs.
🔹 VIRAR–CHURCHGATE MORNING CONNECTIVITY GETS A BIG BOOST!
After converting the 07:59 Virar- Churchgate service into AC service, the non AC passengers wanted a service due to the gap of non ac services towards Churchgate. The 08:23 hrs Virar–Dadar service is being extended all the way to Churchgate. It will reach Churchgate at 09:48 hrs, giving morning commuters from the extended suburban corridor direct connectivity towards Churchgate.
🔹 LATE-NIGHT COMMUTERS GET MORE OPTIONS! 🌙
The new timetable adds services during late evening and night hours, particularly in the Borivali–Bhayandar–Virar corridor.
New services include:
➡️ Bhayandar–Virar: 07:46 hrs
➡️ Borivali–Bhayandar: 22:14 hrs
➡️ Borivali–Virar: 22:51 hrs
➡️ Virar–Borivali: 23:51 hrs
➡️ Borivali–Bhayandar: 00:28 hrs
These services address passenger requirements beyond the main peak periods and strengthen late-night connectivity.
🔹 LOW-DEMAND OFF-PEAK SERVICES RATIONALISED — CAPACITY PUT TO BETTER USE
The six withdrawn services are largely services operating during non-peak periods and on shorter-distance routes, including Churchgate–Mumbai Central and selected Churchgate–Borivali services.
The objective is not to reduce overall suburban services, but to replace less-useful train paths with services and operating patterns that address current passenger and operational requirements.
🔹 PUNCTUALITY: ATTACKING THE PROBLEM AT THE CHOKE POINT
One of the most important principles behind the new timetable is that punctuality is not only about running more trains — it is also about preventing avoidable detention at critical locations.
Borivali's heavy peak-hour passenger movement can affect train movement and create a cascading impact on trains behind.
The selective skipping of Borivali by identified services is therefore an operational intervention to reduce congestion and train detention, while alternate services continue to serve Borivali.
🔹 CHURCHGATE–BORIVALI AC SERVICE ALSO RECONFIGURED
The 10:24 hrs Churchgate–Borivali AC slow service will now operate up to Goregaon.
Its return service will also originate from Goregaon.
This is another example of how the new timetable is being configured around actual operational requirements and congestion management.
🚆 THE BIGGER PICTURE: “MORE EFFECTIVE TRAINS, NOT JUST MORE TRAINS”
Timetable No. 79 represents a move towards scientific optimisation of Mumbai’s suburban railway network.
✅ 1,414 total suburban services maintained
✅ 6 new services introduced
✅ 6 low-demand services rationalised
✅ Weekday AC services increased from 145 to 147
✅ Direct Dadar–Dahanu Road connectivity
✅ Virar–Churchgate morning service extended
✅ More late-night connectivity
✅ Peak-hour congestion at Borivali being specifically addressed
✅ Dahisar halts retained, supporting its growing role as an important passenger hub
The philosophy is clear: identify where the railway is getting congested, identify where passengers need better connectivity, and scientifically reconfigure the timetable to address both.
This is not simply a timetable change — it is an effort to make Mumbai’s suburban network work smarter. 🚆
@WesternRly
@Central_Railway
@drmmumbaicr
@mybmc
@collectorpal
@BhayandarMira
@vvcmc_official
@CouncilPalghar
@SwatchPalghar
53
Looks like @MSEDCL is hard bent to replace meters with smart meters.
Without checking the status is set to Faulty meter and a random amount is charged each month.
My neighbour too received a bill of 21K.
Another friend 8K.
@WeAreVasai @Suhas_News @HeySunilGupta @vasaivirarinfra
Here we go again.
You people are taking your jobs for granted. Shame on you @WesternRly @drmbct @RailMadad @RailMinIndia
@cmomaharashtra
Virar Vasai trains are delayed beyond limit.
Western railway has messed something badly. The service has gone downhill, post 6 lines upgrade at Borivali.
Trains from Vasai Virar are showing 50 mins delay and cancelled at Andheri.
