Parandur can come back, on the CM's own principles.
The CM's test for growth is clear: development, but not at the cost of farmers, homes or water. Here is how Parandur can pass every one of those tests.
THE PROBLEM
• Chennai still has no second-airport site. TIDCO's own RTI reply: the final site is "not yet selected."
• About 1,500–1,700 acres at Parandur are already bought and paid for, waiting for a use.
• Chennai handled 23 million passengers last year. Bengaluru: 44.5 million. Hyderabad: 30.5 million.
• A new airport takes 8–10 years. Starting from zero costs time Chennai doesn't have.
WHY THE CM WAS RIGHT TO STOP THE OLD DESIGN
• The site's tanks hold about 9.3 million m³ of water (independent estimate). The 2024 plan's Nelvoy reservoir: 5.69 million m³. About 60%.
• The site was to be raised 1.5 m above flood level. Navi Mumbai used 2.5 m.
• Farmers were offered cash only. The plan literally said "land for land: not applicable."
THE FIX: PARANDUR, DONE RIGHT
1. Water first
– At least 9.3 million m³ of new storage. Not a drop of storage lost.
– Drainage built for a 1-in-100-year storm, the national standard for big-city airports.
– At least 2.5 m above flood level.
– New reservoirs built and tested through a full monsoon before any tank is touched.
– Flood studies for the Kosasthalaiyar, Cooum and Adyar published first.
– Zero water drawn from farmers' lakes.
2. Farmers paid better, and protected
– Phase 1 needs one runway. The second isn't needed until 2043.
– Buy that land now. Farmers keep farming it until a fixed date written into the deed.
– A yearly payment from a locked fund (at least ₹30,000–50,000 per acre, rising 10% a year), so a change of government can't stop it.
– At handover: a top-up, plus at least 22.5% of the land back as developed plots, or shares in a farmer-owned company.
3. New homes before old ones are touched
– A ready township handed over before any eviction. Villages move together.
– One guaranteed job or apprenticeship per family, at the aviation academy, MRO hangars and cargo hub already in the master plan.
4. The people decide
– Put the full package to the gram sabhas. 70% yes: Parandur proceeds on the CM's terms. No: the alternative site gets the same standards.
THE IMPACT
• An airport that keeps every litre of water storage the land holds today.
• Farmers who earn while they wait, and own a share of the airport economy.
• Bengaluru–Chennai Expressway at the gate (92 of 106 km done in TN), a metro extension plan the state approved in 2025, and MRO and cargo planned from day one.
• Studies done and nearly half the land in hand: years ahead of starting over.
The CM didn't reject an airport. He rejected a design.
Parandur, done right, is the design he asked for.
Full 5-minute explainer, maps and sources in the reply 👇
@CMOTamilnadu @TNIndMinOffice @Guidance_TN @SIPCOTTN @SingaiGR @aaichnairport @AAI_Official @MoCA_GoI
#Parandur #Chennai #InvestInTN #AAI
Parandur is in court. Here's how the arguments could flow. 👇
On 20 Nov, the Madras High Court asked why the airport project was dropped midway, after 1,700+ acres were acquired and ₹680 crore was spent. Next hearing: ~21 Dec.
Who says what
• Petitioner: reconsider with reasons, show the files, keep the land as it is.
• TN Govt: it's a policy decision. Water bodies make clearance hard. A G.O. with the reasons is coming.
• AAI: its 2022 study rated Parandur feasible, and it was the preferred site.
• TIDCO and the Ministry: replies due.
The court's question
Is the decision reasoned and backed by records?
Other paths
• More time: replies filed or the hearing adjourned.
• Decision stands: the search for a new site continues.
Best case (our view)
1. The land is kept as it is while the case runs.
2. The studies are made public, including the hydrology study by IIT Madras, Anna University and the Water Resources Department.
3. A redesign is weighed against the CM's own four tests: Chennai, water bodies, farmers, development.
4. A decision built on data, whichever way it goes.
The hope is simple: reasons and studies, in the open.
*Commentary based on public news reports. Not legal advice.
