
Concentrated bets. Compounding wins. Currently cooking in on $NUAI.
Joined April 2021
- Tweets2.4K
- Following382
- Followers713
- Likes16K
Lovedrop retweeted
$NUAI fell nearly 80% from $7.90 to $1.62. i wrote a second deep dive after this drop. here is what happened next
-> 28 september $7.06
-> 13 november $3.20
-> 18 november $3.99, up 25% on the day
imagine what this does when they announce phase 1 and phase 2 lease....
A second look into my highest upside holding $NUAI.
for more great $NUAI coverage;
@lovedropv @bitcoinbutcher1 @smallcapsnipa @fnitefiend and @alexiswrem1747 @ChairmansLedger
$NUAI One by one, all the pieces are falling into place.
Another regulatory hurdle moving out of the way.
$NUAI
BREAKING NEWS.
Texas regulators are resuming environmental permits for data centers.
texastribune.org/2026/11/17/…
Whats the only thing blocking NUAI P2? TCEQ Air permit.
You've been warned. 🔥
Lovedrop retweeted
$NUAI – FOR EVERYONE WHO WANTS TO UNDERSTAND THE NUAI INVESTMENT CASE AND WHY I’M SO BULLISH. 🔥
I genuinely believe the next 60 days could completely transform NUAI, and I think the market is massively underestimating what’s coming.
Here’s what I’m expecting before mid-January:
First, a definitive 207MW lease agreement, potentially with Anthropic, on terms comparable to RIOT’s recent deal. If the agreement isn’t ready immediately, a binding LOI could be an intermediate step.
Second, approval of the air permits for the additional 550MW.
And finally, another agreement covering Phase 2, potentially bringing the total to 757MW under long-term contracts.
Remember, NUAI has already disclosed a non-binding LOI covering BOTH phases with the SAME prospective customer.
Now look at the valuation.
At my recent reference market cap of approximately $437M, NUAI reported $187M in total cash, including restricted cash, only $20M in outstanding debt and no convertible notes.
It already has 207MW of firm power secured through a 20-year agreement with Vistra.
And RIOT’s recent $28 BILLION AI infrastructure agreement demonstrates just how valuable long-term contracted capacity can become.
I’ve said this repeatedly: being late to the AI infrastructure race could turn out to be NUAI’s biggest advantage. No billions in legacy mining debt, no massive GPU investment requirements, and the opportunity to structure deals around today’s market conditions.
My personal bullish price expectations:
207MW signed: $12–15.
757MW contracted with attractive economics and financing: $20–25+.
And yes, I believe this could happen before January 15, 2027. That’s my prediction, not a guarantee.
NOW HERE’S WHAT I REALLY ENCOURAGE EVERYONE TO DO.
Don’t just follow the share price or other people’s opinions. Spend an hour understanding the actual business.
1. Read RIOT’s $28B agreement. Understand the economics and capital-efficient structure.
riotplatforms.com/riot-platf…
2. Read NUAI’s 20-year Vistra agreement. Understand the importance of securing 207MW of firm power.
globenewswire.com/news-relea…
3. Read NUAI’s Q3 earnings release. Pay attention to the LOI covering both phases, the balance sheet and the progress toward a definitive lease.
sec.gov/Archives/edgar/data/…
4. Most importantly, LISTEN to NUAI’s November 12 earnings call. Hear management explain the negotiations, financing and development plans.
edge.media-server.com/mmc/p/…
I believe once you understand all four, you’ll see why I’m so bullish.
The market is focused on 207MW. I’m looking at the potential for 757MW.
Read the agreements. Listen to management. Connect the dots.
Then make up your own mind.
I’m extremely bullish, and I’m holding. 🔥
Lovedrop retweeted
A second look into my highest upside holding $NUAI.
for more great $NUAI coverage;
@lovedropv @bitcoinbutcher1 @smallcapsnipa @fnitefiend and @alexiswrem1747 @ChairmansLedger
$NUAI me trying to keep up on all the alpha this week-end.
You should also check out and follow my boys @fnitefiend and @AlexisWrem1747
$NUAI Phase 1 Signed is Worth $10 Today
Inspired by my friend @SmallCapSnipa publishing the Northland sell side analysis, I found it appropriate to keep it simple and stick to the same format.
Warning: this analysis is for Phase 1 only, and does not include Phase 2 or Phase 3 at TCDC that will at a minimum power 1.2 GW or 6x Phase 1.
Now let's talk through some assumptions before you read the output I produced attached.
