Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
Is there a solution or just a reinstall? #Construction
1
1
4
672
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
Roof framing efficiency relies on repeatable datum location and minimizing out of position rework, especially when operating on timber wall plates without a dedicated ground crew.
Smooth shank wire nails have terrible axial withdrawal resistance. especially when driven into unseasoned timber that shrinks as it dries. If you want a roof truss system that resists wind uplift and shear without splitting, look at structural timber screws and proper bearing joinery.
1
1
1
2,756
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
Nobody measures where bathroom hardware goes and it shows. Most towel bars and toilet paper holders get mounted wherever the installer’s tape measure happens to land. Once the tile is drilled, you can’t move them. Here are the exact mounting heights that actually work in real life: 1/ The Towel Bar 48"(1.2m)Off the Floor: Any lower and your bath towels drag, any higher and shorter people are stuck reaching. Mount it where you can grab a towel straight out of the shower. 2/ Robe & Towel Hooks 66" to 72" (1.68m to 1.83m) Off the Floor: Hooks need to go higher than you think so a long robe hangs completely clear of the ground. Put one right next to the shower within easy arm’s reach of the door. 3/ The Toilet Paper Holder 26" High / 8–12" Forward: Mount it 26 inches off the floor and 8 to 12 inches in front of the front edge of the toilet bowl. Too far forward and you’re leaning, too far back and you’re twisting around to reach it. 4/ The Pre-Tile Rule: Mark every single one of these spots on the wall before the tile goes up. Your accessories need to land cleanly on a grout line and anchor into solid wood blocking behind the wall. because once they’re up, there are no do overs.
1
2
517
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
If your interior design includes recessed led cove lighting, linear slot diffusers, or floor to ceiling windows, standard hand troweled screeding will fail visually. Grazing light magnifies even millimeter surface undulations into harsh shadows. Technique required to achieve a true wall finish.
2
2
1
8
1,284
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
This is what a controlled foundation lift looks like. After installing deep steel piers beneath the foundation, hydraulic pressure is applied to transfer the load and carefully recover the settled structure.
3
7
56
10,356
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
What's the easiest trade in construction?
1
1
296
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
ASMR ragebait edition. This demonstrates the exact mechanical failure modes that happen when carpenters skip proper mortising and fastening methods on site.
1
1
1
1,749
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
Would you renovate this or demolish it? #Civilengineers
2
1
1
7
1,135
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
In a world video game addicted kids be this one. - 12 years old, Jimmy Legendary 🫢🏻🫢🏻 Well done kid! πŸ‘Š
142
323
27
3,324
170,780
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
Wire mesh down for stronger concrete. πŸ’ͺπŸ—οΈ #Construction
5
4
1
52
7,316
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
four things are killing homebuilding at the same time. > tariffs made materials more expensive > high interest rates made buyers disappear > immigration enforcement removed the labor force the industry runs on > capital that used to fund developments is now funding data centers and yet somehow the homebuilder is the one getting blamed for not building enough.
2
4
125
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
Roof framing explained in a thread. Here are the 6 core parts that make the whole structure work: πŸ§΅πŸ‘‡
2
3
1
18
128,205
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
10 mistakes every new general contractor makes (based on what i've seen) 1. buying the image before building the business 2. relying entirely on referrals 3. saying yes to every job 4. taking a job that is too big, too soon 5. treating licensing and insurance as something to sort out later 6. mixing personal and business money 7. doing extra work on a handshake 8. hiring wherever the pain feels loudest 9. ignoring the gap between spending and getting paid 10. pricing without knowing the full cost did i miss anything?
2
1
5
240
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
Replying to @lanrycool
Definitely the contractor/project manager
1
1
247
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
Contractor or project manager. You are literally on your toes until the job is properly done.
Who actually has the hardest job on a construction site?
1
1
5
407
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
If your finishes are imported, order them at roof level, not when the shell is done.
1
126
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
Special Brick Detail as FinsπŸ—πŸ›‘ Controlling light and ventilation ⚑ #Architecture #Design
2
2
2
18
916
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
Climate responsive design is non-negotiable.Bringing light in and controlling it is the true art of architecture.
1
5
302
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
When you actually consolidate concrete properly. By using a poker vibrator inside the column, you eliminate all air pockets.
3
9
815
Qs Lanre πŸ‘·πŸΎβ€β™‚οΈ retweeted
The Art of Concrete Finishing. πŸš§πŸ’―
8
6
1
47