@CMOTamilnadu @TNIndMinOffice @SIPCOTTN @Guidance_TN @AAI_Official @MoCA_GoI
#Parandur #ChennaiAirport #InvestInTN
21 days, or it's deemed approved.
Tamil Nadu just made it law. Good. Now look at the race it's in 👇
THE RACE
Telangana: deemed approval plus penalties on officers who delay, since 2014.
Andhra: speed-of-business law in force since October; now targeting approvals in 5 days through 13 licences.
Karnataka: deemed approval plus an affidavit clearance, so units can start before final approval.
Maharashtra: 20 industrial permits moved to self-certification.
WHERE TN-TREND STANDS OUT
• Trade licence 3 → 10 yrs (Goa offers up to 10, West Bengal up to 15)
• Tree transit permit 1 month → 1 yr
• One 21-day cap across state laws, watched by a Chief Secretary-led commission
WHAT TO MATCH NEXT
• Start before final approval (Karnataka)
• Penalties on officers who delay (Telangana)
• No land-use conversion for low-risk categories (Andhra, Uttarakhand)
WHERE TN CAN GO FIRST
Matching others keeps TN in the race. Going first wins it.
1. Government-guaranteed land titles. Only Rajasthan and Maharashtra have passed the law, and neither has fully rolled it out. Start with SIPCOT land; Centre funding is there till 2031.
2. Test every new rule before it's notified, with an expiry date unless renewed. TN's own officials have championed this nationally. Make it law.
3. Permitted unless prohibited: low-risk businesses register and start, no licence needed.
4. A public clock: median approval days per department, published monthly.
21 days gets TN into the race. These four make others copy TN.
@TNIndMinOffice @Guidance_TN @CMOTamilnadu @SIPCOTTN
#InvestInTN #StartupTN
1
72
Chennai's second airport was first proposed in 1998.
28 years later, there is still no site.
On 20 Nov, the Madras High Court asked the state a simple question: why was Parandur dropped after 1,700 acres were acquired and ₹680 crore spent?
Where it stands:
• 24 Aug: Parandur cancelled. Reasons given: water bodies, farmland, livelihoods.
• September: two new sites, Cheyyur and Manellore, sent to AAI for study.
• 90 days later: no response yet from AAI or the Civil Aviation Ministry.
The long wait:
• 2007: Sriperumbudur announced, then dropped over land.
• 2022: Parandur chosen, 15 years later.
• 2026: cancelled. The search starts again.
What the wait is costing Chennai:
• Passengers: 23 million last year. Bengaluru 44.5 million, Hyderabad 30.5 million.
• Flights: the airport can't take the largest wide-bodies, and direct routes have gone elsewhere.
• Cargo: much of the region's electronics leaves by air. Hyderabad is now a major cargo hub.
• New companies: new GCCs, Jan–Aug 2026: Hyderabad 40, Bengaluru 30, Chennai 8.
What's missing is data.
• The reasons for cancelling have not been backed by a published technical study.
• The hydrology study by Anna University, IIT Madras and the Water Resources Department, promised when Parandur was chosen, was never made public either.
So people can't judge the case for building it, or the case for cancelling it.
What Chennai needs:
1. Publish the technical reasons: water, floods, farmland, airspace, with the data behind them.
2. Get them verified by an independent expert panel, not by any party or department with a stake in the answer.
3. Let that panel propose solutions, and judge Parandur, Cheyyur and Manellore on the same tests.
4. Put a date on the decision.
Whichever site wins, it should win on evidence. And every month of waiting is a month of investment decided elsewhere.
@CMOTamilnadu @TNIndMinOffice @Guidance_TN @MoCA_GoI @AAI_Official
#Chennai #ChennaiAirport #InvestInTN
1
1
150
Common Man retweeted
We need a second Integral Coach Factory (ICF-2) near Cheyyur to manufacture next-generation coaches. At present, ICF does not have a standard-gauge, Cape-gauge, or metre-gauge test track for proper vehicle testing. A new rail link from Walajabad to Cheyyur or beyond could be developed to fill this gap.
Instead of just another factory, why not build a complete railway park at Cheyyur or beyond ? It could house facilities for metro coaches, monorail systems, aluminium-bodied coaches, wagons, and related components — creating a full ecosystem under one roof.
