Defcon 2 retweeted
$MARA just mined its 2nd Stratum V2 block and explained exactly why it's going all in
Bigger hashrate, more control over its own block templates, and more decentralization for Bitcoin
One of the biggest miners is leading the way 🫡
Defcon 2 retweeted
Speculation Time:
Is Anthropic $MARA's mystery AI customer, and the "thing" still sitting "on the customer side" is their IPO?
Fred on the Q3 call: the delay has nothing to do with MARA, it's "some things on the customer side" that need to be dotted and crossed.
Then Fred at Cantor two days later: "if I were to give more details, as regards one lease, it would become very evident who the tenant is." He said there's nothing permit-wise or power-wise holding it up, they just "have to wait for a certain reason."
What's a recognizable tenant waiting on right now that makes a lease impossible to talk about? A quiet period before the biggest IPO of the year fits perfectly.
◆ Anthropic already leases 1,101 MW from RIOT and 401 MW from WULF, with a path to more MW with HUT
◆ Their S-1 shows $895 Billion of compute and infrastructure commitments
◆ Their latest S-1 says they compete with crypto miners for power, and that some planned sites run on on-site natural gas generation
◆ Amazon and Google will own roughly 28% of Anthropic combined after the IPO, the two hyperscalers everyone's been guessing for MARA
◆ MARA closes the Long Ridge gas plant Nov 27
◆ MARA is still targeting two leases by year-end
Anthropic is raising the IPO price on strong demand. Soon it's a newly public company with a mountain of capital and a power problem to solve.
IPO prices Wednesday. $ANT trades Thursday. Long Ridge closes a week later.
Does the Kearney AI contract drop before Long Ridge is finalized?
And is Kearney the first deal announced once Anthropic is a public company?
Or will it be the odds on favorites $GOOGL / $AMZN?
Stay tuned to find out
NFA / DYOR
Who is $MARA's mystery customer?
Start with what they told us already
Fred Thiel: "I need to think about the 15-year credit worthiness of somebody during the life cycle of that lease... they have to still be in business in 15 years. So we're being very picky about who we sign up"
Fred again: "it's about financeability of the tenant… The advantage we have with the Starwood partnership is they credit wrap these deals for us"
Barry Sternlicht, Starwood, on the MARA JV: "We do have unbelievable tenant interest in the properties… we've only done deals with the hyperscalers"
They said this back in the summer, months before credit became the main thing the market wants to talk about
And it's in writing. The MARA / Starwood agreement targets "investment grade hyperscalers" or tenants backed by "investment grade sources for the length of the applicable lease term"
The Q3 10-Q on Long Ridge: "formal indications of interest from prospective investment-grade hyperscale tenants"
This isn't a startup chasing cheap power. It's a balance sheet built to carry a 15 to 20 year lease.
Then Fred at Cantor: "if I were to give more details... it would become very evident who the tenant is"
That's a name everyone knows.
And the holdup? "From one person's desk to another person's desk." No power issue. No permit issue. Just paperwork moving at a giant company.
