Built a $NUAI TCDC valuation model with @optionology & @lovedropv. We modeled 3 lease rates across P1+P2, using 12x after signing & 15x stabilized. Base case: $22.99 → $33.69/share. Directional model, not a PT. Assumptions below 👇
10
23
12
115
74,015
$NUAI is sitting on a multibillion-dollar asset that the market hasn’t even begun to price in. Here’s the math at $1.4M/MW in annual rent: Phase 1 (207 MW): → $290M annual rent → $4.1B asset value at a 7% cap rate At 757 MW total: → $1.06B annual rent → $15.1B asset value at a 7% cap rate These valuations assume rent approximates NOI. If tenants fund the modular data centers, NUAI avoids billions in construction costs while collecting recurring rent. The real bull case? Generating massive cash flow without massive capital investment. And 757 MW isn’t even the full 1.4 GW campus potential. The future is bright my friends.
5
6
4
57
7,684
shwogud retweeted
Permitting back on track. Matters for landing phase 1 and 2 for $NUAI dual deal on the TCDC campus..
5
56
3,586
courtesy of @dandelion12234 who sent me this and is now butthurt I didn't tag him
2
11
1,927
This. $NUAI
$NUAI – FOR EVERYONE WHO WANTS TO UNDERSTAND THE NUAI INVESTMENT CASE AND WHY I’M SO BULLISH. 🔥 I genuinely believe the next 60 days could completely transform NUAI, and I think the market is massively underestimating what’s coming. Here’s what I’m expecting before mid-January: First, a definitive 207MW lease agreement, potentially with Anthropic, on terms comparable to RIOT’s recent deal. If the agreement isn’t ready immediately, a binding LOI could be an intermediate step. Second, approval of the air permits for the additional 550MW. And finally, another agreement covering Phase 2, potentially bringing the total to 757MW under long-term contracts. Remember, NUAI has already disclosed a non-binding LOI covering BOTH phases with the SAME prospective customer. Now look at the valuation. At my recent reference market cap of approximately $437M, NUAI reported $187M in total cash, including restricted cash, only $20M in outstanding debt and no convertible notes. It already has 207MW of firm power secured through a 20-year agreement with Vistra. And RIOT’s recent $28 BILLION AI infrastructure agreement demonstrates just how valuable long-term contracted capacity can become. I’ve said this repeatedly: being late to the AI infrastructure race could turn out to be NUAI’s biggest advantage. No billions in legacy mining debt, no massive GPU investment requirements, and the opportunity to structure deals around today’s market conditions. My personal bullish price expectations: 207MW signed: $12–15. 757MW contracted with attractive economics and financing: $20–25+. And yes, I believe this could happen before January 15, 2027. That’s my prediction, not a guarantee. NOW HERE’S WHAT I REALLY ENCOURAGE EVERYONE TO DO. Don’t just follow the share price or other people’s opinions. Spend an hour understanding the actual business. 1. Read RIOT’s $28B agreement. Understand the economics and capital-efficient structure. riotplatforms.com/riot-platf… 2. Read NUAI’s 20-year Vistra agreement. Understand the importance of securing 207MW of firm power. globenewswire.com/news-relea… 3. Read NUAI’s Q3 earnings release. Pay attention to the LOI covering both phases, the balance sheet and the progress toward a definitive lease. sec.gov/Archives/edgar/data/… 4. Most importantly, LISTEN to NUAI’s November 12 earnings call. Hear management explain the negotiations, financing and development plans. edge.media-server.com/mmc/p/… I believe once you understand all four, you’ll see why I’m so bullish. The market is focused on 207MW. I’m looking at the potential for 757MW. Read the agreements. Listen to management. Connect the dots. Then make up your own mind. I’m extremely bullish, and I’m holding. 🔥
1
26
1,282
$NUAI The late-mover advantage is real. Ted Warner confirmed NUAI’s tenant is manufacturing modular data center buildings overseas and delivering them to the site. Construction can happen in parallel with site prep, potentially accelerating delivery while cutting costs by more than HALF. Now look at where the market is pricing deals: $RIOT: ~$2M/MW/year for just powered land. $CIFR: ~$1.8M/MW/year to BUILD the datacenters. NUAI benefits from the latest designs, faster deployment, and today’s lease economics. While also likely getting major help in a tough financing environment. Any company that can get a good deal in a difficult environment today is set up to THRIVE when macro improves. Sometimes being late to the game is where winners are born. 🔥
2
6
51
1,953
