
My Tweets are my own & not the views of my employer Journalist at @financialexpress Please reach out at [email protected]
Noida
Joined January 2016
- Tweets3.6K
- Following180
- Followers338
- Likes3.3K
π ππππ πππ ππππ: βΉ2.60-2.80 lakh/MW/month bids may squeeze returns. #BESS
π§² πππ ππππππ ππππ: 1,200-TPA rare-earth magnet plant planned. #CriticalMinerals
1
73
π₯ Spot LNG at ~$22/MMBtu hits city-gas margins. #LNG
π» #Budget: IT industry flags tax hurdles; BESS GST cut sought. #Tech
π’οΈ Gulf firms eye 7 mbpd of alternative pipeline capacity. #Oil
β οΈ Oil minister Hardeep Puri says India is βnot out of the woodsβ yet. #EnergySecurity
2
147
βοΈ ππππ ππππππ: Plants hold ~7 daysβ stock as demand jumps 12.9%. #Coal
β‘ ππππππ ππππππππ: Big consumers go green; utilities may need new business models. #Power
π± πππ πππππππππππ: Biogas could save India $20.6 bn in LNG imports. #CBG
2
158
Saurav Anand retweeted
$7 B in fresh clean energy capital.π°
Total contracted + planned renewable portfolio now at $11 B. βοΈ
2 GW+ of utility-scale power headed to the grid. β‘οΈ
This is what infrastructure-scale FDI looks like on the ground.
Big Techβs exploding demand for data centres and logistics is reshaping Indiaβs energy map.
Amazon just doubled down hard on it's India energy bet.
β’ The Grid Push: Four new projects adding 934 MW. Partners: Sunsure (234 MW wind farm in Karnataka, Amazonβs largest in Asia + 200 MW hybrid), Waaree (300 MW solar, MP), ReNew (200 MW solar, Rajasthan). Once live, the contracted portfolio exceeds 2 GW, enough for 3.5 million+ Indian homes.
β’ The Fleet Shift: Already running 15,000+ EVs across 500+ cities. Now partnering with Tata Motors to bring 3,000 electric trucks online.
β’ The Water Reality: Hit water-positive status in India in 2025, two years ahead of target, replenishing over 120% of what it consumes. An important and sensitive consideration
Data sovereignty needs energy sovereignty. Big Tech is writing the cheque.
@amazonIN @mnreindia @TataMotors @Waaree_Group @ReNew_Global
By @sauravanand04
#CleanEnergy #FDI #DataCenters #EVs #MakeInIndia $AMZN
Saurav Anand retweeted
βΉ15,000 Crore in fresh domestic bioenergy CapEx. π°
100 compressed biogas (CBG) plants feeding the national network by 2030. β»οΈ
This is how you structurally hedge against global petroleum shocks. β
οΈ
Foreign capital is funding the electric grid, but domestic conglomerates are attacking the fossil fuel import bill.
Reliance is converting agricultural residue into commercial power at massive scale.
β’ The CapEx & Scale: A $1.6 billion (βΉ15,000 crore) push to build 100 CBG plants by 2030. RIL already runs 45 plants, targeting 5 million cubic metres of daily gas production.
β’ The Execution: 10 more plants go live by March 2027, feeding directly into city gas distribution networks for households and SMEs.
β’ The Macro Pivot: Indiaβs mandate is to push natural gas from 6.2% to 15% of the energy mix by 2030. This builds a circular economy, slashing imports while generating direct rural income.
β’ The Supply Chain Reality: Capital isn't the bottleneck; feedstock aggregation is. Scaling requires district-wise mapping to secure uninterrupted agro-residue and prevent developer turf wars.
Energy transition is an execution problem. Massive domestic capital is stepping up.
@RIL_Updates
CC: @PetroleumMin @nitin_gadkari
By @sauravanand04
#EnergyTransition #MakeInIndia #BioEnergy #SupplyChain #Macroeconomics
π± πππ #πππ: βΉ15k-cr plan; ~100 plants by 2030.
π’οΈ πππππππ: Agarwal flags Cambay block takeover; $5bn oil push.
π πππππππ ππππ: Local-content rules may widen beyond subsidised projects.
βοΈ ππππππ: #Cleanenergy investment to hit $11 bn by 2030.
π πππππππ πππππ: Export ban aims to retain lithium, cobalt, nickel. #CriticalMinerals
π’οΈ πππ
πππππ ππππ: Diesel cracks near $61.4/bbl boost margins. #Oil
1
92
π’οΈ ππππ-πππ ππππ: Deadline extended for 7th time to Dec 10. #OilAndGas
π πππππππ πππ: Only 22% capacity operational; cell imports jump 94%. #Battery
2
115
Saurav Anand retweeted
45 GW of fresh capacity.β‘οΈ
91.3% renewable. βοΈ
βΉ50,241 crore deployed in a single quarter. π°
India just delivered the most aggressive power capacity expansion in the emerging world.
JanβSept 2026:
β’ Net additions jumped 16% YoY, taking total installed capacity to nearly 559 GW.
β’ Solar alone delivered 35,242 MW
β’ Renewables contributed 41,239 MW (91.3% of all new capacity)
β’ Non-fossil share of the grid rose to 55.1%.
β’ RE investments rebounded 21% sequentially to βΉ50,241 crore ($5.28 bn) in the September quarter.
This is not rooftop solar theatre.