Chennai's ICF to Build 119 Faster AC Rakes for Mumbai Locals Under Rs 26,000-Crore Upgrade
🚄 130 kmph top speed, existing locals capped at 110 kmph
🛡️ Kavach safety system, CCTV and Vande Metro-style amenities on board
swarajyamag.com/news-brief/c…
This week, Tamil Nadu made two big maritime moves in Delhi.
At the India Shipbuilding Investment Conclave, Guidance TN invited global shipbuilders and marine component makers to set up in the state, pitching the new shipbuilding clusters at Thoothukudi and Cuddalore. The same day, TN minister Aadhav Arjuna met Union Ports Minister Sarbananda Sonowal and asked for funding for the state's major port and waterway projects.
So what is actually happening in Thoothukudi? Let's take a look.
What's already on the ground:
• VinFast rolled out its first car here in 2025 and is expanding on 500 more acres.
• Cochin Shipyard has paid for 127 acres at VOC Port for building and repairing ships.
• HD Hyundai (HD KSOE) is the anchor of a ~2,050-acre shipbuilding cluster next to the port, expected to create about 15,000 direct jobs. Detailed land and seabed studies are under way.
• Two new SIPCOT parks, Mudivaithanendal and Sillanatham, cover 3,864 acres: ₹2,164 crore of state infrastructure, aiming for ₹12,000 crore of investment and 30,000 jobs.
• Space: ISRO's second spaceport at Kulasekarapattinam (small-rocket launches from 2027-28), a shared rocket test facility at Allikulam with IN-SPACe, and Skyroot's ₹250 crore MoU for rocket testing and integration nearby.
One coast, with a shipyard, a spaceport and an EV hub coming up together.
What would make it even stronger:
1. Local suppliers
A shipyard is a magnet; the jobs multiply in the companies that supply it. Guidance TN is already inviting them, with "Vendor Parks close to the Clusters". HD Hyundai plans to bring its own vendors, and the state tracks localisation with HD KSOE every week. A published localisation roadmap, with a rising share of Indian and MSME suppliers each year, would lock it in. Tamil Nadu has done this before: Hyundai Motor India reached 82% local sourcing with nearly 200 suppliers.
2. Engines
Engines are among the costliest parts of a ship, and India imports almost all of them for merchant ships. Two doors are open: HD Hyundai's engine arm is the world's largest maker of big two-stroke ship engines, and Everllence, the world's largest ship-engine company, is looking for Indian partners. Our suggestion: an engine assembly line in the Thoothukudi vendor park, backed by Tamil Nadu's engine makers in Chennai and Hosur.
3. Rockets, not just launches
Our suggestion: a shipyard's skills (heavy welding, precision fabrication, testing) are what rocket makers need too. With a port next door to move big parts, Thoothukudi can build rockets, not only launch them.
The momentum is spreading along the coast. Among the minister's requests: a greenfield deep-sea port at Cuddalore, and deepening the Pamban channel to 10 m, on the route the Centre chose so that Ram Setu stays untouched. Smaller ships, barges and ferries could then move between Thoothukudi, Rameswaram, Cuddalore and Chennai without going around Sri Lanka.
Thoothukudi isn't just getting investments. It's shaping up as a coast of industries. Let's make sure the suppliers, the engines and the rocket parts are made here too.
@Guidance_TN @TNIndMinOffice @SIPCOTTN @CMOTamilnadu @AadhavArjuna @shipmin_india
#InvestInTN #TamilNadu
ஒன்றிய அரசின் மாண்புமிகு துறைமுகங்கள், கப்பல் போக்குவரத்து மற்றும் நீர்வழிகள் துறை அமைச்சர் திரு. சர்பானந்த சோனாவால் அவர்களை இன்று டெல்லியில் சந்தித்து, தமிழ்நாட்டின் முக்கிய கடல்சார் கட்டுமான மேம்பாட்டுத் திட்டங்களுக்கான நிதியுதவி கோரிக்கையினை முன்வைத்தோம்.