So I ran the odds. These are my speculative estimates of WHO they sign, once a lease lands:
◆ Google 22%
◆ Amazon/AWS 21.5%
◆ Meta 16%
◆ Microsoft 14%
◆ Anthropic 8.5%
◆ Oracle/OpenAI 5.5%
◆ Neoclouds 3%
◆ xAI 1%
◆ Sovereign 1%
◆ Other 7.5%
GOOGLE (22% odds)
◆ Investment-grade balance sheet that can carry a 15 to 20 year lease on its own, exactly what Fred and Barry say they want
◆ Nebraska's own data center report lists Google sites in Lincoln, Papillion/Springfield and Omaha
◆ Google and Tenaska proposed a 1-3 GW gas-fired data center in Nebraska
◆ Fred named Google as a Starwood customer
◆ Already backstops AI tenants' leases at miners (Fluidstack)
AMAZON/AWS (21.5% odds)
◆ The only hyperscaler with a documented Starwood project: Amazon Data Services at Starwood's Herndon, VA park
◆ The firm that ran that park for Starwood is the owner's rep at Kearney
◆ A ~$23.8 Billion Ohio plan
◆ Signed a 300 MW lease with Cipher in 2025
◆ Top-tier credit, the kind that fits a 15 to 20 year lease
META (16% odds)
◆ The biggest data center owner in Nebraska (Sarpy campus)
◆ Building gas-powered AI in Ohio with the ~1 GW Prometheus campus
◆ Signed a 175 MW miner lease with CleanSpark this year
MICROSOFT (14% odds)
◆ Fred named Microsoft as a Starwood customer
◆ A heavy third-party leaser (IREN, Nscale)
◆ Walked away from a UK site in October over a power delay. Powered sites are what it wants, and that's MARA's advantage
ANTHROPIC (8.5% odds)
◆ The most active miner tenant of 2026 (TeraWulf, Riot)
◆ Has a 20-year lease at TeraWulf's Hawesville, KY site, a former aluminum smelter on the Ohio River. Long Ridge's data center goes on a former smelter site on the Ohio River too
◆ Still in play, but not investment grade yet. Its IPO filing says it relies on partners that guarantee its lease obligations, the same partners whose chips go in the building. Fred put it simply: "their silicon provider has to backstop them." That points to Google, which has already done exactly that at other miners, or Nvidia
THE LONG SHOTS (8.5% odds)
◆ Oracle/OpenAI (5.5%): investment grade, but both Fred and Barry flagged credit concerns
◆ Neoclouds (3%): Barry said Starwood has done no data center work with neoscalers or CoreWeave
THE BIG TWO
Put Google and Amazon together and that's 43.5% of the odds. At Kearney it's 51%. Both check nearly every box: investment-grade credit for a 15 to 20 year lease, history with Starwood, and a footprint in these regions.
Now look at what's ready for them.
KEARNEY, NE (Project Horizon)
◆ Permit approved 5-0 by City Council on Sep 8
◆ 100 MW Phase 1 on existing power, scaling to 368 MW
◆ Construction planned for Nov-Dec 2026
◆ Phase 1 targeted to be operating by about March 2028
LONG RIDGE, OH (Hannibal)
◆ FERC approved the acquisition on Nov 4, with closing expected "in the coming weeks"
◆ ~500 MW gas plant already running
◆ "Line of sight to up to 600 Gross MW of AI and Critical IT Loads"
◆ 200 MW of grid power plus 200 MW behind the meter, building toward "around a gigawatt"
◆ In service targeted for mid-2028
Two powered sites. One credit filter. And that filter points straight at the biggest balance sheets on earth.
The odds say it's a name you already know. The pieces say it's closer than the market thinks.
Who's your pick?
NFA / DYOR
$GOOGL $AMZN $META $MSFT $ANT $NVDA
Defcon 2 retweeted
$MARA CEO Fred Thiel posted this message on Linkedin
Yesterday $MARA CEO Fred Thiel sat on a panel at Cantor Convergence called "Conversion is Inevitable: The Path to AI Infrastructure"
I went through every minute of it. Here are Fred's key quotes, and what I think he's telling us
◆ THE LEASES
Cantor asked straight up about the "two by year end" from the earnings call. Fred:
"The only reason we're sitting waiting for the tenant to sign the lease is, in a couple of cases, there's some internal delays"
"Sometimes it needs to go from one person's desk to another person's desk and that person has to sign it"
"Nothing permit-wise or power-wise"
"No technical issues"
Then the line that matters most:
"If I were to give more details, as regards one lease, it would become very evident who the tenant is"
Read that again. If the details alone would give the tenant away, this is a name you would recognize. Small startups don't have a paper trail that long between desks. Big organizations do
◆ THE PHONE IS RINGING
"Since the election we have gotten a lot more phone calls"