1) Rent - $riot executed for $130/kw/Month with $ant but my base case is $140 due to $NUAI being responsible for development and construction of the modular data centers versus just the powered pads and a later LOI date in September as power became harder to find in 2027
2) PUE - Northland is far too conservative as the $riot deal is 1.1. The initial LOI asked for 756 MW IT but landed on 910 MW IT because $ant opted for a simpler modular build and will be able to adjust power down during peak temperatures but will pay for the max capacity. My base case is 1.35 for now.
3) NOI / Ownership - 99% NNN and 95% for Vistra 5% share.
4) Multiple - Northland uses at 10 cap or 10x multiple but I find that cash return too high and believe 11x is more appropriate as a 9.1% cap rate is almost 4% higher than the 5.35% average of the 10 year and 20 year treasury. That's a very wide credit spread and the multiple should likely be 11.5x or 12.0x.
5) Build Cost - Same $6m assumption with 80% debt assumed.
6) DS0 - Used fully diluted shares of 160m from earnings to be conservative
7) Discount - Northland uses 11% for 2 years for a 2028 delivery but that's far too conservative as I believe delivery will be Q4 2027 given the modular build. That said, I upped the discount to 20% for one year for time value of money and execution risk.
Ted Warner just telegraphed Phase 1 delivery and most likely Phase 2 at the Cantor panel to mitigate regulatory risk upon approval of the company's air permit by starting construction as soon as possible.
I've never been more bullish on a setup because management is keeping it super simple which will result in accelerated institutional adoption as the deal structure can be digested in 5 minutes. See $riot performance following their deal versus peers.
Load up. Final call.
NFA DYOR
Lovedrop retweeted
$NUAI 🚀 Bullish takeaways from Ted Warner at Cantor Convergence + analyst upgrade:
🟢 P1: 207 MW — FULLY PERMITTED. Existing air permit secured. Protected under a registered private-use network, meaning P1 is NOT subject to Texas’s Batch Zero process. No waiting in the grid interconnection queue.
🟢 Modular Economics — Less than HALF the cost of traditional $12–14M/MW builds, while maintaining attractive rental rates. Potentially massive yields on cost.
🟢 RIOT-Style Structure — Management wants to pursue a similar low-capex modular approach, potentially reducing financing needs and dilution.
🟢 Analyst Upgrade — Price target raised $7 → $17 (+143%), largely driven by dramatically lower projected dilution.
🟢 Share Count — Fully diluted share estimate reduced from 461M → 201M (-56%).
🟢 Equity Requirements — Projected equity needs fall from $1.43B → $275M (-81%).
🟢 Lease Timing — Management targeting execution well ahead of 12/31/26.
207 MW fully permitted and outside Batch Zero. Lower capex. Less dilution. $17 analyst target before lease execution.
The setup for a major rerating is getting stronger. 🔥
$NUAI Some Saturday morning thoughts..
NUAI hasn’t signed its first lease yet. Most people read that as a weakness. I think right now it’s one of its biggest advantages.
No legacy fleet. No sunk capex in old designs. No billions already spent that need justifying.
NUAI gets to start on the new model.
The old model: traditional data centers typically run ~$12-15M per MW in capex.
The new model: $RIOT’s Corsicana lease targets ~$6M per IT MW in developer capex, including reimbursements for modular infrastructure.
On Thursday’s call, CFO Ted Warner: “we expect Phase 1 build costs to be less than half that of a comparable traditional development.”
LESS THAN HALF.
When Northland asked if this looks like the RIOT structure, Warner called it “a similar-looking structure.” And Phase 2 is expected to have a similar build cost.
The numbers aren’t perfectly comparable. The direction is clear.
The deck has a slide titled “Capital-Efficient Delivery Model.” Three levers:
Build cost below 50% of traditional
The timing of capital outlays limits upfront funding
The tenant is helping procure long-lead items
Management’s stated goal: limit how much New Era has to fund, even right after a Phase 1 lease is signed.
Now the balance sheet:
$187M total cash, $49M of it unrestricted.
$138M restricted, including approximately $118M supporting the letter of credit securing 207 MW of power for 20 years.
Once a lease is signed: up to $200M of Macquarie financing, plus the option to restructure the LC and release restricted cash.
Here’s why this matters for $NUAI shareholders.
Traditional data center development requires enormous upfront capital. Without sufficient project financing, that capital often comes from issuing equity.
For NUAI, capex per MW is potential dilution per MW.
Halve the build cost, push the outlays later and let the tenant carry procurement, and you could substantially reduce the number of shares needed to reach first rent.
Ted Warner said they are “focusing on maximizing our return on equity dollars.”
That’s the right priority for a company at this stage.