மாண்புமிகு தமிழ்நாடு முதல்வர் அவர்கள் வழிகாட்டுதலின்படி, 'சென்னை துறைமுகத்தை மேம்படுத்துதல், சென்னை மெரினா, மகாபலிபுரம் மற்றும் புதுச்சேரியில் கடல் நடைபாதைகள் மற்றும் படகுத் துறைகள் அமைத்தல் - சென்னை மற்றும் புதுச்சேரி இடையே பயணிகள் படகு போக்குவரத்து துவக்குதல், இராமேஸ்வரம் - இலங்கை தலைமன்னார் இடையே பன்னாட்டுப் பயணிகள் படகு போக்குவரத்து துவங்குதல் ஆகியவற்றை உள்ளடக்கிய இராமேஸ்வர துறைமுக மேம்பாடு, கடலூர் பசுமை வள ஆழ்கடல் துறைமுக மேம்பாடு, பக்கிங்காம் கால்வாய் புனரமைத்தல் மற்றும் ஆழப்படுத்துதல், மேற்கு மற்றும் கிழக்கு கடல் பகுதியை இணைக்கும் பாம்பன் கால்வாயை 10 மீட்டருக்கு ஆழப்படுத்துதல்' ஆகிய திட்டங்களுக்கு உடனடி நிதியுதவி வழங்கக் கோரினோம்.
1
248
The maps 👇
1. How Thoothukudi is shaping up: port and shipyards on the coast, EV and industrial parks inland, spaceport 50 km south.
2. Tamil Nadu's maritime asks this week, from Cuddalore's deep-sea port to a deeper Pamban channel.
1
48
Sources: Guidance TN (investingintamilnadu.com), DGMA cluster page, VOC Port, SIPCOT announcements, IN-SPACe, and the minister's post of 17 Nov. Positions on the maps are approximate.
31
Common Man retweeted
Taking Tamil Nadu’s Exports Further. Opening Doors to Global Markets.
Niryat Protsahan and Niryat Disha, the two key components of the Government of India’s Export Promotion Mission (EPM), provide a comprehensive framework of financial and non-financial support to strengthen exporters and expand India’s global trade footprint.
With a total outlay of ₹25,060 crore over six years, the Mission focuses on two key areas:
Niryat Protsahan: Financial assistance through interest subvention, collateral support, export factoring, e-commerce credit assistance and support for emerging export opportunities.
Niryat Disha: Non-financial support through market access, reimbursement of certification costs, overseas warehousing, trade intelligence, freight logistics and global outreach.
Tamil Nadu accounts for 13.68% of India’s merchandise exports and aims to leverage the Mission to access a proportionate share of the available support, reflecting its contribution to the country’s exports.
Guidance Tamil Nadu continues to connect exporters across the State with opportunities and support mechanisms to enhance their global competitiveness.
#InvestInTN #ThriveInTN #LeadWithTN #Exports
@CMOTamilnadu @TNIndMinOffice @Keerthana4VNR @deepakj2012 @Pallavi2607 @TNDIPRNEWS
Common Man retweeted
Glad to interact with heads of state maritime boards and other senior officials on the sidelines of the India Shipbuilding Investment Conclave 2026.
As part of Team Maritime India, they are driving the country's maritime transformation and shaping our journey towards Viksit Bharat.
Common Man retweeted
ವರ್ಷಗಳ ಕಾಲ ಭೂಸ್ವಾಧೀನ ಮತ್ತು ವಿವಿಧ ಇಲಾಖೆಗಳ ನಡುವಿನ ಸಮನ್ವಯಕ್ಕೆ ಸಂಬಂಧಿಸಿದ ಸವಾಲುಗಳನ್ನು ನಿವಾರಿಸಿದ ಬಳಿಕ, ಜಕ್ಕೂರು ರೈಲ್ವೆ ಮೇಲ್ಸೇತುವೆ ಇದೀಗ ಸಾರ್ವಜನಿಕರ ಬಳಕೆಗೆ ಸಿದ್ಧವಾಗಿದೆ.