Anything with power and a clear path to permitting is "very interesting regardless of size"
MARA has power in hand. The buyers have to come to the people who have it
◆ WHY STARWOOD
Hyperscalers are "spending 90% fixing problems with first time developers"
"That's one of the reasons we did the Starwood deal. They've done deals with Google, Microsoft, Amazon. They've built 7 to 8 gigawatts of capacity for them. They operate it"
Nobody picks a partner with that track record to chase small tenants. You pick that partner because you're building for the biggest names in the room
◆ THE URGENCY
"There was a bit of an oh shit moment. People need capacity to come online next year"
Capacity next year means power this year. Power is exactly what MARA has
◆ KEARNEY, NEBRASKA: THE MATH
Fred called these numbers illustrative:
- 100 MW site, contributed at about $1 Million a MW
- Starwood matched with $100 Million
- $15 Million per MW build cost, $1.5 Billion total
- $300 Million of equity total. Each side has put in $100 Million and adds $50 Million more
"Talk about capital light"
A $1.5 Billion AI campus for roughly $150 Million of MARA cash. That's the setup the Street keeps missing
◆ THE RIOT COMPARISON
Asked about Riot's concrete-pad deal, Fred went right at the math:
"33% yield on a $6 million build cost is essentially the same as 15%, 17% yield on cost on a $12 million build cost, or what a hyperscaler is going to pay you on a $20 million per megawatt build cost"
"Step away from yield on cost and look at what the real NOI is"
Then he asked out loud whether Riot, with 900 MW at Corsicana, could have gotten a better deal from a hyperscaler
Translation: MARA isn't racing to sign the first lease offered. They're holding out for the deal that pays the most on what's actually earned
◆ EXAION
Built inside EDF to run the data centers at its nuclear sites. When EDF wouldn't put in more capital, MARA stepped in and recapitalized it
The first announced client is "a very sophisticated model builder" going from signing to online in "a few months," running prior-generation GPUs
"Good profitability, very attractive pricing... great relationships with both NVIDIA and other providers"
◆ THE CLOSE
"Demand is outstripping the capacity. Capacity can't come online fast enough"
Fred cited agentic token usage up eightfold since August
Then he said more companies are moving to open-weight models on their own private cloud, and that "the bare metal business has to convert to private cloud business"
Stop there for a second
Private cloud with its own orchestration layer is exactly what Fred said Exaion does. He may have just described where the whole industry is heading, and MARA already owns a piece of it
◆ PUTTING IT TOGETHER
Power in hand
A partner that builds for Google, Microsoft and Amazon
A tenant so recognizable he can't say more
A private cloud operator ready for where AI is going next
A balance sheet that's already cleaned up
Demand is outstripping capacity, and @MARA is sitting on the capacity
The first signature is the spark
NFA / DYOR
Defcon 2 retweeted
I think Exaion is one of the most important pieces of the $MARA AI thesis:
-Exaion just signed a $79 MILLION GPU-as-a-service contract with its first U.S. customer on 100% take-or-pay terms
-Its pipeline has already grown to more than $3 BILLION in potential contract value, with roughly $1 BILLION targeted for delivery by the end of 2027
-Exaion gives MARA direct exposure to private cloud, inference, GPU-as-a-service, and sovereign AI, where governments and enterprises increasingly want compute infrastructure they can control
-The real opportunity is margin expansion. MARA can monetize the same underlying power through infrastructure first, then capture additional economics from the GPUs and cloud services running on top of it
This is how $MARA moves up the value chain.
Not just selling access to megawatts, but turning those megawatts into higher-value AI revenue.
And I still think sovereign AI is one of the most overlooked parts of the entire AI infrastructure buildout.
After quarter-end, we used bitcoin sale proceeds to fully repay $750 million of bitcoin-backed debt, releasing all 17,477 bitcoin pledged as collateral.
Since the beginning of 2026, we have reduced total debt by $1.4 billion, or 37%.
Q3 letter: buff.ly/99aUBUg
Defcon 2 retweeted
Who is $MARA's mystery customer?