The next winners in AI infrastructure may not be the ones spending the most. They may be the ones spending the least per MW delivered... and it helps to have 207MW of power coming online in 2027 ;)
$NUAI Good update. We're getting very close.
$NUAI Q3 earnings call post with @LovedropV and @optionology.
Management says P1 lease economics are agreed. A few technical items remain, the definitive lease is unsigned, and no signing date was given.
• P1: Up to 207 MW of firm, contracted power. Fully permitted per management and outside ERCOT Batch Zero. Management compared the structure to Riot’s powered-land lease. Initial service is targeted for Q4 2027.
• LOI: The signed non-binding LOI covers P1 + P2. The prospective tenant is under exclusivity and is already helping source long-lead equipment.
• P2: Separate lease documents are in progress with the same prospective tenant. Management expects the air permit by year-end. Both phases total 757 MW gross.
Full call recap below 👇
Kash does a great job breaking down $RIOT's deal and what a similar structure could mean for $NUAI.
Worth a read. RIOT has paved the way, and now it's time for $NUAI to get across the finish line. The rerating should take care of itself.
I spent the day analyzing $RIOT's Corsicana lease with a Frontier AI Lab, and what a similar deal could mean for $NUAI.
Here are the facts on Corsicana:
- 910 critical IT MW on 1 GW gross. $130/kW-mo, escalating 3%/yr, billed on the full 910 MW whether used or not. Tenant can flex usage seasonally within the 1 GW load.
- $28B over the 15-year initial term ($54B with extensions). ~33% average unlevered yield on cost (!!)
- Capex: ~$2M/MW for the HV/MV power pad (~$1.8B), plus up to $4M/MW reimbursed to the tenant for modules (~$3.6B), paid per phase only after modules are delivered.
- Delivery: 400 MW Sep 2027, 200 MW Jan 2028, 310 MW Jul 2028. Rent starts no later than 60 days after each block is delivered.
- Equipment: first 400 MW substation is operating. No backup generation, so no air permits needed.
- Financing: base case is 80-90% LTC non-recourse project debt ($4.4 to 4.9B) on tenant credit. I believe they will have negotiated a fallback strategy if financing doesn't come to fruition.
This deal is a paradigm shift and the new gold standard for every datacenter developed out there.
Here's my read-through to $NUAI (my napkin math):
- TCDC in Ector County has 207 MW of Luminant power come Q3 2027 (Vistra gets 5% of the Phase 1 project company) and ~500 MW more planned on behind-the-meter gas.
- On the Riot structure at ~690 IT MW and $125/kW-mo: ~$19B of contract value, ~$1.3B average NOI, ~31% unlevered yield on cost. Tenant funds the modules, project debt funds most of the pad, and the equity check is under $100M.
- At a 10x NOI, with a 40% haircut on Phase 2 for the air permit, turbines and timing, I get ~$27/share in a base case, against ~$2 today, with ~10% dilution at current prices. That's $11/sh on Phase 1 alone.
Of course, it all hinges on what mgmt can deliver. NUAI still has to sign a tenant and Phase 2 needs an air permit that Texas won't process until the ERCOT audit wraps December 10th.
Q3 results and call on tap tomorrow at 8am ET.
Looking forward to it!
NFA
$NUAI LOTS of noise this week around Texas governor-elect Gina Hinojosa and what she means for data centers.
@level39 laid out why her direct power over TCEQ, PUCT and ERCOT is more limited than the headlines suggest. Worth the read on his page.
So let's flip the question. Not what she can block, but how $NUAI stacks up against what she's actually asking for.
We scored TCDC against her six "Texans First" priorities using filings, decks and management's own words.
2 strong alignments. 1 aligned by design. 3 still open.
Close enough that TCDC could become the model for how data centers get built in Texas.
Thread below with @fnitefiend and @optionology.
Scorecard for $NUAI's TCDC:
Seat at the table: STRONG ALIGNMENT
Lowering costs for Texans: STRONG ALIGNMENT
Water and power for Texans first: DESIGN ALIGNED
Full transparency (no NDAs): OPEN
Data centers pay for themselves: OPEN
American union jobs: OPEN
Not perfect. Now run the same six tests on a typical grid-queued Texas campus with a municipal water deal and a county abatement, and count how many it passes.
We've been covering $NUAI for months now. The thesis hasn't changed.
Land: owned.
Construction permits: in hand.
Phase 1 power: contracted for 20 years.
Community: engaged.
The last piece of the puzzle is a tenant. Phase 1 doesn't need the air permit, so it can be leased on its own while Phase 2 waits. We think that's the path, and we'll let the company tell us when.