ದೀರ್ಘಕಾಲದಿಂದ ನಿರೀಕ್ಷಿಸಲಾಗಿದ್ದ ಈ ಮೂಲಸೌಕರ್ಯ ಯೋಜನೆಯನ್ನು ನಿರಂತರ ಪ್ರಯತ್ನ ಮತ್ತು ಪರಿಣಾಮಕಾರಿ ಸಮನ್ವಯದ ಮೂಲಕ ಪೂರ್ಣಗೊಳಿಸಲಾಗಿದ್ದು, ಉತ್ತಮ ಸಂಪರ್ಕ ವ್ಯವಸ್ಥೆಯುಳ್ಳ ಸುಂದರ ಬೆಂಗಳೂರಿನ ನಿರ್ಮಾಣದತ್ತ ಮತ್ತೊಂದು ಮಹತ್ವದ ಹೆಜ್ಜೆಯಾಗಿದೆ.
After years of overcoming land acquisition and coordination challenges, the Jakkur Railway Overbridge is ready for public use.
A long-awaited infrastructure project delivered through sustained effort and coordination, to build a better-connected #BetterBengaluru.
Common Man retweeted
Participated in the “One Nation, Many Startup Engines” panel at Huddle Global 2026 in Trivandrum, Kerala.
Every state brings different strengths. Connecting them gives founders access to manufacturing capabilities, research facilities, investors and customers beyond their home state.
A startup from Kerala should be able to find a manufacturing partner in Coimbatore as easily as a startup from Tamil Nadu finds a customer in Kochi.
That is the kind of collaboration between states we should build, measured in products launched, orders won and businesses grown.
A startup’s ambition should never be limited by the state in which it begins.
Under the guidance of Honorable Chief Minister Thiru C. Joseph Vijay @CMOTamilnadu @TVKVijayHQ Avl and with the support of Honorable MSME Minister Thiru Mathan Raja @pmathanrajamla Avl, we look forward to exploring more opportunities to collaborate with other states and help our startups grow.
Common Man retweeted
Centre is planning a 35.76 km underground rail corridor through Siliguri’s ‘Chicken’s Neck’, a strategic stretch connecting the Northeast with the rest of India.
The project includes two underground rail lines between Tin Mile Haat and Rangapani, along with upgrading existing tracks to four lines, creating a 6 line rail network (4 overground + 2 underground).
The underground tracks will be built 22-24 metres below ground and will improve security and defence connectivity, including links towards Bagdogra.
TN should leverage it's natural connection with Singapore to get the campuses in Chennai. Give land for free if required. Having both IIT Madras and NUS will be a game changer.
@CMOTamilnadu @TNIndMinOffice
🚨 JUST IN: 🇮🇳 India invites 🇸🇬 Singapore universities to set up campuses
India has invited more Singaporean universities to establish campuses in the country, Union Education Minister Pralhad Joshi said.
The proposal also includes seeking Singapore's expertise in developing university townships modelled on the National University of Singapore's (NUS) University Town.
68
Common Man retweeted
🚨 AP Govt launches ‘Vidya Vahini’, an online learning portal offering free AI and Quantum Technology courses to university students across Andhra Pradesh.
▫️ Two courses are being offered initially, each carrying 4 academic credits and comprising 40 modules.
▫️ Registration is free for both students and content creators.
▫️ The portal is developed by APSCHE and aligned with NEP 2020.
The bullet train will stop in Karnataka and Andhra, near Kolar, Hoskote and Chittoor.
In Tamil Nadu, it stops only around Chennai.
Coimbatore, Madurai, Salem, Nagercoil? Not on the map.
Get ready first. That's how the next bullet train, expressway and factory come to every TN city.
The problem
Today, Coimbatore is about 6 hours from Chennai by the fastest train. Nagercoil is about 9. National high-speed money is going capital to capital, and that's fine. But TN has no single plan of its own to link its other growth cities.
The fix: TN's own spine, built as industrial corridors
Plan roads, rail and industrial parks together, not as separate files.
1. Southern Corridor: Chennai–Trichy–Madurai–Tirunelveli–Nagercoil, anchored by Thoothukudi port and the new Vizhinjam port next door.
2. Western Corridor: Chennai–Salem–Erode–Tiruppur–Coimbatore, joined to Kerala's Palakkad industrial node, 50 km from Coimbatore.