Start with what they told us already
Fred Thiel: "I need to think about the 15-year credit worthiness of somebody during the life cycle of that lease... they have to still be in business in 15 years. So we're being very picky about who we sign up"
Fred again: "it's about financeability of the tenant… The advantage we have with the Starwood partnership is they credit wrap these deals for us"
Barry Sternlicht, Starwood, on the MARA JV: "We do have unbelievable tenant interest in the properties… we've only done deals with the hyperscalers"
They said this back in the summer, months before credit became the main thing the market wants to talk about
And it's in writing. The MARA / Starwood agreement targets "investment grade hyperscalers" or tenants backed by "investment grade sources for the length of the applicable lease term"
The Q3 10-Q on Long Ridge: "formal indications of interest from prospective investment-grade hyperscale tenants"
This isn't a startup chasing cheap power. It's a balance sheet built to carry a 15 to 20 year lease.
Then Fred at Cantor: "if I were to give more details... it would become very evident who the tenant is"
That's a name everyone knows.
And the holdup? "From one person's desk to another person's desk." No power issue. No permit issue. Just paperwork moving at a giant company.
So I ran the odds. These are my speculative estimates of WHO they sign, once a lease lands:
◆ Google 22%
◆ Amazon/AWS 21.5%
◆ Meta 16%
◆ Microsoft 14%
◆ Anthropic 8.5%
◆ Oracle/OpenAI 5.5%
◆ Neoclouds 3%
◆ xAI 1%
◆ Sovereign 1%
◆ Other 7.5%
GOOGLE (22% odds)
◆ Investment-grade balance sheet that can carry a 15 to 20 year lease on its own, exactly what Fred and Barry say they want
◆ Nebraska's own data center report lists Google sites in Lincoln, Papillion/Springfield and Omaha
◆ Google and Tenaska proposed a 1-3 GW gas-fired data center in Nebraska
◆ Fred named Google as a Starwood customer
◆ Already backstops AI tenants' leases at miners (Fluidstack)
AMAZON/AWS (21.5% odds)
◆ The only hyperscaler with a documented Starwood project: Amazon Data Services at Starwood's Herndon, VA park
◆ The firm that ran that park for Starwood is the owner's rep at Kearney
◆ A ~$23.8 Billion Ohio plan
◆ Signed a 300 MW lease with Cipher in 2025
◆ Top-tier credit, the kind that fits a 15 to 20 year lease
META (16% odds)
◆ The biggest data center owner in Nebraska (Sarpy campus)
◆ Building gas-powered AI in Ohio with the ~1 GW Prometheus campus
◆ Signed a 175 MW miner lease with CleanSpark this year
MICROSOFT (14% odds)
◆ Fred named Microsoft as a Starwood customer
◆ A heavy third-party leaser (IREN, Nscale)
◆ Walked away from a UK site in October over a power delay. Powered sites are what it wants, and that's MARA's advantage
ANTHROPIC (8.5% odds)
◆ The most active miner tenant of 2026 (TeraWulf, Riot)
◆ Has a 20-year lease at TeraWulf's Hawesville, KY site, a former aluminum smelter on the Ohio River. Long Ridge's data center goes on a former smelter site on the Ohio River too
◆ Still in play, but not investment grade yet. Its IPO filing says it relies on partners that guarantee its lease obligations, the same partners whose chips go in the building. Fred put it simply: "their silicon provider has to backstop them." That points to Google, which has already done exactly that at other miners, or Nvidia
THE LONG SHOTS (8.5% odds)
◆ Oracle/OpenAI (5.5%): investment grade, but both Fred and Barry flagged credit concerns
◆ Neoclouds (3%): Barry said Starwood has done no data center work with neoscalers or CoreWeave
THE BIG TWO
Put Google and Amazon together and that's 43.5% of the odds. At Kearney it's 51%. Both check nearly every box: investment-grade credit for a 15 to 20 year lease, history with Starwood, and a footprint in these regions.
Now look at what's ready for them.
KEARNEY, NE (Project Horizon)
◆ Permit approved 5-0 by City Council on Sep 8
◆ 100 MW Phase 1 on existing power, scaling to 368 MW
◆ Construction planned for Nov-Dec 2026
◆ Phase 1 targeted to be operating by about March 2028
LONG RIDGE, OH (Hannibal)
◆ FERC approved the acquisition on Nov 4, with closing expected "in the coming weeks"
◆ ~500 MW gas plant already running
◆ "Line of sight to up to 600 Gross MW of AI and Critical IT Loads"
◆ 200 MW of grid power plus 200 MW behind the meter, building toward "around a gigawatt"
◆ In service targeted for mid-2028
Two powered sites. One credit filter. And that filter points straight at the biggest balance sheets on earth.
