Andres Vargas 🍥 (@yopera) header
Andres Vargas 🍥 (@yopera) profile picture

(#yopera) Architect, Photographer, Designer with a passion for business and brand development strategy through digital media. social media: @yopera

Vancouver
Joined November 2009
Photo by Andres Vargas 🍥 (@yopera)Photo by Andres Vargas 🍥 (@yopera)Photo by Andres Vargas 🍥 (@yopera)Photo by Andres Vargas 🍥 (@yopera)Photo by Andres Vargas 🍥 (@yopera)Photo by Andres Vargas 🍥 (@yopera)Photo by Andres Vargas 🍥 (@yopera)Photo by Andres Vargas 🍥 (@yopera)Photo by Andres Vargas 🍥 (@yopera)Photo by Andres Vargas 🍥 (@yopera)
Andres Vargas 🍥 retweeted
This is real
32,838
191,906
11,338
1,049,473
104,754,935
Andres Vargas 🍥 retweeted
Between the strict height limits by planning and the ridiculous rule in the building code that townhouse doors must be within 5’ of grade we get these poor relationships where yards and porches are below street level rather than a more comfortable 2-4’ above.
2
7
1,205
Andres Vargas 🍥 retweeted
Word on the street is that the BCBC requirements for accessibility which will apply to all elevator accessed apartments will take effect in March. We estimate that for most suites it will add about 80 sqft to the unit area. That translates to $80,000. Affordability Crisis???
2
1
1
8
1,148
Andres Vargas 🍥 retweeted
The Narrows, our Passive House project that received the Clean BC design award, just reported an Air Tightness result of .4 air changes per hour at 50 pascals. Congratulations to Scott Construction. @ScottConstructs @ZEBxchange
4
4
1
20
2,116
Andres Vargas 🍥 retweeted
Skagen. Our Passive House project in Coquitlam is now complete.
1
1
8
765
Andres Vargas 🍥 retweeted
Our client is planning to re-develop. He is owed $8,000 in unpaid rent. Paid Baliff's $3,000 to enter the premises they declared it abandoned. Serious damage. The city requires our client pay the tenants compensation in the amount of 4 months rent plus $1000 moving expenses.
9
2
1
11
4,841
Andres Vargas 🍥 retweeted
Putin reportedly has fled Moscow. You know who didn't flee the capital ahead of advancing Russian forces? President Zelenskyy.
5,832
5,656
506
40,918
2,424,250
Andres Vargas 🍥 retweeted
Trust the Italians to come up with an aesthetic outdoor unit for a split system or mono block that can be installed against a wall, front intake top exhaust. It can also be recessed with a front exhaust. Muti colours too.
4
4
38
6,123
Andres Vargas 🍥 retweeted
KNOCKED OUT from FULL MOUNT! 🤯 Former WBO cruiserweight champ 🇵🇱 Krzysztof Głowacki is dangerous from anywhere!! XTB #KSWColosseum2
284
1,155
746
7,771
3,578,623
Andres Vargas 🍥 retweeted
Toured some planners from Coquitlam through Skagen our Passive house townhouse project in Coquitlam today. Almost finished.
2
2
15
1,677
Andres Vargas 🍥 retweeted
We have allowed this level of bureaucracy to thrive. Lets insist it be transformed. ABC
I can’t believe they have to go through a development permit process just to get a table on the sidewalk @Brassneckbrew #vancouver
1
3
368
Andres Vargas 🍥 retweeted
Small Planet Supply is developing a system to store hot water energy in a series of phase changing salts at cascading temperature points. ⁦@ZEBxchange⁩ ⁦@PassiveHouseCan⁩
2
1
3
337
Andres Vargas 🍥 retweeted
It doesn't get more inspirational than THIS 🙌 Pure joy for @Stylebender #UFC287
616
11,545
1,712
46,120
3,671,142
Andres Vargas 🍥 retweeted
A touching and heartfelt tribute from Islam Makhachev to his late coach, Abdulmanap Nurmagomedov ❤️🦅
56
894
43
10,186
Andres Vargas 🍥 retweeted
Eliminate project coordinators, assign applicants a staff member in each department with authority to make decisions, interpret regulations liberally, support staff that make mistakes
At the end of last week's @CTVVancouver Election Night coverage I said @KenSimCity will have no trouble improving the development approval process. Here are some of the things he might do. gellersworldtravel.blogspot.…
1
2
Andres Vargas 🍥 retweeted
Everyone arriving at Twitter to declare Yan was robbed #UFC280
68
531
37
4,229
Andres Vargas 🍥 retweeted
In a staff meeting today. The common theme related to projects was "still waiting" related to municipal authorities. We need a system that gets responses in a timely manner from staff with authority to make decisions.
2
6
Andres Vargas 🍥 retweeted
BCHydro should subsidize the deployment if batteries in sync with solar panels on its grid. apple.news/Aqs7mbxcyQRKdjCVp…
1
1
Andres Vargas 🍥 retweeted
Reasonable detail until you layer the BCHousing CMHC accessible sill requirements. Generally the balcony needs a totally separate structure or the interior floor structure needs to get thicker. Then there is the COV obsession with height….
Replying to @Lanefab
Easy, but not simple. Image courtesy @RDHBuildings
3
7
Andres Vargas 🍥 retweeted
Another meeting today with a client requesting a smaller lobby and to eliminate a rooftop Amenity because circulation, even to amenities, is included in Vancouver’s Floor space limits. We need regulation change the supports not sabotages livability
1
7
1
26