3. Northern Corridor: Chennai–Vellore–Krishnagiri–Hosur, extended to Dharmapuri and Salem.
Pitch hard for expressways
• Chennai–Trichy–Madurai: access-controlled all the way, not cut short at Tindivanam.
• Chennai–Salem–Coimbatore: a fresh alignment, with a fair land deal for farmers.
• Madurai–Nagercoil–Thiruvananthapuram, and Coimbatore–Palakkad.
Get ready now. Don't wait for 2035.
• Protect the land on these alignments today, so TN is ready the day high-speed rail and expressway funds open.
• Use the rail we already have: the Chennai–Kanniyakumari line is now almost fully double-track, yet runs about 1.4 trains an hour (per an RTI petition).
• Merge the RRTS studies, expressway reports and speed upgrades into one "TN Intercity Spine" plan.
• Close Hosur's gaps: the Bengaluru metro link and the Tirupattur–Hosur rail line.
Why it matters
Link our own cities first, and the bridges follow. Kerala's announced fast-rail plan already points toward Coimbatore and Kanyakumari. Then Chennai–Thiruvananthapuram and Chennai–Kochi high-speed lines run through TN cities, not around them.
National money goes to the state that's ready first. Let's be ready.
@TNIndMinOffice @CMOTamilnadu @Guidance_TN @SIPCOTTN @GMSRailway @AadhavArjuna
#InvestInTN #TamilNadu
Common Man retweeted
When will Coimbatore's Pump manufacturing cluster become a USD 5 billion Industry?
The manufacturing capability exists but adoption to modern technology is essential to reduce cost and scale up production. The challenge also lies in overcoming fragmentation, strengthening export competitiveness, and building collective action across hundreds of enterprises.
In my article in October 2026 SIEMA Magazine, I explore the opportunities, bottlenecks, and strategic choices facing India's premier pump manufacturing cluster.
Rajkot cluster is fast growing, and it may leave Coimbatore behind soon unless the 'Pump City' transforms immediately.
Tamil Nadu grew 10.8% last year after inflation, and ₹1.14 lakh crore of MoUs have come in since May. That's good news, and congratulations to @Keerthana4VNR and team.
Now the harder question: are we winning the new companies? Their first plants decide where the next decade's jobs go.
We compared TN with other states, sector by sector: what each state offers, and who won.
1. Electronics components: TN leads.
TN was the first state to match the Centre's subsidy rupee for rupee. It won 5 of the first 7 national approvals. A clear offer, made early, works.
2. Semiconductors: TN offers more, but has 0 plants.
TN tops up the Centre's chip support by 50%, Gujarat by 40%. Yet Gujarat has 6 approved chip units and TN has none. Gujarat had its policy two years earlier, chip land at Dholera at 75% off, and committed water. In chips, ready land, water and speed seem to matter more than the subsidy rate.
3. Data centres: TN's offer is behind.
TN's 2021 policy gives electricity tax and stamp duty breaks. Andhra's gives 25% off land, a 10% capital subsidy, State GST refunds and power ₹1/unit cheaper for 15 years. Google (1 GW) and Reliance (1.5 GW) chose Vizag. Hyderabad's pipeline is 710 MW; Chennai's is 368 MW.
4. GCCs: no dedicated policy.
Karnataka has a GCC policy targeting 500 new centres. Telangana and Karnataka pay payroll and rent subsidies. Andhra gave IT campus land at 99 paise an acre. New GCCs in Jan–Aug 2026: Hyderabad 40, Bengaluru 30, Chennai 8.
5. Green hydrogen: early start, slow on the ground.
Thoothukudi was named a hub in 2023. The same company is building in Kakinada while Thoothukudi is still at the MoU stage. Tracked capacity: Gujarat 9.1 mtpa, Andhra 8.4, Karnataka 5.8, TN 5.4.
6. Auto and EV: mixed.
VinFast came, the first new carmaker in TN in 15 years. Toyota's ₹20,000 crore plant went to Maharashtra.
What this tells us: where TN made a clear offer early, it won. Where its policy is old, missing or slow on the ground, neighbours took the anchor companies.