The odds say it's a name you already know. The pieces say it's closer than the market thinks.
Who's your pick?
NFA / DYOR
$GOOGL $AMZN $META $MSFT $ANT $NVDA
Yesterday $MARA CEO Fred Thiel sat on a panel at Cantor Convergence called "Conversion is Inevitable: The Path to AI Infrastructure"
I went through every minute of it. Here are Fred's key quotes, and what I think he's telling us
◆ THE LEASES
Cantor asked straight up about the "two by year end" from the earnings call. Fred:
"The only reason we're sitting waiting for the tenant to sign the lease is, in a couple of cases, there's some internal delays"
"Sometimes it needs to go from one person's desk to another person's desk and that person has to sign it"
"Nothing permit-wise or power-wise"
"No technical issues"
Then the line that matters most:
"If I were to give more details, as regards one lease, it would become very evident who the tenant is"
Read that again. If the details alone would give the tenant away, this is a name you would recognize. Small startups don't have a paper trail that long between desks. Big organizations do
◆ THE PHONE IS RINGING
"Since the election we have gotten a lot more phone calls"
Anything with power and a clear path to permitting is "very interesting regardless of size"
MARA has power in hand. The buyers have to come to the people who have it
◆ WHY STARWOOD
Hyperscalers are "spending 90% fixing problems with first time developers"
"That's one of the reasons we did the Starwood deal. They've done deals with Google, Microsoft, Amazon. They've built 7 to 8 gigawatts of capacity for them. They operate it"
Nobody picks a partner with that track record to chase small tenants. You pick that partner because you're building for the biggest names in the room
◆ THE URGENCY
"There was a bit of an oh shit moment. People need capacity to come online next year"
Capacity next year means power this year. Power is exactly what MARA has
◆ KEARNEY, NEBRASKA: THE MATH
Fred called these numbers illustrative:
- 100 MW site, contributed at about $1 Million a MW
- Starwood matched with $100 Million
- $15 Million per MW build cost, $1.5 Billion total
- $300 Million of equity total. Each side has put in $100 Million and adds $50 Million more
"Talk about capital light"
A $1.5 Billion AI campus for roughly $150 Million of MARA cash. That's the setup the Street keeps missing
◆ THE RIOT COMPARISON
Asked about Riot's concrete-pad deal, Fred went right at the math:
"33% yield on a $6 million build cost is essentially the same as 15%, 17% yield on cost on a $12 million build cost, or what a hyperscaler is going to pay you on a $20 million per megawatt build cost"
"Step away from yield on cost and look at what the real NOI is"
Then he asked out loud whether Riot, with 900 MW at Corsicana, could have gotten a better deal from a hyperscaler
Translation: MARA isn't racing to sign the first lease offered. They're holding out for the deal that pays the most on what's actually earned
◆ EXAION
Built inside EDF to run the data centers at its nuclear sites. When EDF wouldn't put in more capital, MARA stepped in and recapitalized it
The first announced client is "a very sophisticated model builder" going from signing to online in "a few months," running prior-generation GPUs
"Good profitability, very attractive pricing... great relationships with both NVIDIA and other providers"
◆ THE CLOSE
"Demand is outstripping the capacity. Capacity can't come online fast enough"
Fred cited agentic token usage up eightfold since August
Then he said more companies are moving to open-weight models on their own private cloud, and that "the bare metal business has to convert to private cloud business"
Stop there for a second
Private cloud with its own orchestration layer is exactly what Fred said Exaion does. He may have just described where the whole industry is heading, and MARA already owns a piece of it
◆ PUTTING IT TOGETHER
Power in hand
A partner that builds for Google, Microsoft and Amazon
A tenant so recognizable he can't say more
A private cloud operator ready for where AI is going next
A balance sheet that's already cleaned up
Demand is outstripping capacity, and @MARA is sitting on the capacity
The first signature is the spark
NFA / DYOR
Defcon 2 retweeted
Yesterday $MARA CEO Fred Thiel sat on a panel at Cantor Convergence called "Conversion is Inevitable: The Path to AI Infrastructure"