@drmbct @WesternRly @RailwaySeva @RailMinIndia
1
127
The downfall of Amazon @amazonIN must be studied....the service has gone downhill. Can't even approve a new account within 72 hours window.
1
79
Western railway has messed something badly. The service has gone downhill, post 6 lines upgrade at Borivali.
Trains from Vasai Virar are showing 50 mins delay and cancelled at Andheri.
@drmbct @WesternRly @RailwaySeva @RailMinIndia
Classless @WesternRly at it again. Trains delayed for 20-25 mins, no announcement nothing.
@RailwaySeva
1
73
Using the tragedy of people to share misinformation...shame
@MTPHereToHelp
I remember @snehadubepandit doing rounds in fire brigade vehicle during heavy rains last monsoon. What exactly did she learn? No plan in a year?
@WeAreVasai @vasaivirarinfra
Replying to @MSEDCL
@MSEDCL @snehadubepandit @vvcmc_official @CMOMaharashtra
PLEASE PUT EFFORTS TO FIX ISSUES WITH ELECTRICITY IN VASAI VIRAR AND MAKE ALL WIRES UNDEGROUND ASAP. @snehadubepandit People voted you with hope, we expect more better work, roads, electricity
55
Their standard response...pass it to one another. No accountability at the end.
48
To call these numbers, we need a stable network. @TRAI should investigate how this fraud @JioCare @reliancejio are given licences to operate without any backup @vasaivirarinfra @WeAreVasai .
Entire region has lost connectivity and these guys are asking for pincode? Buying more time, when I have already sent a DM? 2 days and no network at Vasai Virar.
Replying to @StingTwits
Hi Huston, we are here to help. Kindly DM us your area PIN code to take this further - Shshank nitter.cf/messages/compose?recip…
1
201
Jio network is totally waste in Vasai Virar ...no electricity, no internet and fluctuating unstable mobile network. @reliancejio @jiocare shame ...this is every time during critical situations
Hi @MBVVPOLICE , common man is struggling to reach a job, station, doctors etc in these heavy rains. while resorts are allowed to play music at full volume? Lots of scrutiny for passport inquiry, but this goes unnoticed? @vasaivirarinfra @WeAreVasai
Replying to @MumbaiPolice
Meanwhile resorts are still operating with full volume at Navapur , Virar.
Can hear liya music even in rains, a few KMs away.
81
Hi @MTPHereToHelp : Your responses on X are prompt, but ground reality is different. Attaching pic of the auto
Taking 4 passengers in morning
Driving at opposite side to bypass Ghatkopar signal
Charging more (30₹) than regular fare.
This driver also hurls abuses many times.
Replying to @StingTwits
Thanks for bringing this to our notice Vikhroli Traffic Division has been informed to do the needful.
Share autos charge 30 each (90₹ for 3) from Godrej LBS to Ghatkopar which is barely 3KM. Actual meter fare comes to around 40₹.
The driving is very rash, carrying 4 pax especially in the morning. They jump the signals often. Pls check @MTPHereToHelp
Hi @drmbct @WesternRly @RailwaySeva @RailMinIndia Any updates on this? Aren't the details sufficient for you to investigate the big time gap for Virar locals?
Hi
3:43 Churchgate Bhayandar local (4PM at Dadar) was earlier a Virar local.
It was recently changed to Bhayandar local.
After 3:26 pm ccg- Virar local , the next one is at 3:56 PM. Half our gap.
Also 3;26 is AC local ..so more gap for regular ones.
1
14
So now trains get converted due to a rake shortage? What kind of solution is this @drmbct @RailwaySeva @WesternRly @RailMinIndia ??
What should passengers do for half hour?
Why does western railway always takes dumb decisions? Converted CCG -Virar train to Bhayandar (4PM from Dadar).There are no Virar trains for half an hour from Dadar ??
@drmbct
@WesternRly
@RailwaySeva
@zoru75

