And neighbours pay big for anchors. Andhra's Google package is about ₹22,000 crore, roughly a quarter of the investment. Karnataka gave Foxconn about ₹7,000 crore.
So, questions for TN:
• Should TN pay more for anchor companies, and pay only when jobs and capacity actually arrive?
• How does the state earn it back faster: keep the land around the anchor, require suppliers to come, claw back if targets slip?
• Can the electronics 1:1 match be copied for data centres and GCCs?
• For chips and hydrogen, is the answer more money, or ready land, water and speed?
TN is doing the right things. The next step is making sure the next Google or Micron says "Tamil Nadu first."
@Keerthana4VNR @Guidance_TN @TNIndMinOffice @SIPCOTTN #InvestInTN #TamilNadu
1
188
Common Man retweeted
Building a city for the future & Building a better way of life.
During a special fireside conversation with Palki Sharma at the 31st CII Partnership Summit 2026, Hon'ble Chief Minister Shri N. Chandrababu Naidu shared his vision for Amaravati as a world-class capital built to international standards.
From an integrated underground utility network that eliminates conventional overhead poles and repeated road excavation to a vision of 50% green cover, abundant water resources, interconnected river systems and clean energy, Amaravati is being envisioned as a city where infrastructure, nature and technology work together. With deep technology integrated across urban systems and a commitment to net-zero development, the vision is to create a city that is not just equipped for tomorrow, but offers a better quality of life for generations to come.
@CII_PS @CII4Global
#CIIPartnershipSummit2026
#Amaravati #ChooseSpeedChooseAP #InvestInAP #APEDB
Hyderabad is building a fourth city. Amaravati is rising from scratch.
Chennai's next growth centre was Parandur. In August, it was dropped.
So where does Chennai grow next?
Hyderabad's reason was simple: growth piled into one corner. The west got the jobs, then the traffic and the floods. So Telangana planned a new city near its airport, with room to build.
Chennai's answer so far is to go up. The Third Master Plan pushes vertical growth in the core. That's right, but the next 20 years also need land at the edges.
Chennai doesn't need one mega-city. It already grows in corridors: ports in the north, factories in the west, IT and industry down GST Road. Distributed growth fits Chennai.
And it's already on paper. CMDA identified growth centres around the city: Minjur, Thiruvallur, Thirumazhisai, Chengalpattu, Mamallapuram and more.
But where do they stand today? Kancheepuram's new-town plan was withdrawn in August to avoid overlap with another plan. This year's urban policy note doesn't mention the others. A clear word on them would help.
There's history too: the Second Master Plan (2006–26) promised satellite towns. Delivery was the gap.
And wherever the second airport lands (Parandur, Manellore or Cheyyur), it should anchor one of these centres.
What could make it work this time:
1. One anchor and one identity per centre. Port town, factory town, knowledge town.
2. Transit before towns. Metro, rail and ring road first, then zoning.
3. A small delivery team per centre, with its own budget.
4. An airport city wherever the second airport goes.
5. A yearly scorecard: jobs, homes and transit delivered per centre.
The result: jobs closer to where people live, less pressure on OMR and GST Road, and growth that doesn't depend on one site.
The Third Master Plan is still being written. This is the moment.
Each centre in the replies 👇
@CMOTamilnadu @CMDA_Official @TNIndMinOffice @SIPCOTTN @Guidance_TN
#InvestInTN #Chennai
1
1
133
7 | Mamallapuram: coast and heritage
Already planned: a CMDA new town. The Peripheral Ring Road's last stretch ends here, but its tender was cancelled.
What would make it work: heritage-first building rules, tourism and events, and restart the ring road's final stretch.
1
11
8 | The airport city: three ways it could go
No final site yet. Wherever it lands, plan the town with it.
🟠 Parandur (west, dropped Aug 2026): joins the factory belt. Best fit: electronics and aerospace town.
🔵 Manellore (north, ~50 km, shortlisted): near the ports, and Pulicat Lake must be protected. Best fit: port and air-cargo logistics town.
🟢 Cheyyur (south, ~100 km, shortlisted): on the ECR, needs a fast link. Best fit: tourism and coastal industry town.
14