Shashank (@SBallaya) header
Shashank (@SBallaya) profile picture

El Psy Kongroo

Kalyan, MMR
Joined June 2018
Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)Photo by Shashank (@SBallaya)
Told you something was coming. 🧡 Introducing Mumbai Metro Tracker! 8 metro lines. Every station. Every fact marked as verified or reported, with sources. When does your line open? Find out 👇🏼 mumbaimetrotracker.com #MumbaiMetro #MMR
New address, same obsession with Mumbai's metro network. 👀 Now at mumbaimetrotracker.com Something's coming soon. Stay tuned! 🧡
21
26
6
141
8,945
Line 2B is now the most up-to-date page on Mumbai Metro Tracker. New front picture: the Shunya bridge in BKC, with a train running through the zero. The page also includes 51 ground photos, the most of any line, plus before-and-after views of all 19 stations.
Shunya Cable Bridge
8
18
152
5,350
So I happened to be in BKC. Post stepping out of BKC Metro station , decided to walk my way till Jio Convention Centre. A thread of what's happening in BKC. (1/6)
14
22
2
392
55,943
Shashank retweeted
You can now install Claude artifacts as desktop apps on Mac and Windows. Ask Claude to build an artifact, click "Install as app", and open it like any other app. It can use your connectors and, if you allow it, send notifications or add a menu bar item.
1,467
4,875
3,332
71,465
9,792,398
One of the best things about the infrastructure community is that we may have different opinions, perspectives and takes. We may even support or oppose certain projects. But at the end of the day, the intention is the same: the betterment of our cities and our country. The pathway towards achieving that may differ, but nobody here is actively seeking anything negative for the country. Honestly, one of the healthiest communities I am a part of.. @RahulChels @zoru75 @haldilal @Maha7Arindam @DelayMeter_IN @DotPran @preshit @dtrancemaniac @suyogyvyawahare @radioactiveiso @borolkar1 @sachin_lutenic @vinibhavi @skjy7 @runkarthikrun @0hmkar @vishal_biraia @SBallaya @Myrdm
9
5
143
3,213
Shashank retweeted
Infra Meet Up November 2026.
28
16
8
397
31,405
A new single track between Diva-Panvel track and WDFC track comming up captured at Katai Naka, Dombivli From Single line Diesel to Single line DC Electric to Double line DC to AC electric.Diva Panvel route came longway @trainwalebhaiya @Central_Railway @rajtoday
3
14
161
5,946
Skipping Manufacturing meant that people think the only way the country can progress is desk jobs or agriculture. Neither can provide higher incomes for vast majority of the country.
Women of Wadhavan proudly proclaim “We don’t need Wadhavan Port, it’s our Sea, it’s our livelihood”. Sea of people can be seen in Varor, Dahanu today to protect their sea against the land filling work done by Adani for the Vadhavan Port project.
1
50
2
310
2,938
Shashank retweeted
Mumbai’s water metro is here 😍😍
India’s First 100% Electric Hydrofoil Vessel Undergoes Successful Trials in Maharashtra! A major milestone in India’s sustainable maritime journey! India’s first fully electric Candela P-12 hydrofoil vessel, imported from Sweden, is undergoing successful trials in Maharashtra. Under the visionary leadership of Hon’ble Chief Minister Shri Devendraji Fadnavis and Minister of Ports Shri Niteshji Rane, this joint initiative of the Government of Maharashtra, Rural Enhancers Group, and Saadhav Shipyards Limited showcases the Maharashtra Maritime Board’s commitment to bringing world-class maritime technologies to India, positioning Maharashtra at the forefront of sustainable water transportation. @Dev_Fadnavis @CMOMaharashtra
1
6
89
2,658
"Mumbai is killing all trees and mangroves" Shut up Shanaya, let the engineers do their job. Actual drawings from the North Coastal Road DPR consultant. We're spending a shit tonne of money by going elevated + underground to ensure the mangroves are not disturbed at-grade. Post pilling, all the mangroves will grow back around piers. Stop this random fearmongering. And if you are so fond of trees, leave the city and live in some jungle with bibtyas. Everyone wants to cry WEH is choked, waste millions of man hours in traffic while raking up massive carbon emissions... but when the government comes up with solutions, again cry why we are doing development. Habitual cry-babies.
6
76
1
480
10,288
The tender for the General Consultant, released today, brought greater clarity to the Palms Water-Vitthalwadi Flyover. Prem Auto/Bhawani Chowk to Vitthalwadi Ramp Level 1 Syndicate to Vitthalwadi Ramp Level2 Metro Line 5A Level 3
After almost a year, work has resumed on the Palms Water-Vitthalwadi connector bridge on the Kalyan West side. This comes after the Line 5A alignment was clarified in the tender documents released following last week’s announcement.
4
2
16
681
I apologise; I missed a few details in the Line 5A tender documents, but today's GC tender makes things much clearer. Only a few piers are common to both the flyover and the metro, so the Palms Water section becomes another watchpoint.
2
2
144
A look at MMRDA's upcoming Elevated Road from Syndicate-Kalyan to Shantinagar-Ulhasnagar and then to Katemanivali-Kalyan East and Ulhasnagar - 5. This will decongest Rambaug and Agra Road in Kalyan.
65
Lesssgooo 🚀
MMRDA has invited bids for the Appointment of General Consultant for the Mumbai Metro line 5 Phase III (Durgadi to Kalyan) and Metro line 5A (Bhoirwadi to Ulhasnagar).
1
24
493
So this is Panvel railway station back in 1998. In the quoted post, that's the suburban railway station under construction. In this post, that's the present day Platform number 5.
A very rare picture. Hint: it's part of CR. Guess the station.
1
3
1
43
1,330
Juhu Circle toh jhaanki hai, Bandra-Kurla abhi baaki hai.
Replying to @Maha7Arindam
Yeh toh bas ek jhaanki hai, Shunya Bridge abhi baaki hai
1
7
63
1,456
Shashank retweeted
2,038
9,991
3,311
119,396
12,996,914
Shashank retweeted
Mumbai’s east–west Metro link has crossed another construction milestone: all 12 girders at Juhu Circle have been erected for MMRDA’s Metro Line 2B, Phase 2. The 7.167-km DN Nagar–Saraswat Nagar section will serve six stations, bringing Metro connectivity to Juhu, Prem Nagar, Indira Nagar, Nanavati Hospital, Khira Nagar and Saraswat Nagar. It will connect with Metro Lines 1 and 2A at DN Nagar and provide access to Santacruz suburban railway station through Khira Nagar Metro station. With Phase 1 already operational between Mandale and Chembur, this western section advances the development of the full 23.643-km, 19-station corridor. Once complete, Line 2B will link Andheri West with BKC and Mandale, strengthening east–west travel and opening up onward connections towards North Mumbai and MMR. #MMRDA #MetroLine2B #MumbaiMetro #MumbaiInMinutes #ReshapingMMR @Dev_Fadnavis @mieknathshinde @DrSanMukherjee
70
41
27
307
23,773