I went through every minute of it. Here are Fred's key quotes, and what I think he's telling us
◆ THE LEASES
Cantor asked straight up about the "two by year end" from the earnings call. Fred:
"The only reason we're sitting waiting for the tenant to sign the lease is, in a couple of cases, there's some internal delays"
"Sometimes it needs to go from one person's desk to another person's desk and that person has to sign it"
"Nothing permit-wise or power-wise"
"No technical issues"
Then the line that matters most:
"If I were to give more details, as regards one lease, it would become very evident who the tenant is"
Read that again. If the details alone would give the tenant away, this is a name you would recognize. Small startups don't have a paper trail that long between desks. Big organizations do
◆ THE PHONE IS RINGING
"Since the election we have gotten a lot more phone calls"
Anything with power and a clear path to permitting is "very interesting regardless of size"
MARA has power in hand. The buyers have to come to the people who have it
◆ WHY STARWOOD
Hyperscalers are "spending 90% fixing problems with first time developers"
"That's one of the reasons we did the Starwood deal. They've done deals with Google, Microsoft, Amazon. They've built 7 to 8 gigawatts of capacity for them. They operate it"
Nobody picks a partner with that track record to chase small tenants. You pick that partner because you're building for the biggest names in the room
◆ THE URGENCY
"There was a bit of an oh shit moment. People need capacity to come online next year"
Capacity next year means power this year. Power is exactly what MARA has
◆ KEARNEY, NEBRASKA: THE MATH
Fred called these numbers illustrative:
- 100 MW site, contributed at about $1 Million a MW
- Starwood matched with $100 Million
- $15 Million per MW build cost, $1.5 Billion total
- $300 Million of equity total. Each side has put in $100 Million and adds $50 Million more
"Talk about capital light"
A $1.5 Billion AI campus for roughly $150 Million of MARA cash. That's the setup the Street keeps missing
◆ THE RIOT COMPARISON
Asked about Riot's concrete-pad deal, Fred went right at the math:
"33% yield on a $6 million build cost is essentially the same as 15%, 17% yield on cost on a $12 million build cost, or what a hyperscaler is going to pay you on a $20 million per megawatt build cost"
"Step away from yield on cost and look at what the real NOI is"
Then he asked out loud whether Riot, with 900 MW at Corsicana, could have gotten a better deal from a hyperscaler
Translation: MARA isn't racing to sign the first lease offered. They're holding out for the deal that pays the most on what's actually earned
◆ EXAION
Built inside EDF to run the data centers at its nuclear sites. When EDF wouldn't put in more capital, MARA stepped in and recapitalized it
The first announced client is "a very sophisticated model builder" going from signing to online in "a few months," running prior-generation GPUs
"Good profitability, very attractive pricing... great relationships with both NVIDIA and other providers"
◆ THE CLOSE
"Demand is outstripping the capacity. Capacity can't come online fast enough"
Fred cited agentic token usage up eightfold since August
Then he said more companies are moving to open-weight models on their own private cloud, and that "the bare metal business has to convert to private cloud business"
Stop there for a second
Private cloud with its own orchestration layer is exactly what Fred said Exaion does. He may have just described where the whole industry is heading, and MARA already owns a piece of it
◆ PUTTING IT TOGETHER
Power in hand
A partner that builds for Google, Microsoft and Amazon
A tenant so recognizable he can't say more
A private cloud operator ready for where AI is going next
A balance sheet that's already cleaned up
Demand is outstripping capacity, and @MARA is sitting on the capacity
The first signature is the spark
NFA / DYOR
$MARA on LinkedIn:
"The market for AI infrastructure is applying a higher standard. This week at Cantor Convergence in Miami, Chairman and CEO Fred Thiel joins the panel 'Conversion is Inevitable: The Path to AI Infrastructure' to discuss what it takes to meet it."
Read that panel title again. Conversion is INEVITABLE.
Not "exploring." Not "optionality."
