Seeing "SI" popping up everywhere now, because the terminology is required for government contracting.
This is absolutely retarded.
7
I don't know what the record is, but install on an old Surface Book 2 took 55 seconds.
@dhh
8
I threw out Aethon's river system and started over.
The old approach treated rivers and lakes as separate objects: draw a line, lay a water mesh along it, join it to a lake mesh, hide the seam. It didn't work. Rivers skirted the lakes they were meant to feed, joins showed, and cutting an outlet in a lake did nothing because the lake was just a flat plane at a height someone had typed in.
The new system is closer to a simulation, and seems to have unlocked fully procedural, agent-built rivers.
Here is how that works in practice:
- Springs are the only source of water. A spring is an object you place anywhere, with a flow slider. Turn it up and the lake below grows; turn it to zero and the water is gone.
- The land decides where water goes. Water fills hollows until it spills, and runs downhill from there. Evaporation and ground absorption, set by the biome, compete with the spring, so a lake settles at a size instead of always filling to the brim.
- Rivers are shaped in the ground, not drawn as water. We trace where water would actually run, smooth that into a course, and cut one continuous channel whose floor never rises.
- The water is solved, not placed. A shallow-water solver settles the whole thing, so level and speed come from the simulation. Lakes and rivers come out of the same field, so there is no join to hide.
- Hand finishing is part of the plan. Sculpt a bank and the water re-solves around it.
None of the pieces are new. City builders have had place-a-source water simulation for years, open-world games have traced and carved rivers offline, and the maths comes from flood modelling. What's Aethon's is the combination: springs as the only input, one solved field for everything, baked instead of running live.
Where it stands: I've tested the idea in a small sandbox first, then built one short river end to end in the engine, from a spring at the foot of a fell down to the sea. It took a long evening of fixing things we only saw once it was in the world. Waterfalls and steep banks are still in progress. And it is not yet proven on a large river: the first major one is being built now, and that is the real test.
46
Why do companies with what are clearly iterable products name their product tiers with extreme adjectives that will certainly be superseded?
20
I don't remember who had asked me about my implementation of this effect, but it might have been @_Stocko_ or @MetalHorse233
1
53














