TADIR🧞 retweeted
She is running for president in France
You heard it here first
I will be leaving the @ECB in February 2027 because I want to have the freedom of speech, the freedom of expression, and the freedom to engage on matters that are not monetary policy matters.
Nigeria matter na just money matter
Left,right,front and center
Wahala. Thanks for the link
vanguardngr.com/2016/11/buha…
10yrs ago, there was same presidential directive to clear same stranded power equipment.
Ire o
You, what do you think?
“Sho le shey”😂
Omo. They’re locked in on those two highways
#observing
TADIR🧞 retweeted
1. Which project(s) are these “containers” for? NIPP? Without proper audit, we may just be releasing scrap.
2. Control cards, Electronics, relays, capacitors, VTs, CTs and other power engineering equipment from 20years ago, if not obsolete, firmware will be outdated and mostly useless.
3. These things require climate control storage systems and not containers that have been under scorching sun and rain.
3. About 13 years ago, I was called into an effort to get some stranded power equipment released, inspected and certify for use. It all died down after some time with no tailwind
4. At this point, it is too late IMHO!
This is one thing that Yar Adua government got wrong.
President Tinubu directs urgent clearance of over 300 containers of stranded electricity equipment, some held at ports for 20 years.
arise.tv/tinubu-orders-relea…
I actually discovered Nigeria wanted to Amend the LUA in 2017. Interesting. I have some ideas.........
Win-Win for everyone I believe
True. @eta_habyb you might like this speech.
N5.5 Trillion For The Rich, But N500bn For The Poor Was “Too Much” youtu.be/WmBZ7zFYV40?si=MI30… via @YouTube
Very Interesting piece of history.
A Few Families Built Florida’s Land Empires — So How Did They Keep Them? youtu.be/qQuHJXcqPXs?si=BoK8… via @YouTube
I know there are containers but 300? Hmm
Nigeria to Increase Transmission Capacity from 5,000MW to 19,000MW in Two Years - Power Minister
The Minister of Power, Joseph Olasunkanmi Tegbe, has disclosed that over 300 containers of power equipment are stranded at various ports across the country, with some left unclaimed for 15 to 20 years.
Speaking at the Federal Executive Council meeting presided over by President Tinubu, Tegbe said transmission capacity will be increased from 5,000MW to 19,000MW within the next two years.
😭
Congratulations!
Wishing you all the best in your studies, @FotoNugget.
Omo. See as you ronu 😭
FG does not fund the project, funding is by the private sector, plus SEDC and the SE State governments,
Reason why some of you guys behave this way is what I don't understand,
Tomorrow now, some of you will try to campaign with "marginalisation" and people will point to this post, when in actual sense, FG did not invest anything.