It is the hard infrastructure required for semiconductor foundries, AI data centres, PLI mega-factories and heavy manufacturing.
By front-loading domestic solar and wind at this scale, India is locking in the energy sovereignty needed to power the next industrial cycle.
cc: @mnreindia @MinOfPower @InvestIndia @FollowCII
By @sauravanand04
#EnergyTransition #RenewableEnergy #SolarPower #IndiaGrowth #MacroEconomics
Saurav Anand retweeted
Pragmatism > Bureaucracy.
βΉ43,200 crore in capital. π°
60 ultra-deepwater wells. π
Monthly bidding instead of annual delays. β
οΈ
India is weaponizing policy pragmatism to secure its long-term energy future.
The government is aggressively overhauling its deepwater oil and gas exploration framework. The Directorate General of Hydrocarbons (DGH) has just removed revenue-share quotations from bid evaluations.
Companies will now be selected based entirely on their committed work programmes.
The De-Risking Strategy:
To attract serious global hydrocarbon majors, the government is stepping in as a true financial partner. It will now cover up to 50% of eligible drilling costs (capped at βΉ675 crore per well) under the broader βΉ84,084-crore Samudra Manthan scheme.
The Strategic implications:
By scrapping rigid revenue-share requirements and relaxing financial guarantees for foreign partnerships, the government is actively de-risking high-capex exploration.
We are trading short-term bureaucratic control for long-term domestic energy sovereignty.
cc: @PetroleumMin @HardeepSPuri @DghIndia @ONGC_
By @sauravanand04
#EnergySecurity #OilAndGas #Policy #IndiaGrowth #MacroEconomics #EnergySovereignty
π± πππππ: βΉ4,500-cr, 300-MW Andhra green project. #Renewables
π’οΈ ππππππ: Gulf oil flows may stay below pre-war levels in 2027. #Oil
π° πππππ πππ: India gets ~$400 bn clean-energy pledges.
π πππππππ: βΉ14,500-cr VGF plan targets 92 GWh. #Battery
1
109
Saurav Anand retweeted
$400B committed. 2x the 2030 target. π°
47 GW cell base pacing toward 70 GW by December 31. βοΈπ
At the Bharat Renewable Energy Summit, Union Minister Pralhad Joshi confirmed that global and domestic CEOs have placed massive faith in India's energy transition despite wider geopolitical volatility.
The core industrial priorities which are anchoring these commitments:
β’ Capital Aggregation: Pledges span renewables, green hydrogen, battery energy storage systems (BESS), and national grid transmission infrastructure.
β’ Solar Cell Acceleration: Domestic cell capacity currently stands at ~47 GW, with module and cell makers on track to breach 70 GW before the end of the year.
β’ Policy Realism: Consultations over the next two weeks will review whether to extend solar cell manufacturing relaxations, balancing rapid project rollout against long-term domestic self-reliance.
Securing capital commitments solves bankability; scaling 70 GW in domestic cell production solves tech sovereignty.
cc: @mnreindia @JoshiPralhad @PiyushGoyal @investindia
By @sauravanand04
#CleanEnergy #RenewableEnergy #MakeInIndia #SolarEnergy #EnergyTransition
Saurav Anand retweeted
βΉ3 lakh crore capex. 5x surge to 7.5 GW by 2030. ππ
Indiaβs AI data centre boom isnβt constrained by capital or demand. Itβs constrained by power. β‘οΈ
β’ Grid Load Reality: Per CRISIL, upcoming data centre capacity in Mumbai alone will equal ~80% of the cityβs current peak power demand by FY30, with Mumbai, Hyderabad, and Vizag absorbing 75% of new builds.
β’ Structural Cost Advantage: Development costs are ~20% lower and rentals 30β35% cheaper than APAC peers, with >95% of capacity under construction already pre-contracted under 15β20 year tenors.
β’ The Transmission Challenge: GenAI workloads require high power density and advanced liquid cooling. Converting committed capital into live compute hinges entirely on dedicated green energy corridors and continuous power availability.
Compute is only as scalable as the electrical grid behind it.
To become the global back-office for AI, power transmission must match the pace of server deployment.
@MinOfPower @GoI_MeitY @CrisilLimited
By @sauravanand04
#DataCentres #ArtificialIntelligence #Infrastructure #EnergyTransition #MakeInIndia
π πππππππ πππ: Local components cost 18-61% more; 2032 demand seen at 236 GWh. #Battery
π€ ππππ ππππππ ππππ: Capacity may hit 7.5 GW by FY30. #AI #Power
βοΈ πππ ππππ: 3 GW RE + $1 bn financing target over five years. #Solar
1
62
π± πππππ ππππππ: India eyes 500 GW more non-fossil capacity; βΉ20 lakh cr opportunity.
π₯ ππππ
πππππππ: West Asia regains Indiaβs LNG-LPG share on freight advantage. #LNG #LPG
βοΈ ππππ πππππ: Captive output jumps 42% to 22.03 MT in October. #Coal
1
103
π’οΈ πππ ππππ: Q2 profit βΉ30,106 cr, 39% of FY26 total. #Oil
βοΈ ππππ πππππ: October supplies hit record 70.3 MT. #Coal
π’οΈ πππππππ: Targets crude cost cut to $10-13/bbl. #OilAndGas
2
150













































