
The innovation platform for corporates, startups, and everyone in between 🏠. Led by serial entrepreneur, VC, & AEC professional @reddy_kp.
Joined February 2023
- Tweets896
- Following2.1K
- Followers444
- Likes170
Happy Thanksgiving! 🦃
Whatever table you're at today, whoever's around it, we hope it's full, loud, and exactly the kind of day you needed. Thank you for spending any part of this year with us.
Wishing you and yours a warm, grateful Thanksgiving.
#Thanksgiving #Gratitude
1
14
Which AI pilot at your firm has been running longest, and who is on the hook for it reaching production?
29
Your network is bigger than your budget. Giving Tuesday is Dec 1. KP Reddy Co, in support of Zero RFI, is backing TrackGirlz. Share this with one person who gives, and tell us your nonprofit.
Donate: sbee.link/x4em9uv6c8
13
Norway's grid operator paused new data center reservations. 18 GW requested against a grid that peaks at just over 25. Phased energization is a financing decision wearing an engineering costume.
The essay: sbee.link/ncwqd6prjy
9
If every tool in AEC has gotten faster, why hasn't a single building gotten cheaper?
On a KP Unpacked from earlier this year, KP and Nick argue the waste was never inside anyone's workflow. It's in the handoffs — the gap between what one tool exports and the next one can actually use. Efficiency inside a silo doesn't fix a cost problem that lives between silos.
They use Walmart as the comparison: Walmart didn't make its warehouses faster, it rebuilt its entire supply chain around its own rules. AEC hasn't had its Walmart moment yet.
The episode also gets into why incumbent software's pricing power is slipping as AI-native alternatives make switching cheaper, and whether reality-capture archives could eventually do to BIM what AI has done to a dozen other categories already.
Listen to the full episode and more - sbee.link/rcghj7u4kn
2
28
22 of 26 transit measures just passed. ~$31B hit the table on November 3rd.
The vote was the easy part. The first 90 days decide if that money becomes a program or a mystery shortfall.
New paper: what has to be written down before the first dollar moves.
Read the full paper here - sbee.link/xc7gm48arn
20
23 pilots, zero production systems. KP's test: divide pilots by production systems that have an owner and a P&L line. Worse than three to one is a systems problem, not a technology problem.
The essay: sbee.link/67cfhevm38
11
A $189M buildout got approved. A different project got walked away from entirely. Same market, same pressures — different owners.
Healthcare construction costs are up 31% in a year. Margins are at 1.3%. Projects are getting scrapped mid-build — one lost its garage after it was already 80% done.
The owners still moving aren't the lucky ones. They built the off-ramp into the budget before they needed it.
Full paper here - sbee.link/ndx4efa3hc
10
The bottleneck in modular construction was never the factory. It's translating plans into something the factory can actually build - without losing the customization every project needs. Brian Sayre unpacks it on the newest KP Unpacked. 🎧 sbee.link/9vnrg8hxt4
1
11
What we got wrong: we told firms to hire specialists and let AI do the rest. The winners hired people who refused to stay in a lane.
27
TrackGirlz giving menu: $50 resources, $100 a girl's workshop, $300 a full experience. KP Reddy Co is giving on Dec 1. Which number are you?
Donate: sbee.link/6ckv97t8hw
15
The 10x engineer is finally real. KP: 10x was never ten times the code. The winner is not the specialist or the generalist, and AEC bills specialization by the hour. The essay: sbee.link/juvb7nxk84
17
Same beam, four different problems.
The client wants the longest span possible without custom fabrication. The superintendent is thinking about truck timing and traffic. Permitting is worried about wide-load rules that can tack on 90 days. The supplier is tracking lead time and availability.
Nobody's wrong. They're just looking at the same drawing from a different seat.
On KP Unpacked, Dr. Barry Clark makes the case that the edge cases your team catches aren't the risk — it's the ones nobody on the team even thought to look for, because nobody's sitting in that seat.
What's the detail on your current project that one person treats as obvious and another treats as the whole problem?
Listen: sbee.link/m3vcext9j7
14
A story from the KP Unpacked that's hard to shake.
A young trainee at a GE switchgear factory watches the CEO come through, shake a foreman's hand, thank him for his service. The foreman's reply: "You paid for my hands. You could've had my ideas for free."
Nobody had asked him for the ideas. So he never gave them.
How many ideas like that are sitting in trucks and trailers on jobsites right now — unspoken, because nobody signaled they were worth asking for?
If you lead a team: when's the last time you actually asked the person doing the work what they'd do differently? Out loud. Looking at them.
sbee.link/ph8u4rdqmb
1
30
DOL made it easier to call a worker a contractor. Firms that build a staffing model on a rule that flips every four years are building on a pendulum. You do not 1099 an asset. Coverage: sbee.link/3ewxna7c6m
24
Whose data is it on a live project? Probably not just yours.
Barry Clark on what AI infrastructure looks like when the project is the unit of work.
Read it here, and find more in our White Paper Library: sbee.link/dckhtn9xmp
9
A $2B hospital tower, scrapped. A hospital site search, halted. A 200-bed facility, dropped over regulatory risk. A garage cut from a medical center that's already 80% built. All in the first two weeks of November.
Median data center construction cost is up 31% in a year. Median hospital operating margin: 1.3%. A third of health system leaders say they're uncertain about the year ahead.
The owners still building aren't the lucky ones — they're the ones who built the off-ramp before they needed it. One system wrote "natural off-ramps" into its campus expansion from day one. Another runs every change through a standing three-part test: cost, timing, alternative. A third approved $189M to fit out two already-shelled floors (a textbook phased off-ramp) while walking away from a different project entirely once its path got unpredictable.
An off-ramp isn't a feeling you have when things go wrong. It's a structure you build before they do.
Read the paper and more here - sbee.link/hx8rtknuep
30
Your AI strategy is a procurement list. A strategy names the workflow you are willing to break first.
30
28% of AEC firms have AI in production. 7% use it in a core workflow. The difference is not the tool. It is whether the record is clean enough for a tool to read. The essay: sbee.link/8uh7n6vtax
1
47
KP Reddy Co is backing TrackGirlz this Giving Tuesday, Dec 1. They bring track and field to girls in underserved communities and are raising $30,000 to empower 100 girls. Which nonprofit do you back?
Donate: sbee.link/wm9d3ea7qx
19