$NUAI 🚀 One of NUAI's most underrated advantages? No legacy Bitcoin mining business to carry into the AI era. Ted Warner made an interesting point at Cantor Convergence about why former BTC miners trade at a discount to traditional data center operators. It's not just about revenue or megawatts. It's about risk, diversification, and how much investors are willing to pay for each dollar of income. 🟢 Clean Slate — No legacy mining fleet, BTC exposure, or competing mining operations to manage. 🟢 Pure-Play AI Infrastructure — Investors can value NUAI based on contracted lease economics rather than mining profitability. 🟢 Horizontal Diversification — Ted discussed expanding through 40–50 MW projects instead of concentrating risk across multiple gigawatt-scale campuses. 🟢 Higher-Quality Tenants — Opportunities with investment-grade banks, trading firms, and inference customers. 🟢 Higher Valuation Potential — A diversified portfolio of reliable tenants could eventually command the premium valuations enjoyed by established data center operators. Here's why that last point matters: Imagine NUAI generates $100M in annual operating income. At an 8.5% cap rate, investors value those assets at ~$1.18B. But if NUAI builds a diversified portfolio of high-quality tenants, investors might accept a lower 6% cap rate, valuing those SAME assets at ~$1.67B. That's 42% more asset value without generating a single additional dollar of income. The difference? Investors are willing to pay more for income they consider safer and more predictable. The bull case isn't just that NUAI can grow earnings. It's that every dollar of those earnings could eventually become worth MORE. 🔥
2
5
2
49
3,036
$NUAI 🚀 Bullish takeaways from Ted Warner at Cantor Convergence + analyst upgrade: 🟢 P1: 207 MW — FULLY PERMITTED. Existing air permit secured. Protected under a registered private-use network, meaning P1 is NOT subject to Texas’s Batch Zero process. No waiting in the grid interconnection queue. 🟢 Modular Economics — Less than HALF the cost of traditional $12–14M/MW builds, while maintaining attractive rental rates. Potentially massive yields on cost. 🟢 RIOT-Style Structure — Management wants to pursue a similar low-capex modular approach, potentially reducing financing needs and dilution. 🟢 Analyst Upgrade — Price target raised $7 → $17 (+143%), largely driven by dramatically lower projected dilution. 🟢 Share Count — Fully diluted share estimate reduced from 461M → 201M (-56%). 🟢 Equity Requirements — Projected equity needs fall from $1.43B → $275M (-81%). 🟢 Lease Timing — Management targeting execution well ahead of 12/31/26. 207 MW fully permitted and outside Batch Zero. Lower capex. Less dilution. $17 analyst target before lease execution. The setup for a major rerating is getting stronger. 🔥
16
1
57
4,009
shwogud retweeted
$NUAI Some Saturday morning thoughts.. NUAI hasn’t signed its first lease yet. Most people read that as a weakness. I think right now it’s one of its biggest advantages. No legacy fleet. No sunk capex in old designs. No billions already spent that need justifying. NUAI gets to start on the new model. The old model: traditional data centers typically run ~$12-15M per MW in capex. The new model: $RIOT’s Corsicana lease targets ~$6M per IT MW in developer capex, including reimbursements for modular infrastructure. On Thursday’s call, CFO Ted Warner: “we expect Phase 1 build costs to be less than half that of a comparable traditional development.” LESS THAN HALF. When Northland asked if this looks like the RIOT structure, Warner called it “a similar-looking structure.” And Phase 2 is expected to have a similar build cost. The numbers aren’t perfectly comparable. The direction is clear. The deck has a slide titled “Capital-Efficient Delivery Model.” Three levers: Build cost below 50% of traditional The timing of capital outlays limits upfront funding The tenant is helping procure long-lead items Management’s stated goal: limit how much New Era has to fund, even right after a Phase 1 lease is signed. Now the balance sheet: $187M total cash, $49M of it unrestricted. $138M restricted, including approximately $118M supporting the letter of credit securing 207 MW of power for 20 years. Once a lease is signed: up to $200M of Macquarie financing, plus the option to restructure the LC and release restricted cash. Here’s why this matters for $NUAI shareholders. Traditional data center development requires enormous upfront capital. Without sufficient project financing, that capital often comes from issuing equity. For NUAI, capex per MW is potential dilution per MW. Halve the build cost, push the outlays later and let the tenant carry procurement, and you could substantially reduce the number of shares needed to reach first rent. Ted Warner said they are “focusing on maximizing our return on equity dollars.” That’s the right priority for a company at this stage. The next winners in AI infrastructure may not be the ones spending the most. They may be the ones spending the least per MW delivered... and it helps to have 207MW of power coming online in 2027 ;)
4
13
2
84
7,766
shwogud retweeted
$NUAI New Era Energy & Digital price target raised to $17 from $7 at Roth Capital Watch all the analysts upgrades come in now.
