Gauteng's metros are still negotiating coalitions. Whoever governs, the first 100 days should go to one thing. Pick yours: 🚰 Fix water leaks ⚑ Maintain substations πŸ›£οΈ Roads and potholes 🧾 Fix billing Tell me why below.
9
A lesson from 28 years in construction: Before you price a municipal tender, find out how that municipality pays. Ask subbies who've worked there. A great rate means nothing if your certificates sit unpaid for months. Cash flow kills more contractors than bad pricing.
10
Congratulations to Miss SA Tiyani Makamu, flying the Bronkhorstspruit flag. πŸ‘‘ Her hometown still can't drink its tap water. The best gift Tshwane can give her community before December: a fixed plant, safe water, and a published date to get there.
16
Bronkhorstspruit's plant shut again yesterday: raw water too muddy to treat after the storms. Turbidity spikes after heavy rain are predictable. A plant serving whole towns needs raw-water storage and settling capacity to ride them out, not a shutdown with no restart date.
17
Level 2 water restrictions start in Tshwane today. Rand Water says the city's September use was about 34% above its permanent allocation and it must cut about 200 megalitres a day. Restrictions buy time. They don't fix leaks, treatment capacity or empty reservoirs. Do both.
1
3
1,600
5/ If you could fix one thing in your city's water system first, what would it be?
1
44
3/ Money for maintenance. The framework says grants must fund repairs and renewal, not only new projects. That one line could matter more than any ribbon-cutting.
12
2/ Storage. Reservoirs kept full enough to ride out a pump trip, a burst main or a heatwave. When levels sit near empty, the system has no margin.
9
1/ "Access to a tap is not the same thing as access to water." Deputy Minister Jack Bloom, on the new DWS water services framework. He's right. From an engineer's seat, here's what reliable supply actually takes 🧡
8
Danny R (MSAICE, MBA)πŸ‡ΏπŸ‡¦ retweeted
We are deeply sorry for the disruption this incident has caused our customers and partners. We know the trust they place in our services and take that responsibility extremely seriously. We are seeing broad recovery and stability across our services. This was a technical issue not related to cyber or AI / agents. The incident was introduced by an issue during an earlier network capacity upgrade that surfaced following a recent network change. We have addressed the underlying issue and continue to restore service to remaining customers and regions. Given the scale of demand, we restored services gradually, validating stability at each stage. While this took longer, it helped ensure a stable restoration. We will provide a full post-incident report once our review is complete.
7,478
11,930
3,465
70,151
20,745,738
Danny R (MSAICE, MBA)πŸ‡ΏπŸ‡¦ retweeted
We’re seeing encouraging recovery progress, with service availability and email delivery performance improving across a growing portion of affected infrastructure. We know our customers rely on our services to get important work done every day, and regret the impact these outages had on those who depend on us. We will continue to share more information as we have it, and for now we can confirm that there is no indication this is the result of malicious or cyber activity. Our teams are reviewing what happened and how we can prevent similar issues going forward.
1,054
435
6,021
747,773
Joburg Water shut parts of its network yesterday to stop reservoirs draining. The number that matters: Rand Water's storage was 31.1% on 30 Oct vs a 60% target, Eikenhof at 7% (DWS data via IOL). With no buffer, every pump trip or hot day becomes an outage.
1
195
Mayfair substation: two days of outages, a secondary explosion, and now an upgrade promised "within three years". Three years is a long time to run critical plant on borrowed luck. Publish the interim plan: protection checks, cable inspections, backup feeds for hospitals.
48
4/ Watch your guarantee capacity. Every new award eats into your facility. Talk to your bank or insurer before tender closes, not after award.
6
3/ Check escalation. Contracts starting in 2027 will run into 2028. Know how the CPA formula treats your key inputs: bitumen, steel, cement, fuel.
13
2/ Bid what you can staff. Winning three jobs you can't resource is worse than losing them. Name the site agent and foreman before you price.
13
1/ Raubex's order book is up 24% to R39bn, across energy, water, rail and roads. Infrastructure tendering is picking up. I've watched upturns make contractors and break them. 4 things to check before you scale up 🧡
7
The Minister says SA hasn't built a nuclear plant in about 50 years. Now Eskom has a 5,200MW programme on the table. Engineers and builders: what's the biggest risk? βš›οΈ Skills πŸ’° Cost overruns πŸ“‹ Procurement ⏱️ Schedule Reply with yours.
1
1
20
SANRAL has awarded R1.43bn in Gauteng resurfacing on the R21, N3 and N17. 30% of each contract's value is set aside for targeted labour and local enterprises. Small contractors: get your CIDB grading and compliance docs in order now. The R21 job starts January 2027.
34
Minister Ramokgopa says Medupi and Kusile are "a template on how not to do things" for the new 5,200MW nuclear build. Agreed. From a contractor's seat, megaprojects slip at the interfaces: late design freeze, too many packages, a thin owner's team. Fix the client side first.
14