Pinned Tweet
The glass isn't half-full nor half-empty. It's twice as big as it needs to be.
5
11
2,533
Every NVIDIA employee will be dumping stock and taking recruiter calls over next few days as they jump a sinking ship. Without Jensen, the company is rudderless.
Steven Bower retweeted
The military taught me that those who save your life in the trenches are usually fellow soldiers with their own flaws, not the polished figures who sit before decorated walls and appear flawless only because the darkness has never tested them.
Standing before the tombs of the fallen, we remembered that their flaws never stopped them from being brave for others.
This is why founders should always have Super Voting shares. One scandal away from moronic board members kicking you out and replacing you with a finance bro in a robotic suit.
If you can't get Super Voting shares, do not go public. Ever. Period. Full stop.
BREAKING: Jensen Huang to be fired as Nvidia CEO after he had affairs with Chinese spy and Nvidia executive
Over $250,000,000,000.00 wiped from Nvidia perpetual futures
25
Once you see most traditional and social media discourse is equivalent to high school locker room gossip, you can’t unsee it.
It’s just another form of reality TV.
seems like by far the worst part of your husband having an affair is the part where the internet rushes to look at pictures of you next to the woman he cheated with and debate whether you are hideous enough that he should get a pass.
165
Terrestrial vs Orbital datacenters
The napkin math for 500MW DC.
Orbital
Estimate 500MW at 100kw per sat (starlink ai sat v1 design target) = 5,000 sats
Based on size, expect ~20 sats to fit per starship launch (conservative estimate). Thats 250 Starship launches for 500MW datacenter. At scale with full re-usability SpaceX is targeting < $10 million nominal cost per launch. (Core assumption)
500MW Orbital DC = $10M per launch * 250 launches = $2.5B launch cost
Terrestrial
Estimate $5 - 7B for just facility cost, 24 - 36 months TTFT (Time to first token). $400M/year operational cost for 500MW data-center from scratch today, including land, permits, utilities, power, water, etc (note: completely ignoring hardware costs). And in what time frame? Localities are now dragging out environmental reviews for 18+ months just to break ground + 1 year to build the ground infra before you even put hardware in it.
Factor: once sats are in orbit, theres 0 energy cost (solar power is free), and minimal operational cost. So even if the orbital-class GPU hardware is 30% more expensive due to rad hardening and orbital design constraints, the lack of operational cost still gives huge benefit for orbital.
There's 2 questions to answer:
1) *will it work in principle?*
> Yes imo, already proven by existing sat designs and thermal limits
2) *is it financially viable?*
> All hinges on starship costs (hardware cost washes out I think). As costs for terrestrial power and land increases, orbital variants become more attractive.
1
79
I'm not one to post links here, but making an exception.
This video will both impress and terrify you at the same time.
youtube.com/watch?v=UytYrhYL…
1
125
I’m not surprised by AIs rapid discovery of software vulnerabilities. I’m surprised it took this long.
There’s less low-hanging fruit than I anticipated.
Certainly more to come, but will require cleverness and sophistication going forward.
30
Sir Patrick Stewart was such a giant in my life, growing up watching Star Trek TNG during my formative years. Picard was my moral philosopher and mentor. His passing has impacted me profoundly. He will be missed.
45
Steven Bower retweeted
Replying to @SirPatStew
The most impactful line that he delivered on screen imo. So applicable to all facets of life.
Steven Bower retweeted
The degree to which we piss away our human capital is shocking to me. It's bad enough that we haven't solved aging but society is increasingly dependent on transfer payments via taxation from a hyper productive outer crust. Now, more than ever, we need to be identifying our future captains of industry and training them. Instead, we run schooling into our mid 20s as daycare with no real stakes or consequences.
Compute is destiny.
Everyone is sleeping on TPUs. Latest Gemini has caught up close to frontier. They can rent compute at spot price to almost anyone.
Google will do well.
Some other “labs” probably won’t.
If you don’t own your substrate, you don’t control the future.
Google is down bad for no apparent reason
So today I have been loading up on $GOOG stock (well $GOOGL but they're mostly the same) for in my eyes very cheap
I just Facetime'd with my dad and we talked about ChatGPT and he answered "yes I cancelled my ChatGPT because it's on Google now"
I asked what the jackfriks he meant
He said "so Google Search has AI now and I trust it more because it links back to sources etc"
My survival thesis is we have to be co-owner of BigTech and BigAI while they become to sole owners of exponential intelligence which will replace a lot of our businesses and which they will then sell back to us
I'm doing what I'm saying
33















