eosesetu98 (@eosesetu98) profile picture
Joined February 2024
Photo by eosesetu98 (@eosesetu98)Photo by eosesetu98 (@eosesetu98)Photo by eosesetu98 (@eosesetu98)Photo by eosesetu98 (@eosesetu98)Photo by eosesetu98 (@eosesetu98)Photo by eosesetu98 (@eosesetu98)Photo by eosesetu98 (@eosesetu98)Photo by eosesetu98 (@eosesetu98)Photo by eosesetu98 (@eosesetu98)Photo by eosesetu98 (@eosesetu98)
For Redbird, FPUSA will include $eose BESS and connects to Cedar Creek 345kV Substation would include Inverters and transformers to step-up to 345kV, power breaker enclosures, EMS controllers, flow monitors and lot more. This is a eg. of turnkey solution for BTM and energy arb.
23
1,353
$EOSE How did u guys modeled this cash flow into your price target? FPUSA generates stable repeatable revenue streams (recurring revenue) and Eose’ share (38%).
4
1
20
2,419
$EOSE Once FPUSA completes a project with financing and servicing model, Analysts will use that "local supply chain" model to forecast future cash flow and set a PT It would be interesting to see what PT would that be. It will be a nice "Premium" as it would be a recurring rev.
1
32
1,792
$EOSE My guess is we are at a stage that investors are in "wait & see" mode to make a decision. Following things need to happen: Line 2 needs to be ramped Line 1 need to be relocated FPUSA needs to finish a project with local supply chain
1
27
2,763
$EOSE Here is what I am thinking, With 75% RTE (1-4hr SDES), you need to oversize the BESS by 33% inorder to meet energy arbitrage's guarentee dispatch during peak hrs Redbird and Wildfire are 4hr BESS. This tells me that they found a way to beat Li BESS in 4hr SDES
6
3
39
4,469
$EOSE Once they stabilize CPK, product performance improves and RTE peaks, COGS comes down. Then comes Field data, validating CPK. It takes SPC to identify UCL and LCL which needs to be set in the initial start up stage. Manufacturing and Engineering are "hand in hand"
6
414
$EOSE While TP for Line 1 @TC is under rated capacity (2GWh), COGS can be reduced by product performance improvements. I think, they have achieved targeted metrics in product quality, KPIs, RTE
8
414
$EOSE With Modular level Dawn OS, they chose not to oversize BESS. This decreases COGS and improves gross margins. This could be a reason why they chose not to ramp Line 1 at TC to 100% while working on improving system performance using Dawn OS
1
16
738
$EOSE As we get in 6hr and above(8hr, 12hr), RTE is >84%. Eose becomes competitive with no oversizing. My guess is, they improved system losses from no string, to string and now module level realtime to monitor SOC using DAWN OS.
12
627
Well, $520 mil(equip+install+op) ready to install projects. So, if you apply same finance structure, FPUSA owns 92.5% of rev/cash flow for $100mil/yr for 20yrs =$2billion $1.85 bil to FPUSA and $EOSE gets 49% = $906.5 mil Net $906.5mil - $520 mil=$386.5 mil
1
3
28
2,239
$EOSE So, FUSA purchased 480MWh worth of projects from Bimergen and gets 92.5% ownership of future project revenue/profits/cashflow. Based on 20mil/year over 20 years, i.e $370mil Project cost is 125mil I think, this is a win for EOS shareholders
4
7
65
3,579
$EOSE If FPUSA converts every $1 into $2.50 invested in project developement/financing/management (just like Bimergen deal), no wonder why Cerberus Capital Management (60billion assests) is involved directly
14
609
$EOSE Think about following questions, if batteries are bad: 1. Why would Ariel Green insure non-cancelable contracts for $1.5bil ? 2. Why would Cerebrus invest $100 mil for project undertaking ? 3. Why retail invest $150mil in a new company ? 4. Why 2nd line for Indensity?
11
5
1
86
8,982
7. Why Cerebrus leverage 1 to 5 times investments from Banks/Institutions and risk their reputation/ 8. Why Cerebrus extended lock-up till end of '26? (Clue: We do not need Cerebrus hold our hands any more)
1
8
708
5. Why Turbine-X energy co-develops along with Indensity ? 6. Why develop Indensity when you have Cube?
13
739
$EOSE 1 hr charge and discharge RTE is at 84% Did I hear that right? AI business is for sure coming and gonna win on LCOS hands down.
2
4
34
2,124
$Eose Oversize systems - No more Dispatch Technicians - No need Downtime servicing - Unnecessary Energy loss less than 1% - New bench mark (I think) Hardware, firmware, and software upgrades - This is why we need like Dominion & Faraday & 11 other Pilot Projects
In our earlier battery management system (BMS) architecture, a single imbalanced module could take an entire string offline—stranding energy across every module it was grouped with. We engineered around it. Oversized systems to deliver performance. Dispatched technicians when it happened. Accepted the downtime. It was the cost of doing business. We decided it didn’t have to work that way. Eos DawnOS™ is the result. A module-level BMS, built from the ground up for zinc-halide chemistry. When a module falls out of balance, the system can route around the issue. The string keeps running. Energy loss stays under 1%. And because zinc is inherently resilient, most modules can recover on their own and reintegrate automatically. No technician. No downtime. That’s how installed capacity becomes usable capacity—and what five years of iterative development looks like. For Eos Cubes with Z3™ modules already in the field, DawnOS can unlock trapped energy. Hardware, firmware, and software upgrades working together to bring deployed systems to full performance. Full technical breakdown linked here: eose.com/how-eos-redefined-c…
1
8
71
3,806
$Eose Just my two cents. Market at times is "Irrational Exuberance" and at times "Irrational Pessimism" John Mahaz is on the job for four months. His main Tasks: 1. Dev. manu. line that can be stood up in 90 days 2. Build "Indensity" on par against "ANY" incumbent tech now.
7
33
3,443
$Eose I will be here till 2030. I have developed special affection for this company. 😉
15
623
$eose 4.Implement common tooling btw Line1 and Line2 requires new design/process 5. At the same time, attend AI DC meetings to gather line2 requirement at MT
6
567