7
14
3
106
8,526
$NUAI Q3 earnings call post with @LovedropV and @optionology. Management says P1 lease economics are agreed. A few technical items remain, the definitive lease is unsigned, and no signing date was given. • P1: Up to 207 MW of firm, contracted power. Fully permitted per management and outside ERCOT Batch Zero. Management compared the structure to Riot’s powered-land lease. Initial service is targeted for Q4 2027. • LOI: The signed non-binding LOI covers P1 + P2. The prospective tenant is under exclusivity and is already helping source long-lead equipment. • P2: Separate lease documents are in progress with the same prospective tenant. Management expects the air permit by year-end. Both phases total 757 MW gross. Full call recap below 👇
3
14
5
73
9,110
shwogud retweeted
I spent the day analyzing $RIOT's Corsicana lease with a Frontier AI Lab, and what a similar deal could mean for $NUAI. Here are the facts on Corsicana: - 910 critical IT MW on 1 GW gross. $130/kW-mo, escalating 3%/yr, billed on the full 910 MW whether used or not. Tenant can flex usage seasonally within the 1 GW load. - $28B over the 15-year initial term ($54B with extensions). ~33% average unlevered yield on cost (!!) - Capex: ~$2M/MW for the HV/MV power pad (~$1.8B), plus up to $4M/MW reimbursed to the tenant for modules (~$3.6B), paid per phase only after modules are delivered. - Delivery: 400 MW Sep 2027, 200 MW Jan 2028, 310 MW Jul 2028. Rent starts no later than 60 days after each block is delivered. - Equipment: first 400 MW substation is operating. No backup generation, so no air permits needed. - Financing: base case is 80-90% LTC non-recourse project debt ($4.4 to 4.9B) on tenant credit. I believe they will have negotiated a fallback strategy if financing doesn't come to fruition. This deal is a paradigm shift and the new gold standard for every datacenter developed out there. Here's my read-through to $NUAI (my napkin math): - TCDC in Ector County has 207 MW of Luminant power come Q3 2027 (Vistra gets 5% of the Phase 1 project company) and ~500 MW more planned on behind-the-meter gas. - On the Riot structure at ~690 IT MW and $125/kW-mo: ~$19B of contract value, ~$1.3B average NOI, ~31% unlevered yield on cost. Tenant funds the modules, project debt funds most of the pad, and the equity check is under $100M. - At a 10x NOI, with a 40% haircut on Phase 2 for the air permit, turbines and timing, I get ~$27/share in a base case, against ~$2 today, with ~10% dilution at current prices. That's $11/sh on Phase 1 alone. Of course, it all hinges on what mgmt can deliver. NUAI still has to sign a tenant and Phase 2 needs an air permit that Texas won't process until the ERCOT audit wraps December 10th. Q3 results and call on tap tomorrow at 8am ET. Looking forward to it! NFA
15
16
4
90
12,978
shwogud retweeted
1/ Gov. Abbott left a kill-switch in the Texas data center permit freeze. He directed TCEQ to pause permits “until ERCOT completes its review”—the basis lapses December 10, when conditions are met. Furthermore Hinojosa's industry-wide freeze is legally vulnerable. Here's why...👇
18
56
6
344
64,532
Anthropic’s reported $3.4 billion commitment is for ~1.7 GW of heavy-duty gas-fired generators. That is almost exactly the capacity range of a full $NUAI TCDC-scale campus, and it matches the same operational reality Anthropic has disclosed: on-site or dedicated natural gas generation to get around grid constraints and timelines. $NUAI releases earnings Thursday and is expected to deliver a contract for Phase 1 and/or material business update to de-risk the stock.
Anthropic has struck a $3.4 billion deal to generate gas-fired power for its data centers, according to the Financial Times. The AI lab is skipping the usual suppliers to get hold of hard-to-find equipment as power demand climbs, the FT said. The deal comes as Anthropic presses ahead with its IPO.
3
5
3
37
2,635
Cut through the noise. Pay attention. Earnings this week 👀
$NUAI LOTS of noise this week around Texas governor-elect Gina Hinojosa and what she means for data centers. @level39 laid out why her direct power over TCEQ, PUCT and ERCOT is more limited than the headlines suggest. Worth the read on his page. So let's flip the question. Not what she can block, but how $NUAI stacks up against what she's actually asking for. We scored TCDC against her six "Texans First" priorities using filings, decks and management's own words. 2 strong alignments. 1 aligned by design. 3 still open. Close enough that TCDC could become the model for how data centers get built in Texas. Thread below with @fnitefiend and @optionology.
1
1
20
848
shwogud retweeted
1/ Everyone take a deep breath. Texas data centers aren't going anywhere. The Texas governor has very limited authority to stop them. Calls for a pause or moratorium must be approved by TCEQ—the permitting authority of Abbott appointees. Here's how Texas permitting really works👇
72
407
131
1,993
446,142
Market is in for a rude awakening soon. $CRWV does not represent the whole of NeoCloud. Balance sheet check: • $CRWV — $35.07B debt | $5.52B cash • $NBIS — $8.55B debt | $8.04B cash • $IREN — $7.71B debt | $5.90B cash
25
56
4
651
90,876