SpliceFlow (@spliceflow) profile picture

Following AI, robotics and future fiber tech from a splicer's seat. The Next Span newsletter: what's coming to fiber and telecom. https://nitter.cf/t.co/5YXFXdk8u4

Joined August 2026
Guangdong Telecom named YOFC top candidate in the largest hollow-core cable tender by a Chinese carrier yet, paired with G.654.E. The piece says HCF splicing is still complex and standards aren't settled. That's what I want to see up close. news.qq.com/rain/a/20261023A… #TheNextSpan
1
63
A robot wrapped fiber around a 10 kV power line in Jiashan, China, crossing crossarms on its own. 5 people on the ground vs 22+ by hand. Fewer climbs sounds great. Curious who builds the splice where the wrap ends. chinadaily.com.cn/m/china/20… #TheNextSpan
6
Juhere showed a fiber prep unit at CIOE 2026 that strips, cleaves and cleans in one step, with an optional robot arm feeding the splicer. A bad cleave usually means a bad splice, so I'm curious. Factory line first, splice trailer someday? juhere.com/news_detail/21.ht… #TheNextSpan
11
A grid operator in Quzhou, China watches 6,000+ km of fibre for digging and pins breaks to within 10 m. Average fault handling fell from 2 hours to under 30 min. On a restoration call, knowing where to dig is half the job. #TheNextSpan stdaily.com/web/gdxw/2026-10…
9
Element8 used Federated Wireless' AI planner to pre-check install sites. Install success went from 79% to over 90% in five weeks. Fewer second truck rolls is the part crews feel. Curious how the digital twin keeps up with the real plant. lightreading.com/fixed-wirel… #TheNextSpan
9
Multicore fiber packs four cores in one cladding: 4x the capacity, same diameter. AFL, Corning, Lightera and TeraHOP formed the SDM4 MSA for it. Splicer question: if four paths share one strand, does one bad splice now cost four? lightwaveonline.com/home/art… #TheNextSpan
1
62
Tata Communications plans a 10,000 km fibre network linking India's AI and data centre hubs, first leg Mumbai-Pune-Hyderabad-Chennai. Still in planning. Splicer brain asks: how many crews and closures does 10,000 km of long-haul take? telecombyte.com/tata-communi… #TheNextSpan
2
59
CityFibre's CTO told aiblLIVE London that AI now checks 100% of install photos, up from a 20% sample. The model runs on the phone, so it works with no signal. Splicer take: proven work gets paid faster. That's the part crews would notice first. aiblmedia.com/downloads/visu…
27
Openserve says its AI fibre sensing learns what normal vibration on a route looks like, then flags someone digging with a spade near the cable. From a splicer's seat, a "go have a look" call before the cut beats an emergency splice at 2am. iafrica.com/openserve-turns-…
8
A clean closeout isn't paperwork for its own sake. Keep the field record on the enclosure the crew stood at. #TheNextSpan Shown: DEMO-1001, simulated demo data. Not a customer job. Invite-only. [email protected]
23
Worst time to find a missing tray photo: when the office kicks the packet back and the crew is already on the next job. Kickbacks hold up pay. spliceflow.app #TheNextSpan [email protected]
7