That higher standard is exactly what the market has been asking for, and MARA has been checking the boxes:
• Balance sheet cleaned up, every BTC-backed loan repaid
• FERC approval for Long Ridge
• City Council approval for Kearney
• Starwood Digital Ventures on the build
The one box left is a signed lease. That's what I'll be listening for from Fred in Miami.
NFA / DYOR
Defcon 2 retweeted
Q3 marked an important shift for MARA. The bar for AI infrastructure is higher now, and that goes directly to our strengths. Bitcoin gives us optionality: we can keep each megawatt in mining or redirect it to AI or HPC when those uses offer the greatest risk-adjusted return.
Our Q3 2026 Shareholder Letter is here.
Bitcoin built the foundation. Power created the opportunity. Our strategy now is simple: maximize the value of every megawatt we control.
Highlights:
• Tenants: Since the end of last quarter, we have made great progress and our discussions with tenants are in advanced stages. Our engineering and operations teams have hosted prospective tenants across nearly all of our sites and we feel particularly proud of the development team's progress at Kearney, where pre-development is well advanced.
• Long Ridge: We received FERC approval for our acquisition in Ohio and expect to close in the coming weeks, subject to customary conditions. The natural gas plant is currently authorized to sell 485 MW (expected to increase to 505 MW in 1H 2027), with roughly 70% of its output under long-term contracts, and the site has over 1,600 contiguous acres with access to power, water, fiber, and rail.
• Matagorda: We secured the rights to develop a site in Matagorda County, Texas, with up to 2 GW of power capacity, subject to ERCOT and interconnection approvals. Any payments to the sellers are contingent on power being approved. To date, we have made none.
• Exaion: Our majority-owned subsidiary signed a GPU-as-a-service contract with its first US customer, with total contract value of $79 million over four years, on 100% take-or-pay terms.
• Debt reduction: After quarter-end, we repaid $750M of BTC-backed debt with proceeds from Bitcoin sales. The repayment released all BTC that had been pledged as collateral. Together with the $1.4 billion, or 37% of total debt reduced since the beginning of the year, this repayment reduces our exposure to bitcoin price volatility.
• Share repurchase: After quarter-end, our Board of Directors authorized a share repurchase program of up to $500M of our common stock.
Read the full letter: ir.mara.com/news-events/pres…
Our Q3 2026 Shareholder Letter is here.
Bitcoin built the foundation. Power created the opportunity. Our strategy now is simple: maximize the value of every megawatt we control.
Highlights:
• Tenants: Since the end of last quarter, we have made great progress and our discussions with tenants are in advanced stages. Our engineering and operations teams have hosted prospective tenants across nearly all of our sites and we feel particularly proud of the development team's progress at Kearney, where pre-development is well advanced.
• Long Ridge: We received FERC approval for our acquisition in Ohio and expect to close in the coming weeks, subject to customary conditions. The natural gas plant is currently authorized to sell 485 MW (expected to increase to 505 MW in 1H 2027), with roughly 70% of its output under long-term contracts, and the site has over 1,600 contiguous acres with access to power, water, fiber, and rail.
• Matagorda: We secured the rights to develop a site in Matagorda County, Texas, with up to 2 GW of power capacity, subject to ERCOT and interconnection approvals. Any payments to the sellers are contingent on power being approved. To date, we have made none.
• Exaion: Our majority-owned subsidiary signed a GPU-as-a-service contract with its first US customer, with total contract value of $79 million over four years, on 100% take-or-pay terms.
• Debt reduction: After quarter-end, we repaid $750M of BTC-backed debt with proceeds from Bitcoin sales. The repayment released all BTC that had been pledged as collateral. Together with the $1.4 billion, or 37% of total debt reduced since the beginning of the year, this repayment reduces our exposure to bitcoin price volatility.
• Share repurchase: After quarter-end, our Board of Directors authorized a share repurchase program of up to $500M of our common stock.
Read the full letter: ir.mara.com/news-events/pres…
Defcon 2 retweeted
$MARA reports Q3 tomorrow
The Street is looking for a GAAP Net Loss
I'm looking for $500 - $600 Million in GAAP Net PROFIT
Here's my math 👇
◆ ~2,220 BTC in mining payouts tracked to MARA wallets in Q3, worth ~$159M at receipt-time prices. That should be the bulk of revenue
◆ The ~35.6K BTC stack x a ~$25K rise in BTC during Q3 = ~$890M fair-value gain (if holdings held flat)
◆ Take out depreciation and AI transition costs and you land around $500 - $600 Million
Then there's the stuff nobody's pricing in...
4 moves since Q2:
1: Kearney, NE (Sept 8)
◆ City approved a 368 MW AI campus on the old 100 MW mine site. Local reporting names MARA + SDV as owners. The tenant is under NDA
◆ My call: tomorrow that tenant shows up as a signed contract and MARA's first long-term AI deal
2: VERTEBRAI (Oct 27)
◆ MARA's managed flexible load: MARA hardware on someone else's site that steps aside when the grid needs the power back. ~10 years of grid balancing, now offered as a product
◆ My guess: a big utility, nation state or hyperscaler partner takes it to non-MARA sites
3: Exaion (Nov 3)
◆ Binding order for 83 NVIDIA B300 servers, €60M+. MARA's €115M went in as new shares, so it's growth capital, not a payout to sellers
◆ Nobody orders 83 B300s without customers lined up
4: Long Ridge (Nov 4)
◆ FERC cleared it. 505 MW plant + 1,600 acres, closing in the coming weeks
◆ On the Q2 call Fred said they were "very actively engaged with prospective tenants" and "moving along at about the same pace as if the deal was already closed." The tenant work didn't stop while they waited on FERC
Q2 numbers for reference: 2,422 BTC mined, 35,577 BTC held, $38,690 purchased energy cost per BTC, 70.3 EH/s, 1.9 GW energized with a path to 4.8 GW
Which one is the headline tomorrow?
NFA / DYOR
Join us for our Q3 2026 earnings call on Monday, November 9, at 5:00 p.m. ET.
Webcast details: buff.ly/8rwIDKO
Defcon 2 retweeted
Just In!
Breaking News!!
FERC approved $MARA's acquisition of Long Ridge!!!
Note: during Q2 earnings, Fred Thiel said "we are very actively engaged with prospective tenants... things are moving along at about the same pace as if the deal was already closed"
Defcon 2 retweeted
Goldman Sachs predicts U.S. data center power demand will more than DOUBLE by 2027.
Here Are 5 Stocks That Will Benefit:
1. $MARA MARA Holdings
MARA started as a Bitcoin miner and is turning itself into an AI and energy infrastructure company.
It's buying a 505 MW gas power plant in Ohio for $1.5 billion, with over 1 GW of potential capacity on the site.
Most of the AI trade is fighting over chips. MARA is buying the one input nobody can print more of, power.
Defcon 2 retweeted
Just In!
Breaking News!
$MARA backed Exaion is acquiring $NVDA HGX B300 AI servers from 2CRSi to accelerate the development of Sovereign AI Inference
As per the PR: Exaion currently operates four data centers in France and Canada and is targeting 300 MW of capacity
Link: investors.2crsi.com/en/blog/…
Defcon 2 retweeted
Just In!
Breaking News!
"Wolverine Asset Management" has historically been the top institutional short seller of $MARA shares, but today revealed via 13F's that they reduced their Put position by 69.31% in Q3 2026 while also adding a Call position
Link: fintel.io/so/us/mara/wolveri…
$MARA D.I.R.T. - Know Your Enemy
Here are the institutions as of 6/30/26 that were Net Short on MARA heading into Q3
Its possible that many have already covered some or all of their positions, but if they have not, then over $250 million in heavy PUTS will still NEED TO COVER
Link: fintel.io/sonv/us/mara
Defcon 2 retweeted
Reminder: $MARA will deliver somewhere in the ballpark of $500 - $600 Million in GAAP Net Profit when they report Q3 earnings while analyst consensus is projecting that they will post a Q3 GAAP Net Loss
Brace yourself for positive "EARNINGS SURPRISE" headlines
NFA